NOOSA COUNCIL IDAS Development Application Decision Notice 13 of 17
64. If any Council property or facilities should be damaged by the applicant or any of its consultants or
contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the applicant and/or its contractors shall forthwith notify the Assessment Manager and
shall forthwith rectify the damage to that property or facility at its cost to the satisfaction of the Assessment
Manager prior to the sealing of the survey plan and/or acceptance of the works on-maintenance.
Alternatively, the applicant may request the Council to carry out the rectification work at the applicant's
cost, such cost being paid by the applicant to the Council prior to the sealing of the survey plan and/or
acceptance of the works 'on maintenance' provided that in the case of emergency, the Council shall be
entitled to rectify such damage at the cost of the applicant such cost being paid prior to the sealing of the
survey plan and/or acceptance of the work 'on maintenance'.
65. The Contractor shall make all necessary arrangements for supply of water required for construction works.
The use of hydrant standpipes on Council mains will NOT be permitted. Contractors should contact
Council’s Water Section on phone 5449 5254 to obtain an application form for issue of a key to access
Council’s water tanker filling stations. Conditions of access and location of filling stations are detailed on
the application form.
66. All connections to existing live water mains are to be carried out by Noosa Council at completion of
construction of internal works.
67. All sewerage reticulation mains are to be inspected by closed circuit television (CCTV) prior to acceptance
'on maintenance'.
68. CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following
satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV
inspection, including any additional inspection necessary following defect identification and rectification.
This charge is payable prior to commencement of works and will be determined on the unit rate basis
current at the time of approval.
69. Bi-directional blue fire hydrant raised reflective markers are to be installed as per Noosa Shire Council
requirements (Stimsonite Aust. Pty Ltd, Part No. 911AB or approved equivalent).
70. Bi-directional yellow valve raised reflective markers are to be installed as per Noosa Shire Council
requirements (Stimsonite Aust. Pty Ltd, Part No. 911AY or approved equivalent).
71. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
Traffic Control Devices and Main Roads Department Roadworks Signing Guide.
72. As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone 56
coordinate value to the standards and requirements of the Assessment Manager are required for Council
records. Such 'as constructed' drawings will be required prior to works being accepted "on maintenance",
where applicable. Requirements for "as constructed" information are detailed in the current version of
Council's Engineering Design Standards (Water & Sewerage) Manual.
73. Release of plans of survey and/or acceptance of the works on-maintenance will not be considered until
lodgement of satisfactory 'as constructed' records.
74. Please note that bonding of outstanding works will not be considered by Council.
75. The Consulting Engineers for the project, Barlow Gregg VDM, are responsible for arranging all inspections
and ensuring that all relevant details required by Council are supplied. The attached Water and
Sewerage Inspection Report form is to be kept by you and presented to Council's Inspector at each stage
of the development requiring a meeting or inspection. The Inspector will sign the form at each stage when
conditions have been satisfied. The works will be accepted 'on maintenance' when this form, signed by
the Inspector for each stage, is returned with a letter requesting that it go 'on maintenance'.
76. It is Council policy that a maintenance bond be imposed on construction works during the maintenance
period. The maintenance bond shall be 5% of the agreed value of the development obligations, or $1,500
whichever is the greater amount. This bond must be lodged by (and shall only be accepted from) the
Developer for the works.
77. Construction work and other associated activities are permitted only during the hours of 7:00am and
6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
hours are approved by the Assessment Manager or his nominee.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001242.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 58 KB (small file)
- File type
No other editions are linked here.