Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Extractive resources
Split zoning – environmental management and conservation and recreation and open space zones
Land Uses existing park, environmental areas, car parks, cemeteries, clubs, community uses and utilities.
(2) The planned density for future development is stated in Table SC3.1.3 in Schedule 3—Local government infrastructure plan
mapping and tables.
(3) A summary of the assumptions about future residential and nonresidential development for the planning scheme area is stated
in Table 4.2.2—Residential dwellings and nonresidential floor space assumptions summary.
Table 4.2.2 Residential dwellings and nonresidential floor space assumptions summary
Column 1 Base Ultimate
Description date 2016 2021 2026 2031 development
Residential dwellings 29,963 31,278 33,281 34,681 43,579
Nonresidential floor 904,436 983,206 1,059,100 1,119,914 1,429,116
space (m² GFA)
(4) Detailed assumptions about future development for each projection area and LGIP development type are identified in the following
tables in Schedule 3 Local government infrastructure plan mapping and tables:
(a) for residential development, Table SC3.1.4
(b) for nonresidential development, Table SC3.1.5
4.2.3 Infrastructure demand
(1) The demand generation rate for a trunk infrastructure network is stated in Column 4 of Table SC3.1.3 in Schedule 3 Local
government infrastructure plan mapping and tables.
(2) A summary of the projected infrastructure demand for each service catchment is stated in:
(a) for the stormwater network, Table SC3.1.6
(b) for the transport network, Table SC3.1.7
(c) for the parks and land for community facilities network, Table SC3.1.8
4.3 Priority Infrastructure area
(1) The priority infrastructure area identifies the area prioritised for the provision of trunk infrastructure to service the existing and
assumed future urban development up to 2031.
(2) The priority infrastructure area is identified on Local Government Infrastructure Plan Maps LGIPPIASC1 to LGIPPIASC11 LGIP
Priority Infrastructure Area and Service Catchments.
4.4 Desired standards of service
(1) This section states the key standards of performance for a trunk infrastructure network.
(2) Details of the standard of service for a trunk infrastructure networks are identified in the extrinsic material.
Stormwater network Table 4.4.1 Stormwater desired standards of service
QUANTITATIVE STANDARDS (primarily about the capacity of the network)
ITEM DESIRABLE STANDARD
In accordance with Urban Stormwater Management Strategy, Noosa Council 2002 (Version 1 Revision 2 dated 8 August
Overall 2006), to Manage Stormwater Quantity to Ensure flooding impacts are minimised and environmental base flows in creeks
objective and rivers are maintained.
In accordance with:
Design Planning Scheme Policy 6 Engineering Design Standards;
The Noosa Plan, Water Quality and Drainage Code
QUALITATIVE STANDARDS (primarily about the performance of the network)
ITEM DESIRABLE STANDARD
In accordance with:
Environmental Protection (Water) Policy 2009;
NOOSA PLAN 2020 Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.