Original PDF page 19, section 1. The text section number identifies this passage in the reader.
GENERAL:
1. TO BE READ IN CONJUNCTION WITH 'SEDIMENT CONTROL DEVICES', REFER STD DRG IPWEA DS-040 &
DS-041.
2. TEMPORARY DRAINAGE CONTROL FLOW SHOULD BE DIVERTED AROUND THE WORK SITE WHERE
POSSIBLE.
3. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE
COMMENCING UP-SLOPE EARTHWORKS. 2m (MIN)
FLOW CONTROL BERM INCORPORATED INTO THE
4. CONTROL MEASURES TO BE INSPECTED AT LEAST WEEKLY AND AFTER SIGNIFICANT RUNOFF MINIM
UM LE ROCK PAD IF THE PAD RECEIVES RUNOFF FROM
NGTH
PRODUCING STORMS. 10m (M THE BUILDING SITE (LOCATION MAY VARY)
IN)
5. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER 40-75mm CRUSHED ROCK 300mm (MIN)
MULCHED, COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED BUILDING LAND
10m (MIN)
TO BE DELAYED FOR MORE THAN I4 DAYS. SITE SLOPE
150-200mm N
6. CONTROL MEASURES MAY BE REMOVED WHEN ON-SITE EROSION IS CONTROLLED AND 70% MI KERB
m
PERMANENT SOIL COVERAGE IS OBTAINED OVER ALL UPSTREAM DISTURBED LAND. 2.0
Y
7. STRAW BALE SEDIMENT TRAPS ARE TO BE SECONDARY OPTION WHICH GENERALLY SHOULD NOT BE UP-SLOPE RUNOFF BD FOOTPATH
DIRECTED TO AN RP
USED IF OTHER OPTIONS ARE AVAILABLE. ROADWAY FOOTPATH
MAKE SAFE FOR
APPROPRIATE PEDESTRIAN TRAFFIC
8. ALL CAPTURED RUNOFF MUST BE TREATED TO <75NTU PRIOR TO DISCHARGE.
SEDIMENT TRAP MAK
9. SITE TO BE PROGRESSIVELY STABILISED, AIMING FOR 60% STABILISATION WITHIN 20 DAYS FROM START PEDE E SAFE TO
GEOTEXTILE FILTER CLOTH (MANDATORY STRIA
OF WORKS AND 70% OR GREATER WITHIN 2 MONTHS. WHEN WORKING ON CLAYEY SOILS) N TRA ROADWAY
FFIC
10. ALL INLET PITS TO BE PROTECTED IMMEDIATELY.
11. EROSION AND SEDIMENT CONTROL MEASURES TO BE PROGRESSIVELY REMOVED AS SITE (a) ROCK ENTRY/EXIT PAD FOR BUILDING SITES
STABILISATION IS ACHIEVED. (b) ROCK PAD SLOPING AWAY FROM ROAD
SEDIMENT CONTROL
2m (MIN)
1. ALL SEDIMENT & EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL
EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS. THE BASIC
PRINCIPLES ARE TO: BUILDING
- MINIMISE THE AREA OF DISTURBANCE; CONSTRUCTION NOTES: SITE
- CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE; MATERIALS LAND
SLOPE
10m (MIN)
- MINIMISE EROSION; ROCK: WELL GRADED, HARD, ANGULAR, EROSION RESISTANT ROCK, NOMINAL DIAMETER OF 40 TO 75mm.
- MINIMISE SEDIMENTATION; FOOTPATH STABILISING AGGREGATE: 25 TO 50mm GRAVEL OR AGGREGATE (IF REQUIRED).
- PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE GEOTEXTILE FABRIC: HEAVY-DUTY, NEEDLE-PUNCHED, NON-WOVEN FILTER CLOTH (‘BIDIM’ A24 OR SEDIMENT FENCE
2. SEDIMENT & EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE EQUIVALENT).
CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED INSTALLATION FOOTPATH MAKE SAFE FOR
NECESSARY THROUGHOUT CONSTRUCTION. 1. INSPECT ALL SITE ENTRY AND EXIT POINTS PRIOR TO FORECAST RAIN, DAILY DURING EXTENDED PEDESTRIAN TRAFFIC
3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL PERIODS OF RAINFALL, AFTER RUNOFF-PRODUCING RAINFALL, OR OTHERWISE AT FORTNIGHTLY
ORDER AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF INTERVALS. ROADWAY
MAINTENANCE OF WORKS. 2. IF SAND, SOIL, SEDIMENT OR MUD IS TRACKED OR WASHED ONTO THE ADJACENT SEALED ROADWAY,
4. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE THEN SUCH MUST BE PHYSICALLY REMOVED, FIRST USING A SQUARE-EDGED SHOVEL, AND THEN A
SUPERINTENDENT. SHALL BE COMPLETED AND EFFECTIVE PRIOR TO: STIFF-BRISTLED BROOM, AND THEN BY A MECHANICAL VACUUM UNIT, IF AVAILABLE.
(c) ROCK PAD SLOPING TOWARD THE ROAD
a. STRIPPING OF TOPSOIL AND GRASS. 3. IF NECESSARY FOR SAFETY REASONS, THE ROADWAY SHALL ONLY BE WASHED CLEAN AFTER ALL
b. BULK EARTHWORKS TO THE SITE. REASONABLE EFFORTS HAVE BEEN TAKEN TO SHOVEL AND SWEEP THE MATERIAL FROM THE ROADWAY.
c. SERVICES INSTALLATION. 4. WHEN THE VOIDS BETWEEN THE ROCK BECOMES FILLED WITH MATERIAL AND THE EFFECTIVENESS OF
d. PAVEMENT CONSTRUCTION. THE ROCK PAD IS REDUCED TO A POINT WHERE SEDIMENT IS BEING TRACKED OFF THE SITE, A NEW 100mm
LAYER OF ROCK MUST BE ADDED AND/OR THE ROCK PAD MUST BE EXTENDED.
5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED IN
5. ENSURE ANY ASSOCIATED DRAINAGE CONTROL MEASURES (e.g. FLOW CONTROL BERM) ARE
ROCK PADS FOR BUILDING SITES
WRITING FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS. N.T.S
6. BOTH TEMPORARY AND PERMANENT SEDIMENT MANAGEMENT/EROSION CONTROL DEVICES SHALL BE MAINTAINED IN ACCORDANCE WITH THEIR DESIRED OPERATIONAL CONDITION.
MAINTAINED AT A SUITABLE LEVEL/CONDITION THROUGHOUT CONSTRUCTION TO THE SATISFACTION 6. DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL NOT CREATE AN EROSION OR POLLUTION
OF THE SUPERINTENDENT. SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED HAZARD.
BY 30%.
7. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION
WITH THE APPROVED DRAWINGS.
8. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE
SUPERINTENDENT FOR THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE
TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
9. IF EROSION AND SEDIMENT CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN
SERVICE, CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE
AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH
AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND RELEVANT.
10. SEDIMENT TRAP TO BE FLOCCULATED AND DE-SILTED AS NECESSARY.
11. WATER QUALITY TESTING / MONITORING TO BE UNDERTAKEN BY CONTRACTOR. 'RETURNS' PLACED AT 20m SPACING (MAX.) IF
3m (MAX.) WITH WIRE BACKING FENCE IS LOCATED ALONG THE CONTOUR.
SEDIMENT FENCE: OTHERWISE 2m (MAX.) OTHERWISE 5 TO 10m DEPENDING ON SLOPE
1. NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
1.5m (MIN)
2. NORMALLY LOCATED ALONG THE CONTOUR WITH A MAXIMUM CATCHMENT AREA 0.6Ha PER 100m DIRECTION OF FLOW
LENGTH OF FENCE
3. WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS MAY BE USED ON SMALL WORK SITES, I.E.
OPERATIONAL PERIOD LESS THAN 6 MONTHS OR ON SITES WHERE SIGNIFICANT SEDIMENT RUNOFF IS
NOT EXPECTED.
4. WHERE FENCES NEED TO BE LOCATED ACROSS THE CONTOUR THE LAYOUT SHALL CONFORM TO
'TYPICAL LAYOUT' ACROSS GRADE.
5. FENCES ARE REQUIRED 2m MIN. FROM TOE OF CUT OR FILL BATTERS, WHERE NOT PRACTICAL ONE
FENCE CAN BE AT THE TOE WITH A SECOND FENCE 1m MIN AWAY. FENCE SHOULD NOT BE LOCATED
PARALLEL WITH TOE IF CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE.
TEMPORARY CONSTRUCTION ENTRY / EXIT: ALL SUPPORT POSTS PLACED
1. ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY FROM ENTRY/EXIT. DOWN-SLOPE OF FABRIC
2. WHEEL-WASH OR SPRAY UNIT MAY BE REQUIRED DURING WET WEATHER.
STANDARD SPECIFICATIONS: FABRIC BURIED 200mm
DRAWING TO BE READ IN CONJUNCTION WITH INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA) OPTIONAL GEOTEXTILE SPLASH PAD PLACED
AUSTRALASIA BEST PRACTICES STANDARD DRAWINGS & SPECIFICATIONS. IECA STANDARD DRAWINGS BELOW DAM TO REDUCE EROSION AT THE BASE SEDIMENT FENCE FABRIC, NOT
GENERALLY AS LISTED BELOW BUT NOT LIMITED TO: 1 OF THE CHECK DAM (GENERALLY NOT REQUIRED) FILTER CLOTH OR SHADE CLOTH
EXIT-01 - CONSTRUCTION EXIT - ROCK PAD
EXIT-02 - CONSTRUCTION EXIT - ROCK PAD
EXIT-03 - ROCK PADS FOR BUILDING SITES
CD-01 - CATCH DRAINS
CD-02 - CATCH DRAINS - EARTH LINED 1 INSTALLATION OF SEDIMENT FENCE
RCD-01 - CHECK DAMS N.T.S
FF-01 - FILTER FENCE
SF-01 - SEDIMENT FENCE 150mm (MIN)
SF-02 - SEDIMENT FENCE A A SEDIMENT FENCE CONSTRUCTION NOTES
OUTER WING POINTS A TO BE AT
B
ESC-02 - GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP 1. SEDIMENT FENCE TO BE INSTALLED ALONG A LINE OF CONSTANT GROUND
LEAST 150mm ABOVE CREST B
ESC-03 - KERB INLET SEDIMENT TRAPS ELEVATION WHEREVER PRACTICAL.
R-01 - RENEGOTIATION - GENERAL 2. BOTH ENDS OF THE SEDIMENT FENCE TO EXTEND UP THE SLOPE AT LEAST 1m.
SECTION 1-1 3. SUPPORT POST TO BE SPACED MAXIMUM 2m UNLESS THE FENCE IS SUPPORTED
FIGURE 1 - LAYOUT PROFILE OF CHECK DAMS BY ATOP WIRE OR WORE MESH BACKING, IN WHICH CASE 3m MAXIMUM SPACING.
THE EROSION & SEDIMENT CONTROL PLAN IS A CONCEPT PLAN DEMONSTRATING (ROCK CHECK DAMS SHOWN)
AN APPROACH TO EROSION & SEDIMENTATION CONTROL FOR THE SITE. IT IS THE 4. FENCE 'RETURN' SHALL BE INSTALLED AT MAXIMUM 20m SPACING IF FENCE IS
CONTRACTORS RESPONSIBILITY TO PROVIDE AN EROSION & SEDIMENT CONTROL INSTALLED ALONG THE CONTOURS, OTHERWISE 5 TO 10m MAXIMUM SPACING.
DESIGN AND A COMPLETED DESIGN CERTIFICATE PRIOR TO COMMENCEMENT OF ROCK CHECK DAMS 5. MINIMUM 4 STAPLES OR TIE WIRES PER STAKE.
WORK. CERTIFICATION MUST BE UNDERTAKEN BY A SUITABLY QUALIFIED, N.T.S
EXPERIENCED PROFESSIONAL NOT DIRECTLY EMPLOYED BY THE PRINCIPAL.
CLIENT PROJECT DRAWING
APPROVED DRAWN JW
CHARLES COOK STATUS FOR APPROVAL
ABODA DESIGN GROUP SMALL INDUSTRIAL TENANCIES EROSION & SEDIMENT
RPEQ DESIGN JW
CONTROL DETAILS PROJECT NO. DRAWING NO. REV NO.
APPROVED DATE CHECK CC
30.10.24 4 LEO ALLEY RD,
A ISSUED FOR APPROVAL 30.10.24 CC
SIGNED NOOSAVILLE, QLD 240127 OPW-C-00225 A
P1 ISSUED FOR DISCUSSION 02.10.24 CC COPYRIGHT © All rights reserved.
This work is copyright and cannot be reproduced
CIVIL | PROJECT MANAGEMENT | TECHNICAL SERVICES
www.infinityce.com.au | ABN 72 677 371 532
REV DESCRIPTION DATE APPR. or copied in any form without the prior consent
SHEET SIZE A1
Last saved by: JESSWARD(2024-10-22) Last Plotted: 2024-10-30
Filename: C:\ICE\ICE\PROJECTS - DOCS\2024\240127_4_LEO_ALLEY_DR\04 DESIGN\CAD\240127-OPW-C-00225.DWG
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.