2020-07-16 SM Agenda - Item 1 - Attachment 3 - Final Noosa Plan 2020 Part 4-6

of 320

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                  Extractive resources
                  Split zoning – environmental management and conservation and recreation and open space zones
                  Land Uses ­ existing park, environmental areas, car parks, cemeteries, clubs, community uses and utilities.


 (2)    The planned density for future development is stated in Table SC3.1.3 in Schedule 3—Local government infrastructure plan
        mapping and tables.
 (3)    A summary of the assumptions about future residential and non­residential development for the planning scheme area is stated
        in Table 4.2.2—Residential dwellings and non­residential floor space assumptions summary.

 Table 4.2.2 ­ Residential dwellings and non­residential floor space assumptions summary
 Column 1                    Base                                                                                                     Ultimate
 Description                 date 2016                2021                      2026                       2031                       development
 Residential dwellings       29,963                   31,278                    33,281                     34,681                     43,579
 Non­residential floor       904,436                  983,206                   1,059,100                  1,119,914                  1,429,116
 space (m² GFA)


 (4)    Detailed assumptions about future development for each projection area and LGIP development type are identified in the following
        tables in Schedule 3 Local government infrastructure plan mapping and tables:
        (a)   for residential development, Table SC3.1.4
        (b)   for non­residential development, Table SC3.1.5


 4.2.3                Infrastructure demand

 (1)    The demand generation rate for a trunk infrastructure network is stated in Column 4 of Table SC3.1.3 in Schedule 3 Local
        government infrastructure plan mapping and tables.
 (2)    A summary of the projected infrastructure demand for each service catchment is stated in:
        (a)   for the stormwater network, Table SC3.1.6
        (b)   for the transport network, Table SC3.1.7
        (c)   for the parks and land for community facilities network, Table SC3.1.8

 4.3                  Priority Infrastructure area
 (1)    The priority infrastructure area identifies the area prioritised for the provision of trunk infrastructure to service the existing and
        assumed future urban development up to 2031.
 (2)    The priority infrastructure area is identified on Local Government Infrastructure Plan Maps LGIP­PIA­SC­1 to LGIP­PIA­SC­11 LGIP
        Priority Infrastructure Area and Service Catchments.

 4.4                  Desired standards of service
 (1)    This section states the key standards of performance for a trunk infrastructure network.
 (2)    Details of the standard of service for a trunk infrastructure networks are identified in the extrinsic material.


 Stormwater network                 Table 4.4.1 Stormwater desired standards of service
 QUANTITATIVE STANDARDS (primarily about the capacity of the network)
 ITEM             DESIRABLE STANDARD
                   In accordance with Urban Stormwater Management Strategy, Noosa Council 2002 (Version 1­ Revision 2 dated 8 August
 Overall          2006), to Manage Stormwater Quantity to Ensure flooding impacts are minimised and environmental base flows in creeks
 objective        and rivers are maintained.
                  In accordance with:
 Design                       Planning Scheme Policy 6 ­ Engineering Design Standards;
                              The Noosa Plan, Water Quality and Drainage Code
 QUALITATIVE STANDARDS (primarily about the performance of the network)
 ITEM             DESIRABLE STANDARD
                  In accordance with:
                             Environmental Protection (Water) Policy 2009;


NOOSA PLAN 2020                                                                                                                          Page 4 of 11
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 3 - Final Noosa Plan 2020 Part 4-6(PDF, 9MB).pdf · 9.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.