Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Reference Documents - MCU24 0141 & OPW24 0184 [As Published]

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (16.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 14, section 1. The text section number identifies this passage in the reader.

                                 GENERAL NOTES:                                                                                                                                                                                           LINEMARKING & SINGAGE NOTES:                                                                                    STORMWATER NOTES:
                                 1.          DRAWINGS TO BE READ IN CONJUNCTION WITH LOCAL AUTHORITY SPECIFICATIONS.                                                                                                                      1.  ALL SIGNAGE AND LINE MARKING TO BE IN ACCORDANCE WITH MANUAL FOR UNIFORM TRAFFIC                            1.    ALL STORMWATER DRAINAGE TO BE CONSTRUCTED IN ACCORDANCE WITH LOCAL COUNCIL, IPWEA,
                                 2.          CHECK ALL DIMENSIONS BEFORE COMMENCEMENT OF WORK, DIMENSIONS IN METRES UNLESS OTHERWISE                                                                                                          CONTROL DEVICES (MUTCD CURRENT EDITION) AND IN ACCORDANCE WITH AS1742.2-2009.                                     QDUM AND AS3500.
                                             STATED. DO NOT SCALE FROM DRAWINGS.                                                                                                                                                          2. ALL CARPARK LINEMARKING TO BE IN ACCORDANCE WITH THE DIMENSIONAL REQUIREMENTS AS/NZS                         2.    ALL PVC-U STORMWATER PIPES TO BE CLASS SN8 U.N.O.
                                 3.          CHECK SITE BOUNDARY DIMENSIONS FROM THE TITLE PLANS.                                                                                                                                             2890.1 2004.                                                                                                3.    ALL PP (STORMPRO) PIPES TO BE CLASS SN8 U.N.O.
                                 4.          EXISTING SERVICES AND STRUCTURES HAVE BEEN PLOTTED FROM SUPPLIED DATA. IT IS THE CONTRACTORS                                                                                                 3. ALL CARPARK LINE MARKING SHALL BE TYPE 1 MARKING PAINT 80-100mm WIDE TO MRS 11.45                            4.    ALL STORMWATER PIPES TO BE RUBBER RING JOINTED.
                                             RESPONSIBILITY TO CONFIRM THE LOCATION AND LEVEL OF ALL EXISTING SERVICES PRIOR TO COMMENCEMENT                                                                                                  SPECIFICATIONS.                                                                                             5.    FINAL LID AND GRATE LEVELS OF MANHOLES AND PITS TO BE ADJUSTED ON SITE TO
                                             OF ANY WORK.                                                                                                                                                                                 4. ALL LINEMARKING, SIGNAGE AND R.R.P.M's SHALL BE IN ACCORDANCE WITH THE "MANUAL OF UNIFORM                          SUIT ALL EARTHWORKS AND FINISHED SURFACE LEVELS.
                                 5.          AT COMPLETION OF SERVICES INSTALLATION, ALL AREAS SHALL BE REINSTATED TO DESIGN DRAWINGS OR                                                                                                      TRAFFIC CONTROL DEVICES" (MUTCD).                                                                           6.    PIPE BEDDING AND BACKFILL SHALL BE IN ACCORDANCE WITH LOCAL COUNCIL, IPWEA, QDUM AND
                                             EXISTING SURFACE.                                                                                                                                                                            5. ALL LINEMARKING ON AC PAVEMENTS SHALL BE WHITE, TYPE 1 ROAD MARKING PAINT 80-100mm WIDE,                           AS3500 FOR PVC-U PIPES AND SPECIFICATION FOR R.C. PIPES.
                                 6.          THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO INFRASTRUCTURE. REPAIRS OR                                                                                                       REFER MRS 11.45 SPECIFICATIONS (U.N.O.)                                                                     7.    MAINTENANCE HOLES TO BE CONSTRUCTED IN ACCORDANCE WITH LOCAL AUTHORITY.
                                             REINSTATEMENT TO BE CARRIED OUT TO THE SATISFACTION OF SUPERINTENDENT.                                                                                                                       6. ALL LINEMARKING ON CONCRETE PAVEMENTS SHALL BE GOLDEN YELLOW COLOUR NO. Y14 AS 2700 AND                      8.    TYPE 2 BEDDING TO BE USED TO ALL STORMWATER PIPES UNLESS NOTED OTHERWISE.
                                 7.          UNLESS WRITTEN APPROVAL FROM THE SUPERINTENDENT OR APPROVING AUTHORITY MATERIALS SPECIFIED                                                                                                       80-100mm WIDE (U.N.O.)                                                                                      9.    EXCAVATION, BEDDING AND BACKFILL OF STORMWATER PIPES TO BE IN ACCORDANCE
                                             ARE TO BE USED.                                                                                                                                                                                  DISABILITY CARPARK LINEMARKING TO AS2890.6.                                                                       WITH IPWEA DRG. No. DS-030.
                                 8.          THE CONTRACTOR IS TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE HEALTH AND SAFETY                                                                                                  7. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1743 UNLESS NOTED OTHERWISE                                       10.   ALL FIELD INLETS TO BE TYPE 2 IN ACCORDANCE WITH IPWEA DRG. No. DS-050
                                             REQUIREMENTS.                                                                                                                                                                                8. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO EDGE SIGN:                                              UNLESS NOTED OTHERWISE.
                                 9.          THE CONTRACTOR IS TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES NECESSARY TO ENSURE THE                                                                                                   -  NO KERB = 600mm BEHIND GUIDE POSTS                                                                         11.   REFER TO MANUFACTURER'S SPECIFICATION FOR INSTALLATION OF GROSS POLLUTANT TRAPS. (IF
                                             INTEGRITY OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION                                                                                                 -  BARRIER KERB = 300mm FROM FACE OF KERB                                                                           APPROVED FOR THE SITE)
                                             EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.                                                                                                                                                     -  MOUNTABLE KERB = 500mm FROM FACE OF KERB                                                                   12.   UNLESS NOTED OTHERWISE, A MINIMUM COVER OF 600mm SHALL BE MAINTAINED OVER ALL
                                                                                                                                                                                                                                          10. A FLEXIBLE STRIKER BAR SHALL BE PROVIDED IN CONJUNCTION WITH SIGNAGE WHERE CLEARANCE                              STORMWATER PIPES UNDER ROADWAYS AND A MINIMUM COVER OF 450mm SHALL BE MAINTAINED FOR
                                 SAFETY/SAFETY IN DESIGN                                                                                                                                                                                      LESS THAN 2.3m OCCURS.                                                                                            ALL INTERALLOTMENT DRAINAGE.
                                 1.          THERE ARE INHERENT RISKS WITH CONSTRUCTING, MAINTAINING, OPERATING, DEMOLISHING AND DISPOSING.                                                                                                                                                                                                               13.   CONTRACTOR TO MAINTAIN A 1.0m CLEARANCE WITH INTERALLOTMENT STORMWATER PIPES TO SEWER
                                             WE NOTE THIS DESIGN IS TYPICAL OF SIMILAR DESIGNS. AS FAR AS IS REASONABLY PRACTICABLE, RISKS HAVE                                                                                                                                                                                                                 MAINS (O.D. TO O.D.)
                                             BEEN ELIMINATED OR MINIMISED THROUGH THE DESIGN PROCESS. HAZARD CONTROLS MUST STILL BE                                                                                                                                                                                                                       17.   DRAINAGE CONNECTIONS TO KERB AND CHANNEL REFER TO LOCAL AUTHORITY STD DRG BSD-8114.
                                             IMPLEMENTED BY THE CONTRACTOR, OWNER OR OPERATOR TO ENSURE THE SAFETY OF WORKERS. WE DID NOT                                                                                                 STORMWATER NOTES:                                                                                               13.   THE CONTRACTOR IS TO ENSURE PROPER COMPACTION TO BACKFILLING OF TRENCHES AND
                                             IDENTIFY ANY UNIQUE RISKS ASSOCIATED WITH THE DESIGN.                                                                                                                                        1.       ALL STORMWATER DRAINAGE TO BE CONSTRUCTED IN ACCORDANCE WITH LOCAL COUNCIL, IPWEA,                           STRUCTURES.
                                 2.          THE DESIGN AND CONSTRUCTION OF THE WORKS SHALL COMPLY WITH ALL RELEVANT LEGISLATION                                                                                                                   QDUM AND AS3500.                                                                                       14.   UPON COMPLETION, ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND
                                                                                                                                                                                                                                          2.       ALL PVC-U STORMWATER PIPES TO BE CLASS SN8 U.N.O.                                                            OTHER BLOCKAGES.
                                                                                                                                                                                                                                          3.       ALL PP (STORMPRO) PIPES TO BE CLASS SN8 U.N.O.                                                         15.   THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED STORMWATER
                                                                                                                                                                                                                                          4.       ALL STORMWATER PIPES TO BE RUBBER RING JOINTED.                                                              DRAINAGE ASSETS FOR APPROVAL BY THE ENGINEER AND/OR LOCAL AUTHORITY.
                                 EARTHWORKS NOTES:
                                                                                                                                                                                                                                          5.       FINAL LID AND GRATE LEVELS OF MANHOLES AND PITS TO BE ADJUSTED ON SITE TO                              16.   ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY
                                 1.          ALL EXCAVATION AND FILLING SHALL BE CONSTRUCTED IN ACCORDANCE WITH AS
                                                                                                                                                                                                                                                   SUIT ALL EARTHWORKS AND FINISHED SURFACE LEVELS.                                                             THE CONTRACTOR. PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE
                                             3798 AND CURRENT LOCAL AUTHORITY.
                                                                                                                                                                                                                                          6.       PIPE BEDDING AND BACKFILL SHALL BE IN ACCORDANCE WITH LOCAL COUNCIL, IPWEA, QDUM AND                         CONTRACTOR, UNLESS IT CAN BE DEMONSTRATED THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING
                                 2.          ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY
                                                                                                                                                                                                                                                   AS3500 FOR PVC-U PIPES AND SPECIFICATION FOR R.C. PIPES.                                                     AND THE RESPONSIBILITY OF OTHER PARTIES.
                                             OPERATIONAL BEFORE
                                                                                                                                                                                                                                          7.       MAINTENANCE HOLES TO BE CONSTRUCTED IN ACCORDANCE WITH (IPWEA) DRG. DS-010, 015, 018, 019,
                                             COMMENCING UP-SLOPE EARTHWORKS.
                                                                                                                                                                                                                                                   020 AND 021.
                                 3.          PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL REMOVE ALL STRUCTURES,
                                                                                                                                                                                                                                          8.       TYPE 2 BEDDING TO BE USED TO ALL STORMWATER PIPES UNLESS NOTED OTHERWISE.
                                             DEBRIS AND FENCES FROM THE SITE.
                                                                                                                                                                                                                                          9.       EXCAVATION, BEDDING AND BACKFILL OF STORMWATER PIPES TO BE IN ACCORDANCE
                                 4.          FILL SHALL BE SOUND MATERIAL APPROVED BY THE ENGINEER, FREE OF ANY
                                                                                                                                                                                                                                                   WITH IPWEA DRG. No. DS-030.
                                             ORGANIC MATTER OR ANY MATERIAL THAT WILL NOT FORM A STABLE FILL.
                                                                                                                                                                                                                                          10.      ALL FIELD INLETS TO BE TYPE 2 IN ACCORDANCE WITH IPWEA DRG. No. DS-050
                                 5.          FILL TO BE PLACED IN MAXIMUM 150mm LIFTS, UNLESS APPROVED OTHERWISE
                                                                                                                                                                                                                                                   UNLESS NOTED OTHERWISE.
                                             AND COMPACTED TO SPECIFICATION.
                                                                                                                                                                                                                                          11.      REFER TO MANUFACTURER'S SPECIFICATION FOR INSTALLATION OF GROSS POLLUTANT TRAPS. (IF
                                 6.          COMPACTION TEST RESULTS TO BE SUBMITTED TO ENGINEER FOR APPROVAL
                                                                                                                                                                                                                                                   APPROVED FOR THE SITE)
                                             PRIOR TO PLACEMENT OF EACH LAYER.
                                                                                                                                                                                                                                          12.      UNLESS NOTED OTHERWISE, A MINIMUM COVER OF 600mm SHALL BE MAINTAINED OVER ALL
                                 7.          LEVEL 1 CERTIFICATION IS REQUIRED IN ACCORDANCE WITH AS 3798.
                                                                                                                                                                                                                                                   STORMWATER PIPES UNDER ROADWAYS AND A MINIMUM COVER OF 450mm SHALL BE MAINTAINED FOR
                                 8.          ALL STRUCTURES ARE TO BE CONSIDERED WITH THE STRUCTURAL LOADING
                                                                                                                                                                                                                                                   ALL INTERALLOTMENT DRAINAGE.
                                             FROM EARTHWORKS.
                                                                                                                                                                                                                                          13.      CONTRACTOR TO MAINTAIN A 1.0m CLEARANCE WITH INTERALLOTMENT STORMWATER PIPES TO SEWER
                                 9.          ANY AREA DISTURBED OUTSIDE OF THE WORKS AREA SHOWN SHALL BE
                                                                                                                                                                                                                                                   MAINS (O.D. TO O.D.)
                                             REHABILITATED TO PRE-CONSTRUCTION CONDITIONS, AT THE CONTRACTORS
                                                                                                                                                                                                                                          17.      DRAINAGE CONNECTIONS TO KERB AND CHANNEL REFER TO IPWEA STD DRG RS-081.
                                             EXPENSE.
                                                                                                                                                                                                                                          13.      THE CONTRACTOR IS TO ENSURE PROPER COMPACTION TO BACKFILLING OF TRENCHES AND
                                 10.         THE FINISHED SURFACE SHALL BE FREE DRAINING AT MINIMUM 1:100 UNLESS
                                                                                                                                                                                                                                                   STRUCTURES.
                                             OTHERWISE STATED ON PLANS.
                                                                                                                                                                                                                                          14.      UPON COMPLETION, ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND
                                 11.         ROAD PAVEMENTS TO BE COMPACTED TO ACHIEVE MINIMUM DRY DENSITY RATIO
                                                                                                                                                                                                                                                   OTHER BLOCKAGES.
                                             (M.D.D.R) OF 100% STD.
                                                                                                                                                                                                                                          15.      THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED STORMWATER
                                 12.         MINIMUM RELATIVE COMPACTION:
                                                                                                                                                                                                                                                   DRAINAGE ASSETS FOR APPROVAL BY THE ENGINEER AND/OR LOCAL AUTHORITY.
                                             ·     BUILDING PLATFORM (98% STD AS1289.S.1.1
                                                                                                                                                                                                                                          16.      ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY
                                             ·     ROAD SUBGRADE (100% STD AS1289.S.1.1)
                                                                                                                                                                                                                                                   THE CONTRACTOR. PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE
                                 13.         ALL LEVELS TO BE CROSS REFERENCED WITH ARCHITECTURAL DRAWINGS.
                                                                                                                                                                                                                                                   CONTRACTOR, UNLESS IT CAN BE DEMONSTRATED THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING
                                                                                                                                                                                                                                                   AND THE RESPONSIBILITY OF OTHER PARTIES.




                          SURVEY DATA
                          SURVEYED BY MINSTAFF SURVEY DATED 26/04/2024.
                          PLAN REFERENCE M5442 3000 001.
                          RP DESCRIPTION
                          LOT 4259 MCH4540
                          SITE AREA = 3040m²




                                                                                                                  APPROVED RPEQ                                                                                                                       CLIENT                           PROJECT                              DRAWING
                                                                                                                                  DRAWN JW                                                                                                                                                                                                                                                                          STATUS FOR APPROVAL
                                                                                                                  CHARLES COOK
                                                                                                                                                                                                                                                            ABODA DESIGN GROUP              SMALL INDUSTRIAL TENANCIES                    GENERAL NOTES
                                                                                                                  RPEQ NO: 8480   DESIGN JW
                                                                                                                  APPROVED DATE                                                                                                                                                                                                                                                                                      PROJECT NO.     DRAWING NO.   REV NO.
                                                                                                                                  CHECK   CC                                                                                                                                                      4 LEO ALLEY RD,
                                                                                                                  30.10.24
 A ISSUED FOR APPROVAL                                                                        30.10.24    CC
                                                                                                                 SIGNED                                                                                                                                                                          NOOSAVILLE, QLD                                                                                                        240127       OPW-C-00010      A
 P1 ISSUED FOR DISCUSSION                                                                     02.10.24    CC                                   COPYRIGHT © All rights reserved.
                                                                                                                                               This work is copyright and cannot be reproduced
                                                                                                                                                                                                 CIVIL | PROJECT MANAGEMENT | TECHNICAL SERVICES
                                                                                                                                                                                                 www.infinityce.com.au | ABN 72 677 371 532
REV                               DESCRIPTION                                                   DATE     APPR.                                 or copied in any form without the prior consent
                                                                                                                                                                                                                                                                                                                                                                                       SHEET SIZE   A1
Last saved by: JESSWARD(2024-10-30) Last Plotted: 2024-10-30
Filename: C:\ICE\ICE\PROJECTS - DOCS\2024\240127_4_LEO_ALLEY_DR\04 DESIGN\CAD\240127-OPW-C-00010.DWG
Log in to download the original file

Reference Documents - MCU24 0141 & OPW24 0184 [As Published].pdf · 16.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.