Reference Documents - MCU24 0141 & OPW24 0184 [As Published]

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (16.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

         GENERAL:
         1.          TO BE READ IN CONJUNCTION WITH 'SEDIMENT CONTROL DEVICES', REFER STD DRG IPWEA DS-040 &
                     DS-041.
         2.          TEMPORARY DRAINAGE CONTROL FLOW SHOULD BE DIVERTED AROUND THE WORK SITE WHERE
                     POSSIBLE.
         3.          ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE
                     COMMENCING UP-SLOPE EARTHWORKS.                                                                                                                                                                                                                                                                                                                                                                                                                       2m (MIN)
                                                                                                                                                                                                                                                                                                                                                                                                         FLOW CONTROL BERM INCORPORATED INTO THE
         4.          CONTROL MEASURES TO BE INSPECTED AT LEAST WEEKLY AND AFTER SIGNIFICANT RUNOFF                                                                                                                                                                                                                                                          MINIM
                                                                                                                                                                                                                                                                                                                                                                 UM LE                                   ROCK PAD IF THE PAD RECEIVES RUNOFF FROM
                                                                                                                                                                                                                                                                                                                                                                       NGTH
                     PRODUCING STORMS.                                                                                                                                                                                                                                                                                                                                        10m (M                     THE BUILDING SITE (LOCATION MAY VARY)
                                                                                                                                                                                                                                                                                                                                                                                        IN)
         5.          IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER                                                                                                                                                                                                                   40-75mm CRUSHED ROCK                      300mm (MIN)
                     MULCHED, COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED                                                                                                                                                                                                                                                                                                                                       BUILDING                                   LAND




                                                                                                                                                                                                                                                                                                                                                                                                                                                          10m (MIN)
                     TO BE DELAYED FOR MORE THAN I4 DAYS.                                                                                                                                                                                                                                                                                                                                                                                        SITE                                     SLOPE
                                                                                                                                                                                                                                                                                                                                                  150-200mm                                 N
         6.          CONTROL MEASURES MAY BE REMOVED WHEN ON-SITE EROSION IS CONTROLLED AND 70%                                                                                                                                                                                                                                                                                        MI                                            KERB
                                                                                                                                                                                                                                                                                                                                                                                   m
                     PERMANENT SOIL COVERAGE IS OBTAINED OVER ALL UPSTREAM DISTURBED LAND.                                                                                                                                                                                                                                                                                     2.0
                                                                                                                                                                                                                                                                                                                                                                                                       Y
         7.          STRAW BALE SEDIMENT TRAPS ARE TO BE SECONDARY OPTION WHICH GENERALLY SHOULD NOT BE                                                                                                                                                                                                                         UP-SLOPE RUNOFF                                                      BD FOOTPATH
                                                                                                                                                                                                                                                                                                                                 DIRECTED TO AN                                                 RP
                     USED IF OTHER OPTIONS ARE AVAILABLE.                                                                                                                                                                                                                                                                                                                                                             ROADWAY                  FOOTPATH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         MAKE SAFE FOR
                                                                                                                                                                                                                                                                                                                                  APPROPRIATE                                                                                                                                            PEDESTRIAN TRAFFIC
         8.          ALL CAPTURED RUNOFF MUST BE TREATED TO <75NTU PRIOR TO DISCHARGE.
                                                                                                                                                                                                                                                                                                                                 SEDIMENT TRAP                         MAK
         9.          SITE TO BE PROGRESSIVELY STABILISED, AIMING FOR 60% STABILISATION WITHIN 20 DAYS FROM START                                                                                                                                                                                                                                                    PEDE E SAFE TO
                                                                                                                                                                                                                                                                                                                            GEOTEXTILE FILTER CLOTH (MANDATORY          STRIA
                     OF WORKS AND 70% OR GREATER WITHIN 2 MONTHS.                                                                                                                                                                                                                                                           WHEN WORKING ON CLAYEY SOILS)                     N TRA                                                                                            ROADWAY
                                                                                                                                                                                                                                                                                                                                                                                    FFIC
         10.         ALL INLET PITS TO BE PROTECTED IMMEDIATELY.
         11.         EROSION AND SEDIMENT CONTROL MEASURES TO BE PROGRESSIVELY REMOVED AS SITE                                                                                                                                                                                                                                                   (a) ROCK ENTRY/EXIT PAD FOR BUILDING SITES
                     STABILISATION IS ACHIEVED.                                                                                                                                                                                                                                                                                                                                                                                                    (b) ROCK PAD SLOPING AWAY FROM ROAD

                     SEDIMENT CONTROL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           2m (MIN)
         1.          ALL SEDIMENT & EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL
                     EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS. THE BASIC
                     PRINCIPLES ARE TO:                                                                                                                                                                                                                                                                                                                                                                                                        BUILDING
                       -  MINIMISE THE AREA OF DISTURBANCE;                                                                                                                                                                                                                               CONSTRUCTION NOTES:                                                                                                                                    SITE
                       -  CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;                                                                                                                                                                                               MATERIALS                                                                                                                                                                                       LAND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          SLOPE




                                                                                                                                                                                                                                                                                                                                                                                                                                                          10m (MIN)
                       -  MINIMISE EROSION;                                                                                                                                                                                                                                               ROCK: WELL GRADED, HARD, ANGULAR, EROSION RESISTANT ROCK, NOMINAL DIAMETER OF 40 TO 75mm.
                       -  MINIMISE SEDIMENTATION;                                                                                                                                                                                                                                         FOOTPATH STABILISING AGGREGATE: 25 TO 50mm GRAVEL OR AGGREGATE (IF REQUIRED).
                       -  PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE                                                                                                                                                                                                              GEOTEXTILE FABRIC: HEAVY-DUTY, NEEDLE-PUNCHED, NON-WOVEN FILTER CLOTH (‘BIDIM’ A24 OR                                                                                                       SEDIMENT FENCE
         2.          SEDIMENT & EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE                                                                                                                                                                                         EQUIVALENT).
                     CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED                                                                                                                                                                                         INSTALLATION                                                                                                                                        FOOTPATH                                   MAKE SAFE FOR
                     NECESSARY THROUGHOUT CONSTRUCTION.                                                                                                                                                                                                                                   1. INSPECT ALL SITE ENTRY AND EXIT POINTS PRIOR TO FORECAST RAIN, DAILY DURING EXTENDED                                                                                                        PEDESTRIAN TRAFFIC
         3.          THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL                                                                                                                                                                               PERIODS OF RAINFALL, AFTER RUNOFF-PRODUCING RAINFALL, OR OTHERWISE AT FORTNIGHTLY
                     ORDER AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF                                                                                                                                                                                      INTERVALS.                                                                                                                                                                           ROADWAY
                     MAINTENANCE OF WORKS.                                                                                                                                                                                                                                                2. IF SAND, SOIL, SEDIMENT OR MUD IS TRACKED OR WASHED ONTO THE ADJACENT SEALED ROADWAY,
         4.          CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE                                                                                                                                                                                           THEN SUCH MUST BE PHYSICALLY REMOVED, FIRST USING A SQUARE-EDGED SHOVEL, AND THEN A
                     SUPERINTENDENT. SHALL BE COMPLETED AND EFFECTIVE PRIOR TO:                                                                                                                                                                                                           STIFF-BRISTLED BROOM, AND THEN BY A MECHANICAL VACUUM UNIT, IF AVAILABLE.
                                                                                                                                                                                                                                                                                                                                                                                                                                               (c) ROCK PAD SLOPING TOWARD THE ROAD
                     a.   STRIPPING OF TOPSOIL AND GRASS.                                                                                                                                                                                                                                 3. IF NECESSARY FOR SAFETY REASONS, THE ROADWAY SHALL ONLY BE WASHED CLEAN AFTER ALL
                     b.   BULK EARTHWORKS TO THE SITE.                                                                                                                                                                                                                                    REASONABLE EFFORTS HAVE BEEN TAKEN TO SHOVEL AND SWEEP THE MATERIAL FROM THE ROADWAY.
                     c.   SERVICES INSTALLATION.                                                                                                                                                                                                                                          4. WHEN THE VOIDS BETWEEN THE ROCK BECOMES FILLED WITH MATERIAL AND THE EFFECTIVENESS OF
                     d.   PAVEMENT CONSTRUCTION.                                                                                                                                                                                                                                          THE ROCK PAD IS REDUCED TO A POINT WHERE SEDIMENT IS BEING TRACKED OFF THE SITE, A NEW 100mm
                                                                                                                                                                                                                                                                                          LAYER OF ROCK MUST BE ADDED AND/OR THE ROCK PAD MUST BE EXTENDED.
         5.          ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED IN
                                                                                                                                                                                                                                                                                          5. ENSURE ANY ASSOCIATED DRAINAGE CONTROL MEASURES (e.g. FLOW CONTROL BERM) ARE
                                                                                                                                                                                                                                                                                                                                                                                                                                     ROCK PADS FOR BUILDING SITES
                     WRITING FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS.                                                                                                                                                                                                                                                                                                                                                           N.T.S
         6.          BOTH TEMPORARY AND PERMANENT SEDIMENT MANAGEMENT/EROSION CONTROL DEVICES SHALL BE                                                                                                                                                                                    MAINTAINED IN ACCORDANCE WITH THEIR DESIRED OPERATIONAL CONDITION.
                     MAINTAINED AT A SUITABLE LEVEL/CONDITION THROUGHOUT CONSTRUCTION TO THE SATISFACTION                                                                                                                                                                                 6. DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL NOT CREATE AN EROSION OR POLLUTION
                     OF THE SUPERINTENDENT. SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED                                                                                                                                                                                HAZARD.
                     BY 30%.
         7.          THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION
                     WITH THE APPROVED DRAWINGS.
         8.          PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE
                     SUPERINTENDENT FOR THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE
                     TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
         9.          IF EROSION AND SEDIMENT CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN
                     SERVICE, CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE
                     AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH
                     AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND RELEVANT.
         10.         SEDIMENT TRAP TO BE FLOCCULATED AND DE-SILTED AS NECESSARY.
         11.         WATER QUALITY TESTING / MONITORING TO BE UNDERTAKEN BY CONTRACTOR.                                                                                                                                                                                                                                                                                                                                    'RETURNS' PLACED AT 20m SPACING (MAX.) IF
                                                                                                                                                                                                                                                                                                                                                   3m (MAX.) WITH WIRE BACKING                                             FENCE IS LOCATED ALONG THE CONTOUR.
         SEDIMENT FENCE:                                                                                                                                                                                                                                                                                                                           OTHERWISE 2m (MAX.)                                                     OTHERWISE 5 TO 10m DEPENDING ON SLOPE
         1.          NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          1.5m (MIN)
         2.          NORMALLY LOCATED ALONG THE CONTOUR WITH A MAXIMUM CATCHMENT AREA 0.6Ha PER 100m                                                                                                                                                                                                                                    DIRECTION OF FLOW
                     LENGTH OF FENCE
         3.          WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS MAY BE USED ON SMALL WORK SITES, I.E.
                     OPERATIONAL PERIOD LESS THAN 6 MONTHS OR ON SITES WHERE SIGNIFICANT SEDIMENT RUNOFF IS
                     NOT EXPECTED.
         4.          WHERE FENCES NEED TO BE LOCATED ACROSS THE CONTOUR THE LAYOUT SHALL CONFORM TO
                     'TYPICAL LAYOUT' ACROSS GRADE.
         5.          FENCES ARE REQUIRED 2m MIN. FROM TOE OF CUT OR FILL BATTERS, WHERE NOT PRACTICAL ONE
                     FENCE CAN BE AT THE TOE WITH A SECOND FENCE 1m MIN AWAY. FENCE SHOULD NOT BE LOCATED
                     PARALLEL WITH TOE IF CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE.
         TEMPORARY CONSTRUCTION ENTRY / EXIT:                                                                                                                                                                                                                                                                                                                                                                                                                             ALL SUPPORT POSTS PLACED
         1.           ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY FROM ENTRY/EXIT.                                                                                                                                                                                                                                                                                                                                                                                     DOWN-SLOPE OF FABRIC
         2.           WHEEL-WASH OR SPRAY UNIT MAY BE REQUIRED DURING WET WEATHER.
         STANDARD SPECIFICATIONS:                                                                                                                                                                                                                                                                                         FABRIC BURIED 200mm
         DRAWING TO BE READ IN CONJUNCTION WITH INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA)                                                                                                                                                                          OPTIONAL GEOTEXTILE SPLASH PAD PLACED
         AUSTRALASIA BEST PRACTICES STANDARD DRAWINGS & SPECIFICATIONS. IECA STANDARD DRAWINGS                                                                                                                                                                            BELOW DAM TO REDUCE EROSION AT THE BASE                                                                                     SEDIMENT FENCE FABRIC, NOT
         GENERALLY AS LISTED BELOW BUT NOT LIMITED TO:                                                                                                                                                                                                              1     OF THE CHECK DAM (GENERALLY NOT REQUIRED)                                                                                   FILTER CLOTH OR SHADE CLOTH
             EXIT-01 - CONSTRUCTION EXIT - ROCK PAD
             EXIT-02 - CONSTRUCTION EXIT - ROCK PAD
             EXIT-03 - ROCK PADS FOR BUILDING SITES
             CD-01 - CATCH DRAINS
             CD-02 - CATCH DRAINS - EARTH LINED                                                                                                                                                                                                                     1                                                                                                    INSTALLATION OF SEDIMENT FENCE
             RCD-01 - CHECK DAMS                                                                                                                                                                                                                                                                                                                                                                                   N.T.S
             FF-01 - FILTER FENCE
             SF-01 - SEDIMENT FENCE                                                                                                                                                                                                                       150mm (MIN)
             SF-02 - SEDIMENT FENCE                                                                                                                                                                                                              A                  A                                                                                                    SEDIMENT FENCE CONSTRUCTION NOTES
                                                                                                                                                                                                                                                                              OUTER WING POINTS A TO BE AT
                                                                                                                                                                                                                                                        B




             ESC-02 - GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP                                                                                                                                                                                                                                                                                                      1.   SEDIMENT FENCE TO BE INSTALLED ALONG A LINE OF CONSTANT GROUND
                                                                                                                                                                                                                                                                              LEAST 150mm ABOVE CREST B
             ESC-03 - KERB INLET SEDIMENT TRAPS                                                                                                                                                                                                                                                                                                                               ELEVATION WHEREVER PRACTICAL.
             R-01 - RENEGOTIATION - GENERAL                                                                                                                                                                                                                                                                                                                              2.   BOTH ENDS OF THE SEDIMENT FENCE TO EXTEND UP THE SLOPE AT LEAST 1m.
                                                                                                                                                                                                                                                      SECTION 1-1                                                                                                        3.   SUPPORT POST TO BE SPACED MAXIMUM 2m UNLESS THE FENCE IS SUPPORTED
                                                                                                                                                                                                                                         FIGURE 1 - LAYOUT PROFILE OF CHECK DAMS                                                                                              BY ATOP WIRE OR WORE MESH BACKING, IN WHICH CASE 3m MAXIMUM SPACING.
                     THE EROSION & SEDIMENT CONTROL PLAN IS A CONCEPT PLAN DEMONSTRATING                                                                                                                                                            (ROCK CHECK DAMS SHOWN)
                     AN APPROACH TO EROSION & SEDIMENTATION CONTROL FOR THE SITE. IT IS THE                                                                                                                                                                                                                                                                              4.   FENCE 'RETURN' SHALL BE INSTALLED AT MAXIMUM 20m SPACING IF FENCE IS
                     CONTRACTORS RESPONSIBILITY TO PROVIDE AN EROSION & SEDIMENT CONTROL                                                                                                                                                                                                                                                                                      INSTALLED ALONG THE CONTOURS, OTHERWISE 5 TO 10m MAXIMUM SPACING.
                     DESIGN AND A COMPLETED DESIGN CERTIFICATE PRIOR TO COMMENCEMENT OF                                                                                                                                                          ROCK CHECK DAMS                                                                                                         5.   MINIMUM 4 STAPLES OR TIE WIRES PER STAKE.
                     WORK. CERTIFICATION MUST BE UNDERTAKEN BY A SUITABLY QUALIFIED,                                                                                                                                                                            N.T.S
                     EXPERIENCED PROFESSIONAL NOT DIRECTLY EMPLOYED BY THE PRINCIPAL.


                                                                                                                                                                                                                                                 CLIENT                                 PROJECT                                DRAWING
                                                                                                                APPROVED        DRAWN   JW
                                                                                                                CHARLES COOK                                                                                                                                                                                                                                                                                                                                STATUS FOR APPROVAL
                                                                                                                                                                                                                                                        ABODA DESIGN GROUP                   SMALL INDUSTRIAL TENANCIES                     EROSION & SEDIMENT
                                                                                                                RPEQ            DESIGN JW
                                                                                                                                                                                                                                                                                                                                             CONTROL DETAILS                                                                                                          PROJECT NO.         DRAWING NO.     REV NO.
                                                                                                                APPROVED DATE   CHECK   CC
                                                                                                                30.10.24                                                                                                                                                                            4 LEO ALLEY RD,
 A ISSUED FOR APPROVAL                                                                       30.10.24    CC
                                                                                                                SIGNED                                                                                                                                                                             NOOSAVILLE, QLD                                                                                                                                                       240127           OPW-C-00225         A
 P1 ISSUED FOR DISCUSSION                                                                    02.10.24    CC                                  COPYRIGHT © All rights reserved.
                                                                                                                                             This work is copyright and cannot be reproduced
                                                                                                                                                                                               CIVIL | PROJECT MANAGEMENT | TECHNICAL SERVICES
                                                                                                                                                                                               www.infinityce.com.au | ABN 72 677 371 532
REV                               DESCRIPTION                                                   DATE    APPR.                                or copied in any form without the prior consent
                                                                                                                                                                                                                                                                                                                                                                                                                   SHEET SIZE   A1
Last saved by: JESSWARD(2024-10-22) Last Plotted: 2024-10-30
Filename: C:\ICE\ICE\PROJECTS - DOCS\2024\240127_4_LEO_ALLEY_DR\04 DESIGN\CAD\240127-OPW-C-00225.DWG
Log in to download the original file

Reference Documents - MCU24 0141 & OPW24 0184 [As Published].pdf · 16.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.