GENERAL NOTES EARTHWORKS / EXCAVATION
1. DO NOT SCALE DRAWINGS. GENERAL:
LAKE DOONELLA 2. ALL DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT FOR CLARIFICATION BEFORE PROCEEDING. 1. ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED PRIOR TO COMMENCEMENT OF EXCAVATION.
GO
3. THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IN WRITING OF ALL VARIATIONS ARISING FROM THE CLARIFICATION 2. ALL EARTHWORKS ACTIVITIES INCLUDING STRIPPING, EXCAVATION, FILLING, COMPACTION AND TESTING, IS TO BE
OD
OF THE DISCREPANCY. UNDERTAKEN IN ACCORDANCE WITH MRTS04, THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT AUSTRALIAN
CH
4. THE CONTRACTOR SHALL SUBMIT DETAILS OF ANY ADDITIONAL COST ARISING FROM A VARIATION TO THE SUPERINTENDENT STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE ENGINEER.
AP
FOR APPROVAL, BEFORE PROCEEDING WITH THE WORKS. 3. STOCKPILES SHALL BE COVERED WITH TARPS.
5. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT 4. EARTHWORKS SHOULD AVOID THE EROSION OR SILTATION OF ADJOINING LANDS, STREAMS OR WATERCOURSES.
AUSTRALIAN STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE 5. ALL EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY OPERATIONAL PRIOR TO COMMENCEMENT OF
SUPERINTENDENT. EARTHWORKS.
6. NO WORK IS TO COMMENCE ON SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN WRITING AND AN OFFICIAL 6. EARTHWORKS SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.
PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE ENGINEER HAVE BEEN HELD. THE CONTRACTOR IS TO
ST
OBTAIN A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH THE REQUIREMENTS THEREOF.
RE
7. ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT WORK PLACE HEALTH AND SAFETY LEGISLATION. TOPSOIL:
ET
SITE 8. A MINIMUM OF 24 HOURS NOTICE IS REQUIRED FOR ALL ENGINEERING INSPECTIONS, WHERE POSSIBLE. 7. PRIOR TO ANY EARTHWORKS ACTIVITIES, TREE STUMPS, BUILDING DEBRIS, ORGANIC RICH TOPSOIL AND SEVERELY ROOT
AFFECTED AREAS MUST BE REMOVED.
9. THE WORK AREA WILL BE MINIMISED TO FACILITATE CONSTRUCTION WHILST ENABLING CONTINUAL OPERATIONS OF THE
NEIGHBOURING AREA, TO THE SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT. 8. ORGANIC RICH TOPSOIL MUST NOT BE USED IN FILL. IT SHALL BE STOCKPILED FOR RE-USE IN LANDSCAPING OR DISPOSED OF.
TOPSOIL STOCKPILES SHALL NOT EXCEED 2m IN HEIGHT.
DRIVE
10. WORKING HOURS, COMMUNICATIONS PROTOCOLS, SITE ACCESS, AREA FOR CONTRACTORS FACILITIES/STORAGE AND SITE
SECURITY TO BE AGREED WITH THE PRINCIPAL AND SUPERINTENDENT.
VENTU DRIVE
RE 11. THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED; STOCKPILE MANAGEMENT:
● CONSTRUCTION PRE-START MEETING 9. CONTRACTOR TO ENSURE STOCKPILES ARE NOT LOCATED IN A POSITION WHERE THEY COULD BE WASHED INTO A GUTTER,
CT
● SET OUT DRAIN OR WATER BODY, SUCH AS:
● DEMOLITION ● ON A ROAD PAVEMENT;
VISION
E ● FINAL INSPECTION ● WITHIN AN OVERLAND FLOW PATH;
DRIV ● ADJACENT TO STREAM BANKS.
UE
NDS 12. THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN, ENVIRONMENTAL
HLA
EN
BUS W
MANAGEMENT PLAN AND WORK PLACE HEALTH AND SAFETY PLAN FOR REVIEW AND APPROVAL OF PRINCIPAL AND 10. CONTRACTOR TO ENSURE STOCKPILES ARE COVERED WITH A TARP OR OTHER IMPERVIOUS COVER. LONG TERM STOCKPILES
AV
AL SUPERINTENDENT, PRIOR TO CONSTRUCTION. CAN BE COVERED WITH MULCH OR TEMPORARY VEGETATION (GRASS).
PROJE TE
CT R
HA 13. FOLLOWING COMPLETION OF THE WORKS THE CONTRACTOR SHALL CLEAN UP THE SITE AND DEMOBILISE TO THE 11. ENSURE APPROPRIATE DUST CONTROL MEASURES EXIST FOR ALL STOCKPILES. ENSURE AN APPROPRIATE SEDIMENT
Y SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT. CONTROL SYSTEM IS LOCATED DOWN-SLOPE OF ALL STOCKPILES.
DR
IV
Y
E
A
GATEW
SURVEY SITE REHABILITATION:
1. THIS DESIGN IS BASED ON SURVEY PROVIDED BY MURRAY AND ASSOCIATES. 12. ENSURE THE SOIL SURFACE IS SCARIFIED PRIOR TO THE PLACEMENT OF TOPSOIL TO BREAK UP ANY EXCESSIVE COMPACTION,
2. ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD). AND ENABLE THE APPROPRIATE KEYING OF THE SOIL LAYERS.
3. THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS, FEATURES AND UTILITIES PRIOR TO CONSTRUCTION. 13. SCARIFY LIGHTLY COMPACTED SOILS TO A MINIMUM DEPTH OF 100mm AND HEAVILY COMPACTED SUBSOILS TO A MINIMUM
D DEPTH OF 300mm.
ROA 4. ALL ELEMENTS OF PROPOSED WORK TO BE SETOUT AND CHECKED BY THE CONTRACTOR'S LICENSED SURVEYOR AND ANY
SA
NOO 14. TURF MUST NOT BE PLACED ON EXCESSIVELY COMPACTED SOILS.
U NDI- DISCREPANCIES ARE TO BE REPORTED TO THE SUPERINTENDENT.
EUM EE
NIE 15. ALL SITE REHABILITATION MEASURES SHOULD BE MONITORED, PARTICULARLY AFTER RAINFALL.
CR
E EK EXISTING SERVICES
RO EROSION & SEDIMENT CONTROL
AD 1. THE LOCATION OF ALL IN-GROUND AND OVERHEAD SERVICES HAS BEEN DETERMINED FROM FIELD SURVEY, DIAL BEFORE YOU
DIG ENQUIRIES AND INFORMATION PROVIDED BY THE SERVICE PROVIDERS / AUTHORITIES. OBJECTIVES:
2. THE SERVICES ARE SHOWN ON THESE DRAWINGS FOR INFORMATION ONLY AND NO RESPONSIBILITY IS TAKEN FOR THE 1. THESE DRAWINGS ARE PROVIDED FOR GUIDANCE ONLY. THE CONTRACTOR SHALL ASSESS WHAT MEASURES ARE REQUIRED
ACCURACY OR COMPLETENESS OF THE INFORMATION SUPPLIED. TO SUIT THE PROPOSED CONSTRUCTION METHODOLOGY AND STAGING.
3. NOT ALL EXISTING SERVICES HAVE NECESSARILY BEEN IDENTIFIED AND SHOWN ON THE DRAWINGS. 2. THE CONTRACTOR SHALL COMPLY WITH ALL STATUTORY REGULATIONS DURING THE CONSTRUCTION PHASE AND
LOCALITY PLAN 4. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING SERVICES ON THE SITE PRIOR TO COMMENCING WORKS. MAINTENANCE PERIOD.
NOT TO SCALE 3. EROSION AND SEDIMENTATION CONTROL MAY BE AIDED BY MINIMISING THE AREA OF DISTURBANCE.
5. NO WORK IS TO BE UNDERTAKEN OVER OR WITHIN 3m OF EXISTING SERVICES PRIOR TO NOTIFICATION TO THE APPROPRIATE
AUTHORITIES.
6. EXISTING VALVES, HYDRANTS, PITS, ACCESS CHAMBERS AND OTHER UTILITIES SHALL BE MODIFIED WHERE NECESSARY TO MANAGEMENT PRINCIPLES:
SUIT FINAL FINISHED SURFACE LEVELS. 4. THE MANAGEMENT PRINCIPLES EMPLOYED IN THESE DRAWINGS ARE IN ACCORDANCE WITH THE 'BEST PRACTICE EROSION
AND SEDIMENT CONTROL' MANUAL, PUBLISHED BY THE INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA). THE BASIC
TRAFFIC MANAGEMENT PRINCIPLES ARE TO:
● MINIMISE THE AREA OF DISTURBANCE;
1. NO WORK IS TO BE UNDERTAKEN UNDER OR ADJACENT TO LIVE TRAFFIC WITHOUT A PRE-APPROVED TRAFFIC CONTROL PLAN. ● CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;
2. THE CONTRACTOR IS TO ENSURE THAT ALL NECESSARY PERMITS ARE GRANTED AND MEASURES ARE ONLY IN PLACE WITHIN ● MINIMISE EROSION;
THE APPROVED HOURS STIPULATED. ● MINIMISE SEDIMENTATION;
3. THE CONTRACTOR SHALL ENSURE THAT ALL MEASURES ARE INSTALLED IN ACCORDANCE WITH THIS APPROVED TRAFFIC ● PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE.
CONTROL PLAN INCLUDING TEMPORARY SIGNS, BARRIERS, LIGHTS ETC.
4. THE CONTRACTOR SHALL NOMINATE A REPRESENTATIVE TO IMPLEMENT, MONITOR AND ADDRESS ALL TRAFFIC MANAGEMENT CONSTRUCTION PRE-START MEETING:
ISSUES. 5. THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES, SUCH AS:
5. ALL TRAFFIC CONTROL MEASURES SHOULD CAUSE THE MINIMUM DISRUPTION POSSIBLE TO ALL OTHER USERS, INCLUDING ● KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN;
MOTORISTS AND PEDESTRIANS. ● REQUIRED WATER QUALITY OBJECTIVES;
● PERFORMANCE MONITORING AND INSPECTION PROCEDURES;
DRG NO REVISION DRAWING TITLE ● IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS;
CLEARING, GRUBBING AND DISPOSAL ● IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS;
18556-C001 A BULK EARTHWORKS LOCALITY PLAN & NOTES
1. CLEARING SHOULD NOT OCCUR UNLESS PRECEDED BY THE INSTALLATION OF ALL NECESSARY EROSION AND SEDIMENT ● REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS.
18556-C002 A BULK EARTHWORKS GENERAL ARRANGEMENT CONTROL MEASURES. THE EXCEPTION WOULD BE ANY CLEARING NECESSARY TO ALLOW INSTALLATION OF THESE CONTROL
MEASURES.
18556-C003 A BULK EARTHWORKS SECTIONS SITE INSPECTION AND MONITORING:
2. CLEARING SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.
18556-C004 A BULK EARTHWORKS EROSION & SEDIMENT CONTROL PHASE 1 6. CONTRACTOR SHALL NOMINATE A PERSON RESPONSIBLE FOR INSTALLATION, MONITORING AND MAINTENANCE OF CONTROL
3. ESTABLISH ANY NON-DISTURBANCE OR EXCLUSION AREAS IDENTIFIED. MEASURES (E.G. SITE FOREMAN).
18556-C005 A BULK EARTHWORKS EROSION & SEDIMENT CONTROL PHASE 2 & 3
4. WHERE APPROPRIATE, IDENTIFY, ISOLATE AND/OR PROTECT RETAINED VEGETATION. 7. ALL EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE INSPECTED:
5. CLEARING SHALL BE MINIMISED TO ONLY THE TREES AND VEGETATION NECESSARY TO UNDERTAKE THESE WORKS. ● AT LEAST DAILY WHEN RAIN IS OCCURRING;
6. A SPOTTER-CATCHER SHOULD BE PRESENT DURING ALL CLEARING OPERATIONS. ● AT LEAST WEEKLY (EVEN IF WORK IS NOT OCCURRING ON-SITE);
● WITHIN 24 HOURS PRIOR TO EXPECTED RAINFALL;
7. CLEARING AND GRUBBING INCLUDES REMOVAL OF THE MAIN TREE ROOTS TO A MINIMUM DEPTH OF 1.0m AND THE REMOVAL ● WITHIN 18 HOURS OF A RAINFALL EVENT.
OF SURFACE ROOTS AND VEGETABLE MATTER FROM THE TOP 0.3m BELOW THE NATURAL SURFACE LEVEL.
8. CONTRACTOR TO CHECK AFTER RAINFALL FOR PERFORMANCE INDICATORS SUCH AS EVIDENCE OF EXCESSIVE FLOW
8. DISPOSAL OF ALL CLEARED VEGETATION AND RUBBISH SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE LOCAL CONCENTRATIONS, EROSION PATHS DEVELOPING, SILT AND SEDIMENT ACCUMULATION.
AUTHORITY.
9. CONTRACTOR TO CHECK DURING RAIN THAT FLOWS ARE NOT BYPASSING CONTROL MEASURES.
9. CLEARED VEGETATION CAN BE PROCESSED THROUGH WOOD CHIPPING AND THE MULCH PRODUCED PLACED IN INTERIM
STOCKPILES FOR LATER USE IN EROSION AND SEDIMENT CONTROL OR LANDSCAPING PURPOSES. 10. WHEN A SITE INSPECTION DETECTS A NOTABLE FAILURE IN THE ADOPTED MEASURES, THE SOURCE OF THIS FAILURE MUST BE
INVESTIGATED AND THE APPROPRIATE AMENDMENTS MADE TO THE SITE CONTROLS.
11. THE CONTRACTOR SHALL MAINTAIN A WRITTEN RECORD OF DATES OF ALL INSPECTIONS INCLUDING ANY CORRECTIVE
ACTIONS TAKEN.
J:\2018\18556sd2_Subdivision_64_Gateway_Drive_Noosaville\4.CADD\#ACAD\18556_CIVIL_PRELIM.dwg
REFER DRAWING NO 18556-P001 FOR PROJECT NOTES
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
This drawing is subject to JF DR
copyright in accordance with the 64 GATEWAY DRIVE PTY LTD Designed Verified
64 GATEWAY DRIVE, NOOSAVILLE BULK EARTHWORKS A1
agreement between Tod
Consulting pty ltd (tc) and tc's
client. This drawing shall only be
Sunshine Coast:
13/6-12 Bottlebrush Ave
JF DR LOCALITY PLAN & NOTES Drawing Number
used for this specific project. martoo
consulting
P.O.Box 1684
Noosa Heads QLD 4567
Ph: 07 5455 2550
Approved
D REYNOLDS
RPEQ No
9072 RDP LOT 13 ON SP170295 18556-C001
This drawing shall not be used pty ltd
Noosa: 07 5449 9600 LOCAL AUTHORITY NOOSA COUNCIL
Gympie: Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
Signed MCU APPROVAL HORIZ DATUM LOCAL 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as town planners + 38 Nash Street PO Box 61, Noosaville, QLD 4566
A 26.04.19 OPW APPLICATION JF P.O. Box 391 ROL APPROVAL VERT DATUM AHD
'issued for construction' in the
revision description. Rev Date Revision Description Drawn
urban designers
+ surveyors
Gympie QLD 4570
Ph: 07 5482 7440
[email protected] www.todconsulting.com
ABN 39 128 805 336
26.04.19 OPW APPROVAL RL DATUM PSM 13296 MEASUREMENT BAR - INCREMENTS IN mm
1 of 5 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
A B C D
C003 C003 C003 C003
CLEARING SHALL BE KEEP TO THE MINIMUM
NECESSARY TO UNDERTAKE THE WORKS.
DSIL 3.176
FLICKER TAPE & NO GO ZONE SIGNAGE SHALL
F04 BE INSTALLED TO THE LIMIT OF CLEARING.
LIMIT OF CLEARING
F03
F05
3m
01
04
08
15
19 23
EXISTING
0
5
5.0
EXISTING 5.2 HOLLOW
MOUND
3m
E 05 09 16 20
02
EXISTING Ø1050 RCP
C003 24
10 11
4.75
0 5 0 3.75
4.5 4.2 4.0
12
JOINS BELOW
06
F 17 21
13
C003
USIL 3.313
03 07
14 18 22
F06
GATEWAY DRIVE
FUTURE BUILDING LAYOUT AS PER MCU
132007.738.02 APPROVED PLAN "SHEET NO 1"
PREPARED BY SMARTARCH (TYP)
23
LEGEND
3m
SITE RP BOUNDARY
E
ADJACENT RP BOUNDARIES
24 C003
EXISTING STORMWATER
EXISTING SEWER LIM
EXISTING WATER IT
OF
EXISTING CONTOUR (0.50m INTERNALS) CL
EA
RI
0 5
PROPOSED CONTOUR MAJOR (1.0m INTERVALS) NG
4.0 4.2
PROPOSED CONTOUR MAJOR (0.25m INTERVALS)
PROPOSED EARTHWORKS PLATFORM
JOINS ABOVE
PROPOSED TOP OF BANK
3.75
PROPOSED TOE OF BANK
PROPOSED TEMPORARY VEGETATION
PROTECTION FENCING
EXTENT OF VEGETATION F02
EARTHWORKS SETOUT CO-ORDINATES
LANDSCAPE BUFFER ZONE POINT EASTING NORTHING FSL POINT EASTING NORTHING FSL
01 504161.243 7079305.060 5.300 14 504226.196 7079246.208 5.050
ENVIRONMENTAL BUFFER ZONE 02 504161.766 7079292.703 5.350 15 504250.667 7079287.453 4.360 VEGETATION PROTECTION
03 504153.555 7079263.523 5.500 16 504249.231 7079278.568 4.450 FENCING SETOUT F
04 504186.157 7079299.962 5.150 17 504245.144 7079253.276 4.750 POINT EASTING NORTHING
TEMPORARY SEDIMENT BASIN 25 C003
05 504184.393 7079289.047 5.230 18 504243.548 7079243.404 4.850 F01 504354.6602 7079223.5327
06 504181.476 7079270.936 5.395 19 504298.090 7079278.776 3.660 F02 504357.6014 7079241.7040
3.0m WIDE CONSTRUCTION ZONE 07 504179.588 7079259.315 5.500 20 504296.814 7079270.878 3.750
J:\2018\18556sd2_Subdivision_64_Gateway_Drive_Noosaville\4.CADD\#ACAD\18556_CIVIL_PRELIM.dwg
F03 504314.5334 7079282.9650
08 504203.244 7079296.130 5.050 21 504292.726 7079245.586 4.250 F04 504165.2304 7079307.8895
09 504201.648 7079286.258 5.150 22 504291.131 7079235.714 4.350 F05 504157.5510 7079307.7381
EARTHWORKS DEPTHS (0.5m INCREMENTS)
CUT FILL
10 504199.025 7079279.669 5.230 23 504311.702 7079276.330 3.460 F06 504149.5532 7079256.6730
11 504214.892 7079277.187 5.000 24 504322.414 7079266.741 3.490 26
12 504223.309 7079266.438 4.960 25 504357.794 7079235.071 3.600
EARTHWORK VOLUMES (NO BULKING) F01
13 504227.792 7079256.080 4.950 26 504356.199 7079225.199 3.650
CUT VOLUME 2,713 m³
FILL VOLUME 2,008 m³
EXCESS CUT TO SPOIL 705 m³
REFER DRAWING NO 18556-P001 FOR PROJECT NOTES
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
This drawing is subject to JF DR
copyright in accordance with the 64 GATEWAY DRIVE PTY LTD Designed Verified
64 GATEWAY DRIVE, NOOSAVILLE BULK EARTHWORKS 1 : 250 A1
agreement between Tod
Consulting pty ltd (tc) and tc's
client. This drawing shall only be
Sunshine Coast:
13/6-12 Bottlebrush Ave
JF DR GENERAL ARRANGEMENT Drawing Number
used for this specific project. martoo
consulting
P.O.Box 1684
Noosa Heads QLD 4567
Ph: 07 5455 2550
Approved
D REYNOLDS
RPEQ No
9072 RDP LOT 13 ON SP170295 18556-C002
This drawing shall not be used pty ltd
Noosa: 07 5449 9600 LOCAL AUTHORITY NOOSA COUNCIL
Gympie: Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
Signed MCU APPROVAL HORIZ DATUM LOCAL 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as town planners + 38 Nash Street PO Box 61, Noosaville, QLD 4566
A 26.04.19 OPW APPLICATION JF P.O. Box 391 ROL APPROVAL VERT DATUM AHD
'issued for construction' in the
revision description. Rev Date Revision Description Drawn
urban designers
+ surveyors
Gympie QLD 4570
Ph: 07 5482 7440
[email protected] www.todconsulting.com
ABN 39 128 805 336
26.04.19 OPW APPROVAL RL DATUM PSM 13296 MEASUREMENT BAR - INCREMENTS IN mm
2 of 5 A
Page 3
10.000
10.000
LANDSCAPE
LANDSCAPE
BUFFER ZONE
BUFFER ZONE
7.000
7.000
VEGETATION
3.000 VEGETATION
PROTECTION 3.000
CONSTRUCTION PROTECTION
ZONE CONSTRUCTION
ZONE ZONE
ZONE
EMT
RP BDY
DIRTY WATER DIVERSION BUND
RP BDY
REFER DRG NO C004
1:2.2
.4
EXISTING MOUND 1:2 1.2% 1.0%
RP BDY
0.5%
:2.5
RP BDY
1
03 16 17 18
01 02 15
EXCAVATE TO RL5.0 TO ENABLE
FREE DRAINING SURFACE
10.000
SECTION A SECTION C
SCALE 1 : 250 C002 SCALE 1 : 250 C002
LANDSCAPE 10.000
BUFFER ZONE LANDSCAPE
BUFFER ZONE
7.000
7.000
VEGETATION
3.000 VEGETATION
PROTECTION 3.000
CONSTRUCTION PROTECTION
ZONE CONSTRUCTION
ZONE ZONE
ZONE
DIRTY WATER DIVERSION BUND
EMT
RP BDY
RP BDY
REFER DRG NO C004
1:3.4
0.9% 0.9% 1:3.5 2.0% 1.0%
RP BDY
RP BDY
.2
1:2 22
05 06 07 21
04 19 20
EXCAVATE TO RL5.0 TO ENABLE
FREE DRAINING SURFACE
SECTION B SECTION D
SCALE 1 : 250 C002 SCALE 1 : 250 C002
10.000
LANDSCAPE
BUFFER ZONE
7.000
VEGETATION
3.000
PROTECTION
CONSTRUCTION
ZONE
ZONE
EMT
DIRTY WATER DIVERSION BUND
RP BDY
EXISTING MOUND EXISTING REFER DRG NO C004
1:2 HOLLOW
02 0.5% 05 0.5% 09 1.5%
16 1.5% 20 1.0% 24 1:4.4
RP BDY
EXISTING Ø1050 RCP STORMWATER
NOM IL 3.23
SECTION E
SCALE 1 : 250 C002
10.000 10.000
LANDSCAPE LANDSCAPE
BUFFER ZONE BUFFER ZONE
7.000
7.000
VEGETATION
3.000 3.000 VEGETATION
PROTECTION
CONSTRUCTION CONSTRUCTION PROTECTION
ZONE
ZONE ZONE ZONE
RP BDY
EMT
RP BDY
DIRTY WATER DIVERSION BUND
RP BDY
1:2 REFER DRG NO C004
FLAT 1:9 1:10
1.1%
RP BDY
1.0% 1.0% 25 1
:3
GATEWAY DRIVE 13 17 21
CULDESAC
EXISTING Ø1050 RCP STORMWATER
NOM IL 3.29
SECTION F
J:\2018\18556sd2_Subdivision_64_Gateway_Drive_Noosaville\4.CADD\#ACAD\18556_CIVIL_PRELIM.dwg
SCALE 1 : 250 C002
REFER DRAWING NO 18556-P001 FOR PROJECT NOTES
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
This drawing is subject to JF DR
copyright in accordance with the 64 GATEWAY DRIVE PTY LTD Designed Verified
64 GATEWAY DRIVE, NOOSAVILLE BULK EARTHWORKS 1 : 250 A1
agreement between Tod
Consulting pty ltd (tc) and tc's
client. This drawing shall only be
Sunshine Coast:
13/6-12 Bottlebrush Ave
JF DR SECTIONS Drawing Number
used for this specific project. martoo
consulting
P.O.Box 1684
Noosa Heads QLD 4567
Ph: 07 5455 2550
Approved
D REYNOLDS
RPEQ No
9072 RDP LOT 13 ON SP170295 18556-C003
This drawing shall not be used pty ltd
Noosa: 07 5449 9600 LOCAL AUTHORITY NOOSA COUNCIL
Gympie: Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
Signed MCU APPROVAL HORIZ DATUM LOCAL 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as town planners + 38 Nash Street PO Box 61, Noosaville, QLD 4566
A 26.04.19 OPW APPLICATION JF P.O. Box 391 ROL APPROVAL VERT DATUM AHD
'issued for construction' in the
revision description. Rev Date Revision Description Drawn
urban designers
+ surveyors
Gympie QLD 4570
Ph: 07 5482 7440
[email protected] www.todconsulting.com
ABN 39 128 805 336
26.04.19 OPW APPROVAL RL DATUM PSM 13296 MEASUREMENT BAR - INCREMENTS IN mm
3 of 5 A
Page 4
SEDIMENT FENCE IN ACCORDANCE PROVIDE ROCK LINED SUMP FOR PUMPING
WITH IECA STD DRGS SF-01 & SF-02 OUT TREATED WATER (1.0m DEEP)
SF SF SF SF SF SF LIMIT OF CLEARING
SF
3m
SF SF SF SF SF
W
SF SF SF SF SF SF SF
SF
SF SF SF SF SF SF SF SF SF SF -
C005
SF
DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD SF
DWD DWD DWD DWD TOP OF DWD BUND RL 4.30 MIN
DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD
0
5 DWD DWD W
5.0
5.2 EI
R
LE
VE
3m
LR
L4
RO .00 SF
C
RE K LI
FE NE
R D SF
DE WE
TA IR DW
IL D
EXIT INSTALL CONSTRUCTION ENTRY/EXIT IN
ACCORDANCE WITH IECA STD DRG EXIT-02 DW
D
DW
D
DW
D
4.75
0 5 0 3.75
4.5 4.2 4.0
JOINS BELOW
AREA UP TO RL 4.00 TO BE USED
AS TEMPORARY SEDIMENT BASIN
DURING EARTHWORKS PHASE
TOTAL VOLUME = 450m³
CWD CWD CWD CWD CWD CWD CWD CWD CWD
NOTES
1. FOR NOTES REFER TO DRAWING C001
2. ANY FILLING REQUIRED WITHIN LOTS ASSOCIATED WITH THE CONSTRUCTION AND
DECOMMISSIONING OF TEMPORARY SEDIMENT BASINS IS TO BE UNDERTAKEN WITH
LEVEL 1 GEOTECHNICAL SUPERVISION
3. CONTRACTOR TO PREPARE CPESC CERTIFIED EROSION AND SEDIMENT CONTROL
PLAN AND INSTALL AND MAINTAIN CONTROL THROUGHOUT THE COURSE OF WORKS
PHASE 1 WORK (BULK EARTHWORKS)
1. PRIOR TO IMPLEMENTING EROSION AND SEDIMENT CONTROLS. CLEAN SF
CATCHMENTS UPSTREAM MUST BE DIVERTED AROUND SUBJECT SITE AND
PROTECTED OF DOWNSTREAM CATCHMENTS MUST BE ESTABLISHED. CUT AND FILL
BULK EARTHWORKS IS COMMENCED IN THIS STAGE. TEMPORARY SEDIMENT BASINS
TO BE CONSTRUCTED AND MAINTAINED AS WORK PROGRESSES
3m
OPTIONAL EARTH EMBANKMENT CLEAN WATER CALCULATIONS RO SF
TO INCREASE FLOW CAPACITY C
1000mm (MIN) 600mm (MIN) Q2 FLOW = 0.014 m³/s ► COEFF OF RUNOFF 0.8 RE K L
INSTALL GEOFABRIC TO AND/OR ACT AS FREEBOARD FE INE
► INTENSITY (tc 5mins) 160 mm/hr R D SF
INVERT (PINNED) DE WE
► CATCHMENT AREA 0.040 Ha TA IR DW
LEGEND BATTER GRADE
IL D LIM
DIRECTION 2 IT
SITE RP BOUNDARY (MAX) SF OF
OF INFLOW 1 0.67 0.50 -1 DW
MANNING'S FORMULA Q=AxR x Sf xn D CL
ADJACENT RP BOUNDARIES EA
CHANNEL CHARACTERISTICS RI
EXISTING STORMWATER DW SF NG
MANNING'S COEFF 0.025 D
EXISTING SEWER BED SLOPE 1 in 62.5 (1.60%)
LEFT BANK SLOPE 1 in 2 DW TO SF
EXISTING WATER D P
JOINS ABOVE
250mm
BED WIDTH 0.000m OF
(MIN)
EXISTING CONTOUR (0.50m INTERNALS) RIGHT BANK SLOPE 1 in 2 3.75 DW
DW D B
0 5
PROPOSED CONTOUR MAJOR (1.0m INTERVALS) D UN SF
4.0 4.2
Q2 FLOW = 0.014 m³/s DEPTH OF Q2 FLOW 0.104 m D
PROPOSED CONTOUR MAJOR (0.25m INTERVALS) VELOCITY 0.654 m/s RL
DW 4.3
PROPOSED EARTHWORKS PLATFORM TYPICAL PROFILE OF CLEAN WATER DIVERSION DRAIN D*V (depth * velocity) 0.068 D 0M
IN SF
PROPOSED TOP OF BANK SCALE: 1 : 25 ( A = 0.022 m² | P = 0.465 m | R (A/P) = 0.047 m )
DW
D
PROPOSED TOE OF BANK SF
PROPOSED TEMPORARY VEGETATION INSTALL 1.5m WIDTH DW
PROTECTION FENCING GEOFABRIC TO INVERT DIRTY WATER CALCULATIONS D
(PINNED) 500mm (MIN) SF
EXTENT OF VEGETATION Q2 FLOW = 0.160 m³/s ► COEFF OF RUNOFF 0.6 DW
300mm
(MIN)
► INTENSITY (tc 5mins) 160 mm/hr D
► CATCHMENT AREA 0.600 Ha
LANDSCAPE BUFFER ZONE DIRECTION BATTER GRADE
2
OF INFLOW (MAX)
1
SF
DWD
MANNING'S FORMULA Q = A x R 0.67 x Sf 0.50 x n -1
J:\2018\18556sd2_Subdivision_64_Gateway_Drive_Noosaville\4.CADD\#ACAD\18556_CIVIL_PRELIM.dwg
ENVIRONMENTAL BUFFER ZONE
CHANNEL CHARACTERISTICS
MANNING'S COEFF 0.025
TEMPORARY SEDIMENT BASIN BED SLOPE 1 in 69 (1.45%)
SF
LEFT BANK SLOPE 1 in 100
AREA OF EARTHWORKS BED WIDTH 0.000m
RIGHT BANK SLOPE 1 in 2
SEDIMENT FENCE SF
SF Q2 FLOW = 0.160 m³/s DEPTH OF Q2 FLOW 0.076 m
REFER IECA STD DRGS SF-01 & SF-02
VELOCITY 0.543 m/s
DIRTY WATER DIVERSION BUND D*V (depth * velocity) 0.041
DWD
REFER IECA STD DRGS DB-01 AND C004 TYPICAL PROFILE OF DIRTY WATER DIVERSION BUND ( A = 0.295 m² | P = 7.770 m | R (A/P) = 0.038 m )
CLEAN WATER DIVERSION DRAIN
CWD REFER IECA STD DRGS DC-01 AND C004 SCALE: 1 : 25
REFER DRAWING NO 18556-P001 FOR PROJECT NOTES
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
This drawing is subject to JF DR
copyright in accordance with the 64 GATEWAY DRIVE PTY LTD Designed Verified
64 GATEWAY DRIVE, NOOSAVILLE BULK EARTHWORKS 1 : 250 A1
agreement between Tod
Consulting pty ltd (tc) and tc's
client. This drawing shall only be
Sunshine Coast:
13/6-12 Bottlebrush Ave
GA DR EROSION & SEDIMENT CONTROL Drawing Number
used for this specific project. martoo
consulting
P.O.Box 1684
Noosa Heads QLD 4567
Ph: 07 5455 2550
Approved
D REYNOLDS
RPEQ No
9072 RDP LOT 13 ON SP170295 PHASE 1 18556-C004
This drawing shall not be used pty ltd
Noosa: 07 5449 9600 LOCAL AUTHORITY NOOSA COUNCIL
Gympie: Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
Signed MCU APPROVAL HORIZ DATUM LOCAL 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as town planners + 38 Nash Street PO Box 61, Noosaville, QLD 4566
A 26.04.19 OPW APPLICATION JF P.O. Box 391 ROL APPROVAL VERT DATUM AHD
'issued for construction' in the
revision description. Rev Date Revision Description Drawn
urban designers
+ surveyors
Gympie QLD 4570
Ph: 07 5482 7440
[email protected] www.todconsulting.com
ABN 39 128 805 336
26.04.19 OPW APPROVAL RL DATUM PSM 13296 MEASUREMENT BAR - INCREMENTS IN mm
4 of 5 A
Page 5
SEDIMENT FENCE IN ACCORDANCE
WITH IECA STD DRGS SF-01 & SF-02
SF SF SF SF SF SF LIMIT OF CLEARING
SF
3m
SF SF SF SF SF
W
SF SF SF SF SF SF SF
SF
SF SF SF SF SF SF SF SF SF SF -
SF
DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD SF
DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD DWD
0
5 DWD DWD
5.0
5.2
3m
DIRTY WATER DIVERSION ROCK WEIR REMOVED AS
BUND REMOVED AS PART OF PART OF STAGE 3 ESC WORKS RO SF
C
STAGE 3 ESC WORKS RE K L
FE INE
R D SF
DE WE
TA IR DW
IL D
EXIT INSTALL CONSTRUCTION ENTRY/EXIT IN
ACCORDANCE WITH IECA STD DRG EXIT-02 DW
D
DW
D
DW
D
4.75
0 5 0 3.75
4.5 4.2 4.0
DISTURBED AREAS TO BE TOPSOILED AND TEMPORARY SEDIMENTARY
HYDROMULCHED ON COMPLETION OF BASIN AREA TO BE
EARTHWORKS OR COVERED WITH MULCH IF STABILISED FOLLOWING
JOINS BELOW
BUILDING ACTIVITY IMMINENT (< 3 MONTHS) COMPLETION EARTHWORKS
CLEAN WATER DIVERSION
DRAIN REMOVED AS PART OF
STAGE 3 ESC WORKS
CWD CWD CWD CWD CWD CWD CWD CWD CWD
NOTES SF
1. FOR NOTES REFER TO DRAWING C001
2. ANY FILLING REQUIRED WITHIN LOTS ASSOCIATED WITH THE CONSTRUCTION AND
DECOMMISSIONING OF TEMPORARY SEDIMENT BASINS IS TO BE UNDERTAKEN WITH
LEVEL 1 GEOTECHNICAL SUPERVISION
3m
3. CONTRACTOR TO PREPARE CPESC CERTIFIED EROSION AND SEDIMENT CONTROL
PLAN AND INSTALL AND MAINTAIN CONTROL THROUGHOUT THE COURSE OF WORKS RO SF
C
RE K L
WEIR CALCULATIONS PHASE 2 WORK (TEMP SEDIMENT BASIN RESTORATION FE INE
R D SF
1. ALL TEMP SEDIMENT BASINS TO BE FILLED UNDER LEVEL 1 SUPERVISION AND ALL DE WE
Q10 WEIR FLOW = 0.382 m³/s ► COEFF OF RUNOFF 0.7 TA IR DW
DISTURBED AREAS STABILISED, WHEN DIRECTED BY A SUPERVISING ENGINEER IL D LIM
► INTENSITY (tc 5mins) 225 mm/hr IT
► CATCHMENT AREA 0.873 Ha DW SF OF
PHASE 3 WORK (CIVIL COMPLETION)
D CL
1. UPON COMPLETION OF ALL CONSTRUCTION, BATTERS ARE TO BE TURFED LEAVING EA
FLOW AVERAGE FLOW IN THE SEDIMENT FENCES TO CONTROL SEDIMENT AND STORMWATER RUNOFF. RI
DISTANCE LEVEL DW SF NG
DEPTH DEPTH SECTION STORMWATER RUNOFF TO PIPED SYSTEM. ROOF WATER PIT AND GULLY ROAD PIT. D
(m) (m) (m) (m) (m³/s) SEDIMENT BARRIERS ADDED
0.0 4.300 0.000 - - 2. REMOVE TEMPORARY DIRTY WATER DIVERSION BUND AND CLEAN WATER DW
LEGEND D SF
JOINS ABOVE
1.0 4.000 0.079 0.040 0.013 DIVERSION DRAIN.
SITE RP BOUNDARY 3. REMOVE ROCK LINED WEIR FOLLOWING STABILISATION OF TEMPORARY BASIN. 3.75
11.0 4.000 0.079 0.079 0.356 DW
4. STABILISE AREA WHERE ROCK LINED WEIR WAS LOCATED. D SF
ADJACENT RP BOUNDARIES 12.0 4.300 0.000 0.040 0.013
EXISTING STORMWATER TOTAL WEIR FLOW 0.382 DW
WATER LEVEL AT WEIR RL 4.079 D SF
EXISTING SEWER .
EXISTING WATER DW
DIRTY WATER DIVERSION D
EXISTING CONTOUR (0.50m INTERNALS) SF
BUND REMOVED AS PART OF
DW
0 5
PROPOSED CONTOUR MAJOR (1.0m INTERVALS) STAGE 3 ESC WORKS
4.0 4.2
D
PROPOSED CONTOUR MAJOR (0.25m INTERVALS) 1 1 10m ROCK LINED WEIR 1 1 ADJACENT 0.8m HIGH BUND SF
DW
D
0.3
0.3
PROPOSED EARTHWORKS PLATFORM 1
PROPOSED TOP OF BANK WEIR LEVEL RL 4.0 WEIR LEVEL RL 4.0
AREA OF EARTHWORKS
SF
NO
DWD
M1
MIN
MIN
0.5
0.5
SEDIMENT FENCE :2 1
J:\2018\18556sd2_Subdivision_64_Gateway_Drive_Noosaville\4.CADD\#ACAD\18556_CIVIL_PRELIM.dwg
SF
REFER IECA STD DRGS SF-01 & SF-02
PLACE ROCK (CONSISTING OF 100-150mm ROCK SPALL) DIRTY WATER DIVERSION BUND REFER ELEVATION
DWD
DIRTY WATER DIVERSION BUND TO FORM A DENSE, WELL-GRADED MASS WITH MINIMUM REFER DETAIL FOR ROCK DETAILS NATURAL
REFER IECA STD DRGS DB-01 AND C004 VOIDS, TO A THICKNESS OF 200mm. SURFACE
SF
CLEAN WATER DIVERSION DRAIN THE FINISHED SURFACE SHALL BE FREE OF POCKETS OF
CWD REFER IECA STD DRGS DC-01 AND C004 SMALL ROCK OR CLUSTERS OF LARGE ROCKS, W
PRODUCING A RELATIVELY SMOOTH, UNIFORM SURFACE. - SF
ROCK LINED WEIR ELEVATION SECTION W
NOT TO SCALE NOT TO SCALE -
REFER DRAWING NO 18556-P001 FOR PROJECT NOTES
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
This drawing is subject to JF DR
copyright in accordance with the 64 GATEWAY DRIVE PTY LTD Designed Verified
64 GATEWAY DRIVE, NOOSAVILLE BULK EARTHWORKS 1 : 250 A1
agreement between Tod
Consulting pty ltd (tc) and tc's
client. This drawing shall only be
Sunshine Coast:
13/6-12 Bottlebrush Ave
GA DR EROSION & SEDIMENT CONTROL Drawing Number
used for this specific project. martoo
consulting
P.O.Box 1684
Noosa Heads QLD 4567
Ph: 07 5455 2550
Approved
D REYNOLDS
RPEQ No
9072 RDP LOT 13 ON SP170295 PHASE 2 & 3 18556-C005
This drawing shall not be used pty ltd
Noosa: 07 5449 9600 LOCAL AUTHORITY NOOSA COUNCIL
Gympie: Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
Signed MCU APPROVAL HORIZ DATUM LOCAL 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as town planners + 38 Nash Street PO Box 61, Noosaville, QLD 4566
A 26.04.19 OPW APPLICATION JF P.O. Box 391 ROL APPROVAL VERT DATUM AHD
'issued for construction' in the
revision description. Rev Date Revision Description Drawn
urban designers
+ surveyors
Gympie QLD 4570
Ph: 07 5482 7440
[email protected] www.todconsulting.com
ABN 39 128 805 336
26.04.19 OPW APPROVAL RL DATUM PSM 13296 MEASUREMENT BAR - INCREMENTS IN mm
5 of 5 A
Used in these records
18556-C001_C005_[A] - full set.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.