Council archive · source document
Decision Notice - 010.2007.00001242.001 [As Published] · 142007.1242
Form 6 - Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 2007/1242 Date of Decision: 5 December 2007
1. APPLICANT DETAILS
Name: S & L Developments Pty Ltd
Postal address: CARE Ken Hicks & Associates Pty Ltd
PO Box 6380
MAROOCHYDORE BC QLD 4558
Phone no: 5443 2844 Fax no: 617 5443 7146
2. PROPERTY DESCRIPTION
Street address: 26 Eenie Creek Road NOOSAVILLE
Real property LOT: 1 SP: 182880
description:
3. OWNER DETAILS
Name: S & L Developments Pty Ltd
Postal address: PO Box 1064
MOOLOOLABA QLD 4557
4. REFERRAL AGENCIES
Referral Agency Address Basis
Department of Natural PO Box 573 NAMBOUR QLD 4560 Advice
Resources, Mines and
Water
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Operational Works - In accordance with Engineering drawings Nos. No Yes
Roads & Drainage,
Water & Sewage M30148/C00D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C01D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C02D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C03D dated 26 November 2007 by Barlow
Gregg VDM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 17
M30148/C04D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C05D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C06D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C07D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C08D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C09E dated 26 November 2007 by Barlow
Gregg VDM
M30148/C10D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C11D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C12D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C13D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C14D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C15D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C16D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C17D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C19D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C20D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C21D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C22E dated 26 November 2007 by Barlow
Gregg VDM
M30148/C23D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C24D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C25D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C26D dated 26 November 2007 by Barlow
Gregg VDM
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 17
M30148/C27D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C28D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C29D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C31D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C32D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C33D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C34E dated 26 November 2007 by Barlow
Gregg VDM
M30148/C35D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C36D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C37D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C38D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C39D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C40D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C41D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C42D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C43D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C44D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C45D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C46D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C47D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C48D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C49E dated 26 November 2007 by Barlow
Gregg VDM
.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 17
M30148/C50D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C51D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C52D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C53D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C54D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C55D dated 26 November 2007 by Barlow
Gregg VDM
M30148/C56C dated 26 November 2007 by Barlow
Gregg VDM
or as modified herein.
6. DECISION DETAILS
Council decided to approve this application on 5 December 2007, subject to conditions.
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Locality Codes:-
Noosaville
Overlay Codes:-
Natural Hazards and Natural Resources
Works Codes:-
Engineering Works Codes.
8. CONDITIONS
The approval is subject to conditions. Noosa Council’s conditions are attached.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
N/A
10. RIGHTS OF APPEAL
Rights of appeal in relation to this application are attached.
11. ASSESSMENT MANAGER
Name: Noosa Council Signature: Date:
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 17
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. The development shall be carried out in accordance with Engineering drawings Nos.
M30148/C00D dated 26 November 2007 by Barlow Gregg VDM
M30148/C01D dated 26 November 2007 by Barlow Gregg VDM
M30148/C02D dated 26 November 2007 by Barlow Gregg VDM
M30148/C03D dated 26 November 2007 by Barlow Gregg VDM
M30148/C04D dated 26 November 2007 by Barlow Gregg VDM
M30148/C05D dated 26 November 2007 by Barlow Gregg VDM
M30148/C06D dated 26 November 2007 by Barlow Gregg VDM
M30148/C07D dated 26 November 2007 by Barlow Gregg VDM
M30148/C08D dated 26 November 2007 by Barlow Gregg VDM
M30148/C09E dated 26 November 2007 by Barlow Gregg VDM
M30148/C10D dated 26 November 2007 by Barlow Gregg VDM
M30148/C11D dated 26 November 2007 by Barlow Gregg VDM
M30148/C12D dated 26 November 2007 by Barlow Gregg VDM
M30148/C13D dated 26 November 2007 by Barlow Gregg VDM
M30148/C14D dated 26 November 2007 by Barlow Gregg VDM
M30148/C15D dated 26 November 2007 by Barlow Gregg VDM
M30148/C16D dated 26 November 2007 by Barlow Gregg VDM
M30148/C17D dated 26 November 2007 by Barlow Gregg VDM
M30148/C19D dated 26 November 2007 by Barlow Gregg VDM
M30148/C20D dated 26 November 2007 by Barlow Gregg VDM
M30148/C21D dated 26 November 2007 by Barlow Gregg VDM
M30148/C22E dated 26 November 2007 by Barlow Gregg VDM
M30148/C23D dated 26 November 2007 by Barlow Gregg VDM
M30148/C24D dated 26 November 2007 by Barlow Gregg VDM
M30148/C25D dated 26 November 2007 by Barlow Gregg VDM
M30148/C26D dated 26 November 2007 by Barlow Gregg VDM
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 17
M30148/C27D dated 26 November 2007 by Barlow Gregg VDM
M30148/C28D dated 26 November 2007 by Barlow Gregg VDM
M30148/C29D dated 26 November 2007 by Barlow Gregg VDM
M30148/C31D dated 26 November 2007 by Barlow Gregg VDM
M30148/C32D dated 26 November 2007 by Barlow Gregg VDM
M30148/C33D dated 26 November 2007 by Barlow Gregg VDM
M30148/C34E dated 26 November 2007 by Barlow Gregg VDM
M30148/C35D dated 26 November 2007 by Barlow Gregg VDM
M30148/C36D dated 26 November 2007 by Barlow Gregg VDM
M30148/C37D dated 26 November 2007 by Barlow Gregg VDM
M30148/C38D dated 26 November 2007 by Barlow Gregg VDM
M30148/C39D dated 26 November 2007 by Barlow Gregg VDM
M30148/C40D dated 26 November 2007 by Barlow Gregg VDM
M30148/C41D dated 26 November 2007 by Barlow Gregg VDM
M30148/C42D dated 26 November 2007 by Barlow Gregg VDM
M30148/C43D dated 26 November 2007 by Barlow Gregg VDM
M30148/C44D dated 26 November 2007 by Barlow Gregg VDM
M30148/C45D dated 26 November 2007 by Barlow Gregg VDM
M30148/C46D dated 26 November 2007 by Barlow Gregg VDM
M30148/C47D dated 26 November 2007 by Barlow Gregg VDM
M30148/C48D dated 26 November 2007 by Barlow Gregg VDM
M30148/C49E dated 26 November 2007 by Barlow Gregg VDM
M30148/C50D dated 26 November 2007 by Barlow Gregg VDM
M30148/C51D dated 26 November 2007 by Barlow Gregg VDM
M30148/C52D dated 26 November 2007 by Barlow Gregg VDM
M30148/C53D dated 26 November 2007 by Barlow Gregg VDM
M30148/C54D dated 26 November 2007 by Barlow Gregg VDM
M30148/C55D dated 26 November 2007 by Barlow Gregg VDM
M30148/C56C dated 26 November 2007 by Barlow Gregg VDM
or as modified herein.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 17
2. A revised erosion and sediment control plan shall be submitted to Council for approval prior to the pre
start meeting. The revised plan shall be prepared in accordance with the manual titled Soil Erosion and
Sediment Control – Engineering Guidelines for Queensland Construction Sites prepared by The Institute
of Engineers, Australia Queensland Division and shall include additional features to control the movement
of sediment from the disturbed areas. The revised plan shall include but not be limited to descriptions of
the maximum for disturbed areas, temporary sediment control basins, internal cut off drains and other
interim measures such as sediment fencing.
3. No works shall be undertaken within the covenant area within proposed Lot 4. In this regard Drawing No
M30148/C36D dated 26 November 2007 by Barlow Gregg VDM shall be revised to indicate that the
proposed swale drain is setback 3m from the western and south-western property boundary. The revised
drawing shall be submitted to Council for approval prior to the commencement of any works within Lot 4.
4. Only plans having the stamped approval of the relevant Council Officer shall be used on site for
construction purposes. In this regard copies of the stamped approved plans shall be provided to all
contractors and additional copies are to be made available on site.
5. Those sections of the proposed footpath located on the north-eastern side of the intersection of
Production Street and Rene Street shall be setback a minimum of 900mm from the kerb line at the
intersection. The alignment of the footpath shall then taper to the alignment at the common boundary of
proposed Lot 2 and Lot 307 SP103421 as shown on drawing No M3048-C16B dated 8/10/07 prepared by
Barlow Gregg VDM.
6. Bike Lane markings shall have a broken edge line for a minimum of 25m on the departure and entry legs
of the proposed roundabout.
7. The collection, treatment and disposal of stormwater runoff generated by the development shall be
undertaken generally in accordance with The Stormwater Management Plan Part A Stormwater Quantity
and Part B Stormwater Quality reference M3048 dated Amended October 2007 prepared by Barlow Gregg
VDM.
8. All earthworks, including banks and batters, are to be wholly contained within the relevant lot.
9. The applicant shall monitor the quality of stormwater runoff exiting the sites for 3 years to ensure that the
waters achieve the water quality objectives as set out by Noosa Council and as described in The
Stormwater Management Plan Part B Stormwater Quality reference M3048 dated Amended October 2007
prepared by Barlow Gregg VDM. Should the monitoring indicate that the objectives have not been met or
indicate that the objectives may not be met the applicant shall undertake the necessary works to ensure
the objectives are achieved.
10. The expansion joints in any bikeway/footpath shall be “sawcut” not trowel jointed.
11. The total required pavement thickness shall be based on the Department of Transport’s Pavement Design
Manual using soaked CBR tests of the subgrade.
The design pavement thickness, together with CBR test results shall be submitted to Council’s Manager -
Land Development for approval prior to placement of pavement material.
12. The finished level of all mulch in garden beds and landscaped medians is to be a minimum of 50mm
below the level of the adjacent top of kerb. All landscaping is to be constructed in accordance with
Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.
13. Suitable root barrier shall be installed where proposed trees are adjacent to paths, pavement etc in
accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.
14. Suitable sediment control devices shall be temporarily installed into the first existing external downstream
stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
These devices are to remain in place during the civil works and construction phases of the development.
The location and type of device to be installed shall be established at the “pre start” meeting with
Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
15. Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of
intention to commence works to arrange a “pre start” meeting regarding the civil works.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 8
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 17
16. The principal contractor must have all the appropriate insurance and public liability documentation to carry
out the works. The principal contractor is also responsible to ensure that any sub contractors also have
the appropriate insurance and public liability documentation.
17. Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
signed approved drawings and conditions by the applicant.
18. Please provide one copy (A3 size) of the approved plans and a copy of the job specifications for Council’s
Construction Technical Officer.
19. The Consulting Engineers for the project shall be currently Registered Professional Engineers of
Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
Council’s Construction Technical Officer or nominated staff. Council’s Construction Technical Officer shall
provide an inspection form for signing off by the Engineer at appropriate stages of construction, during on-
site meetings. Construction Technical Officer will also sign the form at each stage when conditions
required have been satisfied. The works will be accepted “On Maintenance” after this form, signed by the
inspector for each stage is complete, together with a letter from the Engineer requesting that the works go
“On Maintenance”.
20. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
(This person will be the contact for the project).
21. An inspection is to be carried out with the relevant Council officers, the Contractor and Supervising
Engineer after road centrelines, drainage centrelines, proposed boundaries and open space boundaries
have been marked on site, and prior to clearing being carried out. This inspection is to deal with the limits
of clearing to be carried out for this development. This meeting is to take place prior to the “Pre-start”
meeting.
22. Council standards shall apply to these works unless otherwise modified herein.
23. The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
during the construction of the engineering works to ensure that Council property, road pavements or
facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
furniture etc.) are protected against any damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
Development and shall forthwith rectify the damage to that property or facility at its cost and to the
satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the sealing of the survey plan or, alternatively, the
Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
being paid by the Applicant to the Council prior to the sealing of the survey plan.
In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
Applicant, such cost being paid prior to the sealing of the survey plan.
24. The development of the site shall be carried out in such a manner as to prevent dust and/or sand
nuisance to residents and/or tenants in the vicinity of the development.
25. Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
hours are approved by the Manager-Land Development or his nominee.
26. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
Traffic Control Devices and Traffic Infrastructure (Roads) Act.
27. Safe pedestrian and vehicle access on Eenie Creek Road, Rene Street and Hoffman Drive shall be
maintained at all times. Should footpath / road closures be necessary to carry out construction works,
Council’s Construction Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 9
NOOSA COUNCIL IDAS Development Application Decision Notice 9 of 17
28. Sediment and erosion control measures must be in place prior to works commencing. If such measures
are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
natural waterways. Although the sediment and erosion control measures have been approved Council’s
Manager – Land Development may request further controls to be installed should approved measures be
inefficient.
29. Certification of the completed works must be provided by the supervising engineer, together with
certification from the Hydraulic Engineer that the completed works conform with all aspects of the
stormwater design and the designed environmental outcomes for the development.
30. Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement of
satisfactory “As Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for
design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all
services and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures,
finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
Drainage and Earthworks.
Approval of works shall not be granted until all As Constructed information has been supplied and
accepted by Council.
31. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
on construction works during the maintenance period, which is a minimum period of 12 months duration.
Such bond must be lodged by, and shall only be accepted from the Developer for the works.
32. The works to become Council assets will not be accepted "On Maintenance" until the landscaping is
completed.
33. These works are also to be in compliance with the relevant conditions of Development Permit No.
2006/1594.
34. Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the Relevant Period is two (2) years
from the day this permit takes effect during which time all conditions must have been complied with and
the Plan of Survey lodged with the Council for endorsement.
35. Notwithstanding that Council has checked the plans with due care, where it is found during construction
that variations from Council's standards exist, then Council standards shall apply
Land Use
36. Development undertaken in accordance with this approval must comply with the approved management
plans for the site.
Open Space and Environmental Covenant Areas
Lot 1
37. Existing trees on the site located within the OS3 and OS6 environmental covenant areas and within the
Eenie Creek Road reserve are to be retained and protected from construction damage, except where
required to be removed due to the requirements of the approved ecological restoration plan; and where
any work in the vicinity of the service access through OS3 shall minimise any disturbance to the existing
vegetation in this area.
38. The OS3 covenant area southern boundary and the full boundary perimeter of the OS6 covenant area are
to be fenced with star picket and wire as temporary fencing prior to any construction work commencing on
the site, and maintained for the duration of the construction process. No access into this area is permitted
except for ecological restoration purposes.
Lot 3
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 10
NOOSA COUNCIL IDAS Development Application Decision Notice 10 of 17
39. Vegetation within the southern covenant area (5m wide) is to be reinstated with broadleaf “Sir Walter”
buffalo turf; or preferably reinstated with low native and endemic plants and mulch to provide a fully
planted ground cover in compliance with any requirements of the fire management plan. The covenant
area shall be fully stabilised within 2 weeks of the completion of earthworks in this area.
Lot 4
40. Existing trees on the site located within the western covenant area (3 meters wide) are to be retained and
protected from construction damage, except where required to be removed due to the requirements of the
approved ecological restoration plan.
41. The boundary of the covenant area is to be fenced along the eastern, northern and southern boundary
with star picket and wire as temporary fencing prior to any construction work commencing on the site, and
maintained for the duration of the construction process. No access into this area is permitted except for
ecological restoration purposes.
42. The Lot 5 - OS2 and OS4 open space boundary perimeter (where it meets road reserve and lot
boundaries) is to be fenced with star picket and 2 strand wire as temporary fencing prior to any
construction work commencing on the site, and maintained for the duration of the construction process.
Appropriate signage shall be erected on the fence in accordance with management plan requirements.
No access into this area is permitted except for ecological restoration purposes. No removal of natural
vegetation is to occur in the Lot 5 - OS2 and OS4 open space areas for the creation of fire breaks or fire
buffers.
Lot 5 - OS7
43. The applicant shall comply with the requirements of the approved Site Rehabilitation Plan for any
undeveloped land area of the lot located within OS7 and beyond the road reserve. No works are to occur
within OS7 except ecological rehabilitation works.
General
44. The management of acid sulfate soils on the site shall comply with the requirements of the Construction
EMP and the Acid Sulfate Soil Investigation by Golder Associates, with existing acidity within the soil to be
managed.
45. Stormwater and sediment control management on the site shall comply with the management plan
requirements regarding the protection of wallum froglet habitat at all times.
46. All relevant work specified in the site rehabilitation plan, ecological restoration plan and open space
management plan shall be completed to the reasonable satisfaction of the Manager Land Use prior to
Council endorsing the Plan of Survey.
47. Additional reinforcement plantings shall occur in private open space and protected areas (OS3, OS6,
OS7, Lot 4 covenant area) as ecologically required to reinstate the natural vegetation. Additional
reinforcement plantings shall also occur in the Lot 5 public open space area OS2 & OS4 as ecologically
required to reinstate the natural vegetation prior to dedication to Council. All work shall be in accordance
with the requirements of the Site Rehabilitation Plan.
48. No unrestrained dogs shall be permitted on site during construction.
49. The provision of high-speed telecommunications infrastructure is required to be provided to all lots.
Provision for full broad band capacity to each lot is to be provided that gives access to broadband
infrastructure capable of providing data transmission at technologically advanced speeds existing at the
time of development. Such capability is to be provided either by underground conduit or other low visual
impact method. The intra-site broadband infrastructure shall connect to a suitable external broadband
network.
Vegetation Removal
50. Clearing of existing vegetation on the site shall only occur where removal is required to enable
construction of roads, stormwater drainage, water & sewer reticulation, accesses or pegging of surveyed
boundaries, or sequential clearing of lots to allow approved earthworks to occur.
Suitably qualified cultural monitors and wildlife spotters and handlers shall be available on site during the
works to assess any cultural findings and manage any wildlife disturbed.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 11
NOOSA COUNCIL IDAS Development Application Decision Notice 11 of 17
The clearing shall occur sequentially commencing with the new road and then continuing from north to
south through the site, with each stage being stabilised with grass or other suitable material as approved
by Council’s Manager Land Development sufficient to contain and control the surface within one month of
clearing of vegetation for the stage and within 2 weeks of the completion of earthworks for the stage, and
prior to the next stage being cleared.
Particular care shall be taken not to disturb vegetation adjacent to existing creeks and watercourses and
open space areas. The open space and statutory covenant areas (OS3, OS6, OS2, OS4, OS7, Lot 4
covenant area) shall be protected from clearing except in accordance with the approved Site
Rehabilitation Plan.
51. Vegetation removal, tree felling and lopping adjacent to vegetation to be retained in the open space areas
shall be undertaken in an environmentally sensitive manner to avoid damaging surrounding vegetation,
trees and habitat.
52. Prior to felling or lopping all trees are to be checked for wildlife (eg. koalas, cockatoos, possums). If
wildlife species are present, the tree shall not be felled or lopped until the wildlife has left the tree.
53. All cleared vegetation shall be suitably processed or removed from the site by a method approved by
Council. Cleared vegetation is to be suitably processed by one of the following methods:-
53.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in
heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres
between edges of heaps.
53.2. Disposal for firewood.
53.3. Disposal for landscaping purposes.
53.4. Transport to alternative site for breaking down materials provided that all necessary permits have
been obtained to allow the alternate site to be used for this purpose.
53.5. The disposal method for clearing works is to be submitted in conjunction with an application for a
Development Permit for Operational Work. The Applicant is advised that other methods may be
considered provided full details of the method are submitted.
53.6. The Applicant is advised that burning off is an unacceptable method of disposal.
54. All earthworks shall be adequately stabilised with a minimum of 50% ground cover per square metre at
acceptance on-maintenance; and achieve a stable and robust cover of minimum 80% per square metre at
off maintenance inspection after 1 year and prior to the sealing of the survey plan by Council.
Weed and Pest Removal
55. In order to protect the ecological values of the site the following shall apply:
55.1. prior to first entering the site, all construction machinery and vehicles shall be washed down to
remove soil that may contain weed seeds, soil pathogens and pest species;
55.2. all nursery stock shall be weed, pest and disease free and certified as such by the supplier;
55.3. all imported fill, soil, gravel and other construction and landscaping materials shall be weed, pest
and disease free and certified as such by the supplier;
55.4. all mulch used on the site shall be weed, pest and disease free and certified as such by the
supplier;
55.5. all mulch produced on-site by mulching cleared vegetation and trees shall specifically exclude
material (particularly seeds) from weed species (eg. lantana, asparagus fern and umbrella trees);
and
55.6. the certificates referred to above are to be obtained prior to the use of the material on-site and to
be made available to Council.
56. Soil disturbance in the open space areas shall be kept to a minimum to avoid weed proliferation.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 12
NOOSA COUNCIL IDAS Development Application Decision Notice 12 of 17
57. Weed species cleared from the site shall not be mulched. Vegetative material from weed species shall be
removed from the site and disposed of in a Council approved refuse tip.
All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and Stock Route
Management) Act 2002 are to be controlled on the site prior to Council endorsement of the plan of survey.
In this context “controlled” shall mean, for class 1 and 2 pests, completely eradicated. For class 3 pests it
shall mean removal of the plants where they threaten environmentally significant areas of the site such as
riparian zones and areas of natural vegetation.
Where class 3 plants are removed as a result of this condition and there is not sufficient natural
regeneration of native species, the areas shall be replanted with endemic native species so that a
sustainable natural ecosystem is restored.
Council’s Conservation Management Supervisor will inspect the site after the weed treatment and
replanting is complete.
Water and Sewer
The water & sewerage plans listed below are satisfactory:
Water
M3048 – C66D – Water Layout Plan Sheet 1 of 2
M3048 – C67D – Water Layout Plan Sheet 2 of 2
Sewerage
M3048 – C58D – Sewerage Layout Plan Sheet 1 of 4
M3048 – C59D – Sewerage Layout Plan Sheet 2 of 4
M3048 – C60D – Sewerage Layout Plan Sheet 3 of 4
M3048 – C61D – Sewerage Layout Plan Sheet 4 of 4
M3048 – C62D – Pump Station Access Layout Plan
M3048 – C63D – Sewerage Longitudinal Section – Line 07
M3048 – C64D – Sewerage Longitudinal Section – Line 30 & 33
M3048 – C65D – Sewerage Longitudinal Section – Line 37 & 38
This Decision Notice is issued subject to and conditional upon the relevant Approved Development Permit
having been granted to the applicant.
58. Existing leachate disposal system including all pipes, risers, fittings and vent pole to be relocated by
Approved Contractor to existing manhole NV11/28/01A adjacent to sewerage pump station to the
satisfaction of Noosa Council’s Water & Sewerage Capital Works Manager.
59. A copy of the job specification is to be provided to Council’s Inspector within seven (7) days of the date of
this Decision Notice, and prior to commencement of works.
60. The names of any proposed contractors for works are to be submitted in writing, together with copies of
current Public Liability and Workers Compensation Insurances together with certificates of currency for
those policies, for consideration by the Assessment Manager seven (7) days prior to pre-start meetings
and commencement of works.
A separate letter will then be issued approving the contractor (or otherwise) for the works. No other
contractor or subcontractor shall be engaged to carry out the works or any part of the works without the
written approval of the Assessment Manager.
61. Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence works. A
pre-start meeting shall be arranged prior to commencement of works by contacting Council’s Water &
Sewerage Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is only available for pre-start
meetings, inspections and testing etc. between the hours of 6:30am to 4:00pm, Monday to Friday.
Inspector will not be available outside these hours unless prior approval is obtained from the Water &
Sewerage Capital Works Manager with any costs incurred by Council outside the hours nominated above,
met by the Contractor/Developer. These costs will be in addition to normal inspection fees.
62. Notwithstanding that Council has checked the plans with due care, where it is found during construction
that variations exist with Council's standards, Council standards shall apply.
63. It is the responsibility of the applicant to ensure that its consultants and contractors take all reasonable
care during the construction of the engineering works to ensure that Council property or facilities (such as
underground drainage, water supply and sewerage) are protected against any damage or interference
whatsoever.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 13
NOOSA COUNCIL IDAS Development Application Decision Notice 13 of 17
64. If any Council property or facilities should be damaged by the applicant or any of its consultants or
contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the applicant and/or its contractors shall forthwith notify the Assessment Manager and
shall forthwith rectify the damage to that property or facility at its cost to the satisfaction of the Assessment
Manager prior to the sealing of the survey plan and/or acceptance of the works on-maintenance.
Alternatively, the applicant may request the Council to carry out the rectification work at the applicant's
cost, such cost being paid by the applicant to the Council prior to the sealing of the survey plan and/or
acceptance of the works 'on maintenance' provided that in the case of emergency, the Council shall be
entitled to rectify such damage at the cost of the applicant such cost being paid prior to the sealing of the
survey plan and/or acceptance of the work 'on maintenance'.
65. The Contractor shall make all necessary arrangements for supply of water required for construction works.
The use of hydrant standpipes on Council mains will NOT be permitted. Contractors should contact
Council’s Water Section on phone 5449 5254 to obtain an application form for issue of a key to access
Council’s water tanker filling stations. Conditions of access and location of filling stations are detailed on
the application form.
66. All connections to existing live water mains are to be carried out by Noosa Council at completion of
construction of internal works.
67. All sewerage reticulation mains are to be inspected by closed circuit television (CCTV) prior to acceptance
'on maintenance'.
68. CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following
satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV
inspection, including any additional inspection necessary following defect identification and rectification.
This charge is payable prior to commencement of works and will be determined on the unit rate basis
current at the time of approval.
69. Bi-directional blue fire hydrant raised reflective markers are to be installed as per Noosa Shire Council
requirements (Stimsonite Aust. Pty Ltd, Part No. 911AB or approved equivalent).
70. Bi-directional yellow valve raised reflective markers are to be installed as per Noosa Shire Council
requirements (Stimsonite Aust. Pty Ltd, Part No. 911AY or approved equivalent).
71. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
Traffic Control Devices and Main Roads Department Roadworks Signing Guide.
72. As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone 56
coordinate value to the standards and requirements of the Assessment Manager are required for Council
records. Such 'as constructed' drawings will be required prior to works being accepted "on maintenance",
where applicable. Requirements for "as constructed" information are detailed in the current version of
Council's Engineering Design Standards (Water & Sewerage) Manual.
73. Release of plans of survey and/or acceptance of the works on-maintenance will not be considered until
lodgement of satisfactory 'as constructed' records.
74. Please note that bonding of outstanding works will not be considered by Council.
75. The Consulting Engineers for the project, Barlow Gregg VDM, are responsible for arranging all inspections
and ensuring that all relevant details required by Council are supplied. The attached Water and
Sewerage Inspection Report form is to be kept by you and presented to Council's Inspector at each stage
of the development requiring a meeting or inspection. The Inspector will sign the form at each stage when
conditions have been satisfied. The works will be accepted 'on maintenance' when this form, signed by
the Inspector for each stage, is returned with a letter requesting that it go 'on maintenance'.
76. It is Council policy that a maintenance bond be imposed on construction works during the maintenance
period. The maintenance bond shall be 5% of the agreed value of the development obligations, or $1,500
whichever is the greater amount. This bond must be lodged by (and shall only be accepted from) the
Developer for the works.
77. Construction work and other associated activities are permitted only during the hours of 7:00am and
6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
hours are approved by the Assessment Manager or his nominee.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 14
NOOSA COUNCIL IDAS Development Application Decision Notice 14 of 17
78. Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
Inspector shall be present during any work on live sewer undertaken by contractor. An additional fee of
$155.00 (included below) is required to cover costs associated with these live sewer works.
79. Fees applicable to the above project are listed below (PAID on 28/6/07 – RN 295504).
Plan Examination $ 890.00
Inspection Fee $ 775.00
Checking as-constructed data $ 130.00
CCTV fee $2580.00
Live sewer inspection $ 155.00
TOTAL PAID 28/6/07 RN295504 $4,530.00
80. Council will provide all fittings and valves for the cut-in to the existing water supply as well as labour to
perform the cut-in. The Developer shall bear the actual cost of this work, and payment shall be made
before the cut-in is done.
81. All water connection fees are to be paid prior to the pre-start meeting.
82. The water main must be commissioned prior to installing the water services and water meters.
83. The water service tappings on the new water main/s within the development must be undertaken by an
approved subcontractor under direct Council supervision. Tappings on water mains not constructed as
part of the development works are to be carried out by Noosa Shire Council at developer’s cost.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 15
NOOSA COUNCIL IDAS Development Application Decision Notice 15 of 17
Local Laws, Policies & State
Regulation Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. Should any changes or modifications to the approved plans be required as a result of construction
constraints, a Change to an Existing Approval Application under the Integrated Planning Act must be made.
Amended plans clearly indicating the changes must be lodged with this application along with the
appropriate fees.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 16
NOOSA COUNCIL IDAS Development Application Decision Notice 16 of 17
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (6) If an application involves assessment against
Planning Act (Chapter 4). a concurrence agency code, appeal rights for
submitters for the application are not available
Division 8 - Appeals to court relating to
against the part of the approval that represents the
development applications
concurrence agency’s response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of
may appeal to the court against any of the following- its jurisdiction, appeal to the court about the giving of
(a) the refusal, or the refusal in part, of a a development approval for a development
development application; application if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code (b) the advice agency told the applicant and the
1
under section 3.1.6; assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must Appeals for matters arising after approval given
be started within 20 business days (the “applicant’s (co-respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
(3) An appeal under subsection (1)(e) may be the following notices have been given may appeal to
started at any time after the last day a decision on the the court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for
Appeals by submitters extension of the currency period for an approval;
4.1.28.(1) A submitter for a development application (b) a notice giving a decision on a request to make a
may appeal to the court about- minor change to an approval.
(a) the giving of a development approval, including (2) The appeal must be started within 20 business
any conditions (or lack of conditions) or other days after the day the notice of the decision is given
provisions of the approval; or to the person.
(b) the length of a currency period for the approval. (3) Subsection (1)(a) does not apply if the
(2) The appeal must be started within 20 business approval resulted from a development application
(superseded planning scheme) that was assessed as
days (the “submitters appeal period”) after the day
if it were an application under a superseded planning
the decision notice or negotiated decision notice is
scheme.
given to the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the
mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the
against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be
(4) If an application involves both impact
started at any time after the last day the decision on
assessment and code assessment, appeal rights for
the matter should have been made.
submitters are available only for the part of the
application involving impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the (no co-respondents)
application are available only for the aspects of the
development that would have required public 4.1.31.(1) A person to whom any of the following
notification under the repealed Act. notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Page 17
NOOSA COUNCIL IDAS Development Application Decision Notice 17 of 17
2
(b) a notice under section 6.1.44 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
Used in these records
Decision Notice - 010.2007.00001242.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 58 KB (small file)
- File type
No other editions are linked here.