                       AGENDA


         General Committee
              Meeting


              Monday, 24 August 2015

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Bob Abbot, Sandy Bolton,
             Joe Jurisevic, Frank Pardon, Noel Playford, Tony Wellington



   “Engagement with our community to protect and enhance our lifestyle”
Log in to download the original file

2015-08-24 General Committee Agenda(PDF, 5MB).pdf · 5.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 39 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                                      24 AUGUST 2015


TABLE OF CONTENTS

ITEM                                                                                              PAGE


ATTENDANCE & APOLOGIES                                                                                 -
PRESENTATIONS                                                                                          -
ITEMS REFERRED FROM INFRASTRUCTURE & SERVICES COMMITTEE                                               2
2      WHOLE OF SHIRE FORWARD PLANNING & DESIGN PROGRAM
       (Previously distributed in the Infrastructure & Services Committee Agenda, Page 9)
       Reason for referral – I&S Committee request further detail on the proposed forward
       planning projects.
       (Further report provided at Item 1, Page 21)


ITEMS REFERRED FROM PLANNING & ORGANISATION COMMITTEE                                                 2

3      APPLICATION FOR SIGNAGE SITUATED AT 1/25 HASTINGS STREET, NOOSA
       HEADS OPW15/0118
       (Previously distributed in the Planning & Organisation Committee Agenda, Page 20)
       Reason for referral – Further report requested with further information regarding
       shop/window-front signage.
       (Further report provided at Item 1, Page 24)


5      PROPOSED EXPENDITURE OF KOALA OFFSET CONTRIBUTION - SETTLERS
       COVE
       (Previously distributed in the Planning & Organisation Committee Agenda, Page 55)
       Reason for referral – Cr Wellington disagrees with the recommendation.


11     YEAR IN REVIEW - 2014-2015
       (Previously distributed in the Planning & Organisation Committee Agenda, Page 95)
       Reason for referral – Significance of issue.


REPORTS DIRECT TO GENERAL COMMITTEE                                                                   3

1      COMMUNITY JURY RECOMMENDATIONS ON MIMINISING ORGANIC WASTE
       TO LANDFILL                                                                                     3

2      WHOLE OF SHIRE FORWARD PLANNING DESIGN PROGRAM - FURTHER
       REPORT                                                                                        21

3      DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS FOR SIGNAGE
       OPW15/0118 - FURTHER REPORT                                                                   24

4      BUDGET REVIEW FOR 2014/15 CARRYOVER EXPENDITURE                                               28

CLOSED SESSION                                                                                   -


                                                                                            Page 2 of 40

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                                  24 AUGUST 2015


REPORTS DIRECT TO GENERAL COMMITTEE
1                        COMMUNITY JURY RECOMMENDATIONS ON MIMINISING ORGANIC WASTE TO
                         LANDFILL
DOCUMENT INFORM AT ION




Author                              Manager Waste and Environmental Health, Wayne Schafer
                                    Community Services Department

Index                               ECM/Waste Management, Subject: Waste - Council Reports
                                    ECM/Community Engagement, Subject: Community Jury

Attachments                         1.    Noosa Community Jury’s Verdict – Findings and Recommendations
                                          on the Best Way to Minimise Organic Waste to Landfill (Version 5)


EXECUTIVE SUMMARY
Nil

RECOMMENDATION
That Council note the report by the Manager Waste and Environmental Health to the General
Committee dated 24 August 2015 and Attachment 1, “Noosa Community Jury’s Verdict –
Findings and Recommendations on the Best Way to Minimise Organic Waste to Landfill”, and:

A.                       Thank the Community Jury members for participating in the Community Jury Process, for
                         their dedication and time attending meetings, researching material and finalising their
                         Report and Recommendations to Council;

B.                       Agree in principle to the introduction of a mandated Garden Organics Waste Collection
                         Service to urban areas of Noosa Shire and refer the proposal to a Council workshop to
                         consider details of who would receive the service, how the service would be implemented
                         and timing for its introduction;

C.                       Agree in principle to the introduction of a future Food and Garden Organic waste collection
                         service to sections of the Noosa Community and refer the proposal to a Council Workshop
                         to consider who would receive the service, how it would be implemented and timing for its
                         introduction;

D.                       Agree in principle to a ban on single use non-biodegradable plastic bags in Noosa and
                         refer the proposal to a Council Workshop to consider how this might be implemented; and

E.                       Agree with the Jury recommendations regarding the need for a comprehensive community
                         education and information campaign to accompany the introduction of any significant
                         changes to the waste collection services currently provided by Council.


REPORT
Background

Council resolved to consider its future strategic direction for Waste Management in Noosa shortly
after the establishment of the new Noosa Council. Council initially engaged Trevor Lloyd
Consulting to attend a Councillor workshop to discuss the principal elements that should be
considered in Council’s new waste management plan, “Towards Zero Waste”.



                                                                                                      Page 3 of 40

Section 4

GENERAL COMMITTEE MEETING AGENDA                                               24 AUGUST 2015


Trevor Lloyd Consulting conducted a Waste Scoping Workshop with Councillors and staff on 11
March 2014.

Following the workshop the consultant was engaged to develop a list of 5 Key Themes for further
investigation. The 5 themes identified were:

   Waste Avoidance
   Organic Waste
   Recycling
   Commercial Waste
   Fees and Charges.

Golder Associates successfully tendered for the contract to investigate the 5 Themes. They
developed a long list of options under the 5 themes for further consideration by Council.

From the long list of options, a short list of options was selected by Council for detailed
examination. Golders completed a comprehensive draft report to Council in November 2014
which included costs for a range of options, particularly organic waste collection and treatment.

The most significant issue identified was how to reduce organic waste to landfill. Any approach to
managing or reducing organic waste disposal has very significant costs which impact on the
whole community.

In response to the Golders report, Council resolved to establish the first Noosa Community Jury
to consider the organic waste issue. (The Golders report provided essential information to
enable staff to prepare the “Noosa Community Jury Organic Waste Information Pack” as a
briefing document to Jury Members.)

Establishment of a Community Jury
A Community Jury was established by Council early in 2015 and asked to examine the question,
“What is the best option for minimising organic waste sent to landfill?” The Jury commenced its
deliberations on 7 February 2015 and met monthly, producing a final report and a series of 9
major recommendations on 24 July 2015. (A copy of the Community Jury Verdict is attached to
this report – refer Attachment 1).

Council has considered a separate report in this round of meetings reviewing the first Community
Jury process.

Previous Council Consideration
The background information supplied in this report gives the significant history of previous
consideration by Council about Organic Waste and the Jury Process.

Finance & Risk

There are significant financial implications and risks for Council associated with implementation
of the Community Jury’s recommendations, which will affect a wide section of the community.

In response to the financial impacts and risks, the recommendations need to be considered
carefully with regard to who will receive the services proposed by the Jury, how they could be
introduced and the timing for their introduction.

The most suitable method of considering the recommendation is to refer them to a Council
Workshop where the details required to implement the recommendations can be considered in
the context of the introduction of the upcoming new waste contract.

                                                                                    Page 4 of 40

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                 24 AUGUST 2015


Consultation

External Consultation - Community & Stakeholder

There was significant interaction between the Manager Waste and Environmental Health and the
Community Jury during the development of the Jury Report and their recommendations to
Council.

The Jury process and the interaction between other Council staff, external consultants, local
governments, residents and businesses have been fully detailed in a separate report to Council’s
Planning and Organisation Committee 18 August 2015. To avoid duplication this process is not
repeated in this report.

Internal Consultation

The Community Engagement Manager was consulted during the preparation of this report.

Departments/Sections Consulted:

X   Community Services                           Planning & Infrastructure
    Disaster Management & Public Order           Building & Plumbing Services
    Waste & Environmental Health x               DA Planning
    Community Facilities                         Strategic Land Use Planning
    Cultural Facilities                          Asset Design & Investigations
                                                 Asset Planning
                                                 Civil Operations
                                                 Environment

X   Executive Office                             Corporate Services
    Community Engagement X                       Finance
    Customer Service                             ICT
    Executive Support                            Procurement & Fleet
    Governance                                   Property & Facilities
    Human Resources                              Revenue Services




                                                                                    Page 5 of 40

Section 6

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                      Page 6 of 40

GENERAL COMMITTEE MEETING AGENDA                 24 AUGUST 2015

          NOOSA COMMUNITY JURY’S VERDICT

                FINDINGS AND RECOMMENDATIONS
                  ON THE BEST WAY TO MINIMISE
                  ORGANIC WASTE TO LANDFILL

                            VERSION 5

                re ee                  Baer eee
          ne  ‘   Pro      oS ae I ‘     tS =a =
         i $ PD nt a   2     eS r 3 es Le 2
           ae:   \as   ey    Sle              i,
          ge  2S eo MOLI      3       i Le
                                bs  ; a Fy |

                                                    Page 6 of 40

Section 7

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                      Page 7 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                           24 AUGUST 2015

                SUMMARY (What are the highlights?)

                A first for Queensland

                Jurors were selected from 3,000 residents on the electoral roll representing a cross section of Noosa’s
                diverse community. The Jury met once a month over six months to reach agreement and prepare this
                verdict. The group toured the Eumundi Road Landfill Site, reviewed 30 submissions and heard
                presentations from community representatives, industry spokespeople and experts in the field of
                waste management.

                A strong case for action
                The Jury considered a range of forces, risks and factors facing Noosa Council and agreed that
                immediate action was required because of:
                ¢   Political and regulatory forces
                ¢   Financial risks to Council and ratepayers
                ¢   The limited life of the Eumundi Road Landfill Site
                ¢   Increasing waste growth
                *   Climate change obligations
                *   National and global trends concerning organic waste management.

                Eight guidelines underpin recommendations
                The Jury agreed on a set of criteria to guide their thinking and urged Noosa Council to adopt eight
                guidelines when considering ways to minimise organic waste going to landfill:
                1.  Minimise cost to ratepayers: Waste management must be self-funded
                2.  Aim high: Actions must match Noosa’s global profile and environmental credentials
                3.  Invest in long term behavioural change: Plan generations ahead to achieve significant benefit
                4.  Look beyond Council’s borders: Apply national and global best practice
                5.  Include domestic residents: Residents must be part of the solution
                6.  Encourage collective action: Centralised organic waste treatment is cost-effective and sustainable
                7.  Recognise community diversity: Help all sectors of the community to participate
                8.  Involve commercial producers: Help large producers to prevent organic waste going to landfill

                Nine recommendations unanimously supported
                The Jury unanimously agreed to urge Council to adopt eight recommendations to minimise organic
                waste going to landfill in Noosa, targeting 100% diversion of organic waste by 2030:
                1.  Expand Noosa’s existing three-bin system in a staged manner to introduce mandatory weekly
                    organics collection for residential areas, with mandatory green waste collection in 2015/16
                2.  Minimise cost to ratepayers with cost increases not to exceed $50 per ratepayer for green waste
                    collection and $70 per ratepayer for full organic waste collection
                3.  Council to move to fortnightly collection of general waste bins in stage 2
                4.  Construct a composting facility at Eumundi Road Landfill Site (or another suitable location)
                5.  Design and implement a grassroots, long-term education and awareness campaign
                6.  Reward excellent waste management to continue positive behavioural change
                7.  Monitor compliance with the new waste collection system
                8.  Ban non-biodegradable plastic bags by 2017
                9.  Direct large producers to target 100% diversion of organic waste from landfill by 2030
                Cover photo: The Noosa Community Jury toured the Eumundi Road Landfill Site in February 2015. The well-managed facility
                and its towering piles of green waste provided jurors with a very real understanding of the scale of the challenge. Jurors

     —__—_—__{                                                2 of 15 pen

                                                                                                                  Page 7 of 40

Section 8

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                      Page 8 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                                            24 AUGUST 2015

                  learned that nearly half of the waste collected in general waste bins was found to be “organic”, a term which includes
                  garden waste, all kitchen scraps, construction timber and, paper and cardboard, Image courtesy of Noosa Council.

                                                                    —   30f15—

                                                                                                                                   Page 8 of 40

Section 9

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                      Page 9 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                       24 AUGUST 2015

               CONTENTS

               WiSIOR cececseescescccssataecucar cay ecaueeeseeT ISON RTRE OLEATE SAN EC ESTEE TERETE NOU
               The Case for Action wees mccosz mie     nenn tera                ee a en           eRe        O
               GUIDE   GS iscssemcumraniennn REAR TO
               Recommendations icscccansecin arena Ea eS                                        Rn          TO
               REFEFENCES oo. ceeececeeeeeeseesecseesecseeseesecseeseesececsecesteaseeeeseieesseseeteeseessetsetsetenettteeeteteettrteieeeeeeen LS

                 r                                                                                       am
                            Cael
                                      es ;
                                     < 0° ee =        Se              7      A                             re
                 ce           yepgik FBP te                   a         cee                           | \ glee
                     -                       <~        a           cS         Ripe        ~               ig
                              al id ge FN                ”    “et OD             <          a   aoe Ss     ae
                3   _         Wee               p  pa      —                                -     a      >. 9 i
                 PTS      NS ee ea                 RS ee                         i OY
               Organic waste represents 60% of household waste and 40% of landfill, producing 70% of Noosa’s greenhouse gas emissions
               ol                 >         .       ~
                      Nt Am                    A     ©                                     ama <.
                   .     ~      a oe           E     i                              lied 1         ae   TS)
                ad                  -                et                             A          Shy
                  A                            |                                   BRS       .ee       “Fie
                 y              Ta              ¥     ,   .                                  .  Ny    ty     ‘
                 A                “a         we                                    5           Ce          Py,
                                               oe                                             a   |         |
               iS                “      Be    i             eS                         Pier                  +
                  =                      Pi          a                                at ae          |      :
                   =                           ps                                    eo ee
                                rd        =>.        :                               a ie        =a be]
                              :                 r                                   A                      i
               The Jury included a plumber, dental assistant, PhD student, retired The Jury received technical presentations from
               horticulturalist, mother of three, farmer, nurse and mathematician experts in waste management
                           <i        \      4  |   j                       an    Qt
                           ee  ie          1         i                            ie                         {
                  ——                 )   iC       Ly..                     i                             N
                            oe he ld i H]       i     y                                                  Aj
                  y   aa          |            a                                     vy
                  a         es                                                                       ds
                                ial                     \  an                                             ~
                   ‘a               |                      (
                      ee           re
                 r)   rT                           .                           oi).
                  ror,                       S's             :
                    )                         N Mf
                    '                         NN                     Nn
                     (                         \}           e        x                        -s
               During a tour of Noosa’s Eumundi Road Landfill Site, jurors were impressed with the well-organised facility

                                                     ef    4of 15 }

                                                                                                             Page 9 of 40

Section 10

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 10 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                         24 AUGUST 2015

               VISION (How did jurors describe Noosa’s perfect future of waste management?)

                Noosa will become a leader in organic waste management, targeting zero
               organic waste to landfill by 2030.
                In 2030, Noosa’s organic waste is no longer sent to landfill. It is too valuable to be wasted. Instead,
                large quantities of nutrient rich material are collected from Noosa’s residents and businesses and
                brought to the award-winning facility at Eumundi Road where it is converted into high-grade
               compost. In our rural areas, residents continue the good work they were doing back in 2015, targeting
                100% of organic waste is reused in home composting facilities and worm farms.

               The Eumundi Road facility was expected to reach the end of its life by 2048, but now it is the hub of a
                profitable new industry for Noosa. The industry employs a large number of people, makes money for
               Council and some of its leaders travel the world sharing their experiences with others.

                It started with an overhaul of Noosa’s waste collection system and the separation of organic waste,
                recyclable waste and inorganic waste into three bins. Today, the Eumundi Road facility produces high
               quality mulch and compost that is independently audited and verified to meet stringent Australian
                standards. The compost is so good that Council has customers lining up to buy its products including
               the National Parks and Wildlife Service and high-end landscapers who are happy to pay a premium.

               The Council has continued education and awareness schemes, awarding prizes and recognition for
               those residents who strive for stringent waste management and reduction.

                Plastic bags are long gone with biodegradable bags now the norm. The local marine life is thriving as a
                result, less waste is thrown on the ground and contamination of bins’ contents is negligible. Noosa’s
                major commercial food outlets and other large producers of organic waste have implemented best
                practice strategies for minimising their waste in consultation with Noosa Council.

               You see, the everyday people of Noosa have really taken to the idea of living in a biosphere reserve
               where waste is a thing of the past. People from all walks of life are happy to demonstrate ways to
                reduce the amount of organic waste they produce. Tourists leave Noosa with a new respect for the
               area; it is not just beautiful — it is sustainable and the people who live and work in Noosa want it to
               stay that way.

                                           Eee               5 of 15 }—___—_________-_

                                                                                                              Page 10 of 40

Section 11

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 11 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                         24 AUGUST 2015

               THE CASE FOR ACTION                    (why do we need to do anything?)

               The following table describes the forces, risks and factors that led the Jury to agree that Noosa
               Council should take action to minimise organic waste going to landfill.

                Political and              The Queensland Waste and Resource Management Strategy’ released in
                                           December 2014 stipulates that Noosa Council must:
                regulatory forces
                                           ¢   Improve its recycling rate to 45% by 2024.
                                           ¢   Reduce the amount of waste going to landfill by 15% by 2024.
                                           Queensland is the only state without a landfill levy after the Newman
                                           Liberal National Party Government repealed it in 2012. A levy could be
                                           reintroduced, especially as the loss of the levy meant a decline in
                                           recycling rates, the loss of jobs and resulted in Queensland becoming an
                                           attractive and cheaper ‘dumping ground’ for rubbish from interstate’”.
                                           The New South Wales levy raises more than $500 million annually,
                                           another incentive for the reintroduction of a waste levy in Queensland’.

                 ‘      ‘    ‘             If the New South Wales waste levy were applied in 2014, Noosa Council
                Financial risks                                                                         ai;   :
                                           would have had to pay the State Government more than $2 million. This
                                           equates to approximately $40-S50 a year per domestic ratepayer’,
                                           Reducing organic waste to landfill will also minimise Noosa Council's
                                           exposure to any future governments’ climate change initiatives, such as a
                                           future carbon tax or other price based carbon regulatory system’.

                Landfill life              The existing Eumundi Landfill Site has a current expected life of 33 years’.
                                           While Noosa Council has land available for future waste disposal, it is
                                           uncertain whether State Government approval can be obtained.
                                           The creation of a new landfill will be expensive for Noosa Council, and
                                           thus probably the ratepayers. The longer the life of the landfill can be
                                           extended, the better. This can be achieved by minimising the amount of
                                           waste that is sent to the landfill.

                                           Food waste has increased in most western societies by around 50% over
               Waste growth                                             .         5            .
                                           the last 10-15 years and this will continue’. The Australian Bureau of
                                           Statistics predicts waste in Australia to grow by 7% to around
                                           130m metric tonnes by 2020, compared with only a 3% increase in
                                           population over the same timeframe’.

                  :                        Organic waste in the Eumundi Landfill Site produces 70% of Council’s
                Climate change                                      ie      :    73
                                           greenhouse gas emissions’. Reducing this will reduce greenhouse gas
                                           production and any associated financial liability for Noosa Council.

                                           Eee               6 of 15 }—___—_________-_

                                                                                                              Page 11 of 40

Section 12

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 12 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                         24 AUGUST 2015

                    .                      Many countries around the world, for example the United Kingdom, have
                National and global                     :                  .     .                       a
                     d                     banned organic waste from landfill and implemented, or are trialling or
               trends                      considering implementing a three bin system”’® in line with the
                                           internationally accepted ‘Hierarchy of Waste Management’.
                                               Heirarchy of waste management          Current Noosa practice
                                                                                  a

                                                  yy                        -          Am
                                                                         Recover
                                                                         energy

                                                           v=

                                           Councils across Australia are embracing three bin systems as the most
                                           cost effective way to minimise organic waste to landfill. The uptake of the
                                           three bin system across Australia is currently increasing with councils in
                                           New South Wales, Victoria, Western Australia and South Australia
                                           changing to the system’.

                                           All Australian States and Territories (except Queensland and Western
                                           Australia) have banned non-biodegradable bags. The Queensland
                                           Government recently announced the intention to investigate waste
                                           reduction, and possibly restrict single use plastic bags’.

                                           eT                7 of 15 Jo

                                                                                                              Page 12 of 40

Section 13

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 13 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                        24 AUGUST 2015

               GUIDELINES (What should be taken into consideration?)

               The Jury agreed ona set of criteria to guide their development of recommendations and urges the
               Council to adopt these eight guidelines when considering ways to minimise organic waste to landfill.

               1. Minimise cost to ratepayers
               The Waste Management Business Unit within Noosa Council must be self-funding’. Revenue
               generated from actions implemented to minimise organic waste to landfill must cover the costs of the
               business as much as possible. The cost of implementing recommendations address long-term
               financial risks, but have a minimal impact on rates.

               2. Aim high
               Noosa Council's response must match Noosa’s “global profile as a special place to live and visit” ’°.
               Noosa is an internationally-acclaimed tourist destination and was the first Queensland town to be
               recognised by UNESCO as a biosphere reserve. Council's response should enhance our environmental
               credentials, increase our appeal as a holiday destination and set us apart from our competitors.
               Council’s response should also be consistent with, and reflected in, the Noosa Plan’.

               3. Invest in long term behavioural change
               Use this opportunity to think generations ahead and plana staged program of actions that delivers
               substantial benefits for our community and the environment. A long-term strategy that encompasses
               technical solutions and behavioural change will allow Noosa to progress towards a future where 100%
               of organic waste is diverted from landfill.

               4. Look beyond our borders
               Look for proven and effective solutions nationally and globally that could be implemented in Noosa.
               Consider national global trends in waste management and potential pending legislation.

               5. Include domestic residents
               Domestic residents produce the majority of organic waste in Noosa‘. To achieve maximum benefit for
               Noosa Council, recommendations must involve residents and encourage lasting behavioural change.

               6. Encourage collective action
               Previous initiatives in Noosa involving home composting and worm farms were initially successful, but
               have proven to be unsustainable over time (e.g. Veggie Village Community Garden in Peregian Beach).
               Collective action with centralised treatment of organic waste has been found to be more cost-
               effective and sustainable in comparable communities (e.g. Bunbury and Lismore Councils).

               7. Recognise community diversity
               To be successful, any change in Noosa Council policies needs to encourage all sectors of the
               community to participate. Council’s response should acknowledge the special needs of the diverse
               Noosa community, including tourists, nappy users, rural residents, high-density accommodation and
               commercial businesses. These groups will need help to participate successfully and solutions should
               be tailored to the different groups’.

              8.   Involve commercial producers
               Although domestic residents produce the majority of organic waste in Noosa, it is important to ensure
               that large commercial producers and any future developments are designed to aim for zero organic
               waste to landfill.

              wo              ef                            8 of 15 pene

                                                                                                            Page 13 of 40

Section 14

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 14 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                      24 AUGUST 2015

               RECOMMENDATIONS (How should Noosa minimise organic waste to landfill?)

               The Jury came to the conclusion that a centralised approach would be the most cost-effective way to
               achieve behavioural change that results in rapid and significant diversion of organic waste from
               landfill. The Jury unanimously agreed on nine recommendations, as described below:

               1.  Expand Noosa’s existing three-bin system in a staged manner to introduce
                   mandatory weekly collection of organics in all residential areas.
                   Mandatory collection of green waste to start in the 2015/16 financial
                   year, with collection of all organics to be introduced as soon as possible
                   thereafter. Rural areas should be exempted with the ability to opt-in.
               Noosa Council should expand its existing three-bin waste collection system as follows:

                   Mandatory green-topped bins
                   ¢   Make existing green-topped bins compulsory for all dwellings constructed or purchased in
                       Noosa’s urban areas before 2017 and ensure all major development applications include
                       plans for minimising organic waste to landfill.
                   ¢   Make green-topped bins compulsory for ALL Noosa residents in urban areas in 2015/16.

                   Green-topped bins to take ALL organics
                   ¢   Allow green-topped bins to take ALL organic matter, not only garden waste, as soon as
                       possible after the introduction of mandatory green waste collection .
                   ¢   Ensure the maximum amount of organic waste can be placed in green-topped bins including:
                       -   Fruit and vegetable scraps (including onion and citrus fruits)
                       -   Meat and fish (including bones and egg shells)
                       —   Pasta, cereals, bread and rice
                       -   Dairy products
                       -  Coffee grinds and tea bags
                       -  Soiled paper and cardboard (including tissues, paper towel and pizza boxes)
                       -  Animal droppings
                       -  Grass clippings and leaves
                       —   Pruned garden waste, twigs and small branches
                   ¢   Provide all residents who have a green-topped organics bin with a complimentary kitchen
                       caddy and an annual supply of biodegradable bags.
                   ¢   Encourage major supermarkets to stock biodegradable bags.

                   Monitor the need for general waste bins
                   Council should monitor the use of general waste bins. If the use of red-topped general waste bins
                   decreases so much that it becomes uneconomical, Council should phase out the general waste
                   collection service and move to a two-bin system (ie green-topped bins for organics and yellow-
                   topped bins for inorganic material). This is considered to be best practice in international waste
                   management.

               BENEFITS
               *   Reducing organic waste to landfill, answering the question put to the Jury
               ¢   Producing saleable products
               *   Reduces total greenhouse gas emissions in Noosa

              wo             a                             9 of 15 pene

                                                                                                           Page 14 of 40

Section 15

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 15 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                    24 AUGUST 2015

               ¢  Aligns Noosa with National trends towards collection of organic waste, with FOGO systems
                   adopted by 29 councils in NSW, 30 councils in Victoria and many councils in Adelaide.

               2. The Jury recommends that the Council stage the cost to ratepayers and
                  ensure the total increase in cost does not exceed $50 per ratepayer for
                  the introduction of green waste collection and $70 per ratepayer for the
                  collection of all organics. Council must look to minimise the cost to
                   ratepayers by off-setting costs through the sale of compost.
                   BENEFITS
                   ¢ = Affordability

               3. Council to move to fortnightly collection of general waste bins once full
                  organic collection is introduced
                  The volume of waste collected in general waste bins is expected to reduce significantly once
                  organic matter is removed from the waste destined for landfill. Because of this, Noosa Council
                   should reduce the frequency of collection for general waste bins from weekly to fortnightly.
                   Unfortunately, collection of general waste is a regulated activity in Queensland. The Jury
                   recommends that Noosa Council request a legislative amendment from the Queensland
                   Government so that it can adopt fortnightly collection of general waste.
                   BENEFITS
                   ¢  Alignment with best practice
                   ¢  Reduction of costs
                   *  Establishing a routine for the introduction of weekly organic collection

               4. Construct a composting system at the Eumundi Road Landfill Site (or
                  another suitable site) that is best suited to Noosa Council, following an
                   independent cost-benefit analysis
                  The Jury urges Noosa Council to select an efficient technical solution for processing organic waste
                   in a way that is cost-effective and results in minimal methane production. The solution must also
                   produce high quality, marketable compost that can be sold for a higher price. The Jury notes that
                   MRA Consulting has offered to conduct a cost benefit analysis of available technologies for a
                   reduced fee.

                   Independent experts to certify quality
                  Council should obtain independent certification of compost produced at the Eumundi facility (or
                  another suitable site) to ensure it meets Australian standards. To achieve this, Council should
                   implement, monitor and refine an auditing system with samples regularly tested for quality.

                  Council to secure customers
                   Noosa Council should contact commercial compost retailers to identify potential markets and
                   secure customers for its mulch and compost before weekly organics collection begins. Foundation
                  customers should include Noosa Council and the National Parks and Wildlife Service who have an
                  enormous need for high quality compost in their respective operations.
                   BENEFITS

              wo             a                            10 of 15 pene

                                                                                                         Page 15 of 40

Section 16

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 16 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                         24 AUGUST 2015

                   *   Reduction in greenhouse gas emissions by the composting of all organic matter
                   *   Better solution for organic waste disposal
                   ¢   Successful operation demonstrated at Fraser Coast and other councils including Timaru
                       Council in New Zealand
               5.   Design and implement a grass-roots, long-term education and awareness
                   campaign to help Noosa residents understand the benefits of waste
                   minimisation and use their bins correctly

                   Council’s education and awareness campaign should be rolled out across the Noosa community
                   over several years and well ahead of the start of weekly organics collection. The long lead time
                   and multi-year duration of the campaign are crucial to ensure broad scale community acceptance
                   and behavioural change.
                   The campaign should explain:
                   ¢   The long-term benefits of reducing all waste, but particularly organic waste
                   ¢   The costs and challenges of the current volume of organic waste sent to landfill
                   ¢   What will be collected in the green bins in two separate stages: green waste initially and then
                       the collection of food and other organic matter
                   *   Correct bin usage for all three bins, including universal symbols, pictures and warnings about
                       contamination caused by plastic bags
                   ¢   The end product and process of the organic waste recycling.

                   Learn from successful programs
                   In developing its campaign, Noosa Council should learn from successful campaigns around
                   Australia that have achieved behavioural change in waste management with minimal fuss, such as
                   Lismore City Council and Bunbury’” City Council. Citizens from these councils told the Jury they
                   were very happy with the education and awareness campaigns associated with the introduction
                   of organics collection. The award-winning Bunbury program, in particular, was praised because of
                   its focus on face-to-face interactions with residents at a grass roots level.
                   Features of successful campaigns include:
                   ¢   Frequent interaction with lots of repetition
                   ¢   Personalised letters from council to residents
                   ¢   Easy to read posters, brochures and websites with lots of graphics, such as those produced by
                       Lismore City Council’
                   ¢   Staffed displays at local shopping centres and community events to encourage conversation
                   ¢   Advertisements in local newspapers
                   ¢   Anopen day at the landfill with tours of the facility

                   Be up front with citizens about costs and benefits
                   Council should clearly explain the costs and benefits of taking action to minimise organic waste.
                   Research has shown that citizens often overestimate costs because they do not know how much
                   waste management costs. As a result, they are more sensitive to price changes than if they had a
                   more accurate estimation’. Research has also shown that citizens will comply with new systems if
                   the importance is explained to them, they are satisfied the organic waste is being treated
                   appropriately and they will benefit financially in the long run’.
                   BENEFITS
                   *   Changes behaviour
                   ¢   Informs the community and increases acceptance

               wo             ef 11 of 15 pene

                                                                                                              Page 16 of 40

Section 17

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 17 of 40

GENERAL COMMITTEE MEETING AGENDA                                 24 AUGUST 2015

                                     12 of 15

                                                                    Page 17 of 40

Section 18

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 18 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                        24 AUGUST 2015

               6.  Promote positive behavioural change and reward excellent waste
                   management
                   Council should highlight excellent waste management by recognising individuals, streets, groups
                   or businesses with an annual prize or awards program.
                   Community engagement campaigns are also recommended to identify, encourage and celebrate
                   behavioural change and good practice by community members.
                   Give Noosa residents free mulch and four green waste dumping days a year
                   Noosa Council should reward residents to offset the extra cost they will incur with the
                   introduction of compulsory organics collection. This could include free mulch and free dumping of
                   uncontaminated green waste four times a year at the Eumundi Road Landfill (or another suitable
                   location), similar to Lismore City Council’s “Tip Free Days”"’
                   Tax residents from other areas for general waste only
                   Council should apply a higher surcharge to residents from other local government areas that
                   dump general waste at the Eumundi Road Landfill (and all Noosa transfer stations) to help offset
                   the costs of community engagement, education and awareness campaigns.
                   19 jurors support a levy on general waste only.
                   2 jurors support a levy on general and green waste
                   2 jurors do not support a levy
                   BENEFITS
                   * ~~ Reduces illegal dumping
                   ¢ — Minimises waste to landfill
                   ¢   Increases revenue and makes additional waste levy more palatable
                   *   Encourages people to come for mulch
                   *   Keeps waste management top of mind and encourages a culture of waste minimisation

               7.  Monitor and enforce compliance with the new waste collection system
                   Noosa Council should follow the successful monitoring and compliance model implemented by
                   Bunbury City Council. The education campaign should clearly explain the process and the
                   consequences for households that repeatedly contaminate their recycling or organic bins.
                   Once weekly organics collection is established, the green-topped organic bins should be checked
                   for contamination. Households that contaminate their bins should be sent a polite letter
                   explaining how they have not complied. If the contamination continues, or if it cannot reasonably
                   be assumed to be accidental, then a more stern letter should be sent along with a brochure
                   outlining what goes in each bin and explaining why it is important.
                   If contamination continues to occur, then the household’s bin should be collected by Council and
                   modified to identify it as a serial offender with the cost charged to the household.
                   Bunbury City Council used this simple approach and only two households had their bins removed.

                   BENEFITS
                   ¢   Ensures quality of the system
                   *   Encourages household participation and compliance with the rules
                   *   Saves operational costs

              wo              ef 13 of 15 pene

                                                                                                            Page 18 of 40

Section 19

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 19 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                         24 AUGUST 2015

               8.   Ban non-biodegradable plastic bags by 2017
                   Noosa Council should phase out the sale and use of non-biodegradable plastic bags in Noosa,
                   working closely with retailers to “ban the bag”.
                   The Jury felt the recommendation was an important way to minimise contamination of organic
                   waste and raise the profile of the organic collection service.
                   The Jury noted a national trend, with half of Australia’s State’s and Territories already outlawing
                   plastic bags. In 2009, the South Australian Government was the first in Australia to ban single-use,
                   lightweight plastic bags. The Northern Territory and Australian Capital Territory followed in 2011
                   and Tasmania passed legislation to ban plastic bags in 2013.
                   In February 2015, the Greens announced plans to ban plastic bags in New South Wales” and in
                   June 2015 the Queensland Government announced it would consider the move’
                   BENEFITS
                   *   Council acknowledges that bags are a big problem for Noosa
                   *   Consistent with national trends
                   ¢   Minimises contamination to ensure high quality products

               9.   Direct commercial food outlets, supermarkets, schools, hospitals, nursing
                   homes and other large producers of organic waste to target zero organic
                   waste to landfill by 2030
                   Residents should not be the only part of the community to be encouraged to divert organic
                   matter from landfill. Council should work closely with large producers of organic waste to help
                   them establish systems that ensure organic waste is diverted from landfill, including performance
                   indicators to demonstrate progress towards targets.
                   This could include:
                   ¢ — linking organic waste management to the assessment process for future development
                       approvals
                   ¢   facilitating partnerships between organic waste producers and organisations (such as
                       secondbite.org) that distribute food to community groups and other end users such as
                       farmers
                   *   onsite composting facilities for individual businesses or co-located businesses
                   If these groups are unwilling to participate, Council should investigate whether by-laws can be
                   passed to ensure their organic waste is reduced.
                   BENEFITS
                   *   Diverts large amounts of organic waste from landfill
                   ¢   Sets equal expectations on commercial and residential community members
                   ¢   Provides food for our community’s most vulnerable residents

               wo             ef 14 of 15 pene

                                                                                                              Page 19 of 40

Section 20

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 20 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                       24 AUGUST 2015

               REFERENCES

               * Queensland Government 2014, ‘Waste—Everyone’s responsibility: Queensland Waste Avoidance
               and Resource Productivity Strategy (2014—2024)’, Department of Environment and Heritage
               Protection, Queensland Government, December, accessed 12 June 2015.
               https://www.ehp.qld.gov.au/waste/pdf/qld-waste-strategy. pdf
               2 McKenny, L 2012, ‘No Levy Makes Queensland a Tempting Dump’, The Sydney Morning Herald, 12
               June, accessed 12 June 2015.
               http://www.smh.com.au/national/no-levy-makes-queensland-a-tempting-dump-20120611-
               205xp.html
               3 MRA Consulting 2015, ‘The State of Waste 2015 the Tipping Point’, MRA Consulting, 10 March,
               accessed 12 June 2015.
               http://blog.mraconsulting.com.au/2015/03/10/the-state-of-waste-2015/

               4 Community Jury Information Pack 2015, Noosa Shire Council, Australia.

               3 Refsgaard, K & Magnussen, K 2008, ‘Household Behavior and Attitudes with Respect to Recycling
               Food Waste- Experiences from Focus Groups’, Journal of Environmental Management, 90, p.760-771.
               ® MRA Consulting 2015b, presentation by MRA Consulting to the Noosa Community Jury, 6 May.

               7 Noosa Climate Action Plan 2012, Noosa Biosphere Ltd, accessed 12 June 2012.
               http://www.noosabiosphere.org.au/_literature_100816/Noosa_Climate_Action_Plan

               . Fahy, F, & Davies, A 2007, 'Home Improvements: Household Waste Minimisation and Action
               Research’, Resources, Conservation & Recycling, 52, pp. 13-27.

               ° The State of Queensland (Department of the Premier and Cabinet) 2015, ‘Queensland Government
               to Investigate Options to Reduce Packaging Waste’, Queensland Government, 20 May, accessed 12
               June 2015.
               http://statements.qld.gov.au/Statement/2015/5/20/queensland-government-to-investigate-options-
               to-reduce-packaging-waste

               1° Noosa Biosphere LTD 2015, ‘UNESCO Man and the Biosphere’ Noosa Biosphere, accessed 12 June
               2015. http://www.noosabiosphere.org.au/facts-vision/organisation/unesco

               11 Noosa Shire Council 2013, ‘The Noosa Plan’, Noosa Shire Council, 16 September, accessed 12 June
               2015. http://www.noosa.qld.gov.au/the-noosa-plan

               2 Bunbury City Council 2014, Winning, award nomination for the Waste Authority Infinity Awards
               entitled ‘Third Bin Bunbury and Capel’, 13 July.
               13 | ismore City Council, ‘The Recycling Revolution: A Guide to Recycling Right’ Lismore City Council,
               accessed 23 June 2015.
               http://issuu.com/lismorecitycouncil/docs/lismore_city_council_recycling_guid?e=7144101/9892795
               14 The Greens 2015, ‘Greens move to ban plastic bags in NSW’, 3 February, accessed 23 June 2015.
               http://greens.org.au/node/7065

                eo                                         15 of 15 } ~~

                                                                                                           Page 20 of 40

Section 21

GENERAL COMMITTEE MEETING AGENDA                                                             24 AUGUST 2015


2                        WHOLE OF SHIRE FORWARD PLANNING DESIGN PROGRAM - FURTHER REPORT
DOCUMENT INFORM AT ION




Author                           Acting Design Services Team Leader, Craig Eldridge
                                 Planning & Infrastructure Department

Index                            ECM/Subject/45.15 Traffic & Transport
                                 ECM/Subject/45.12 Roads
                                 ECM/59.04 Commercial Bus Routes/Bus Stops/Bus Shelters

Attachments                      Nil


EXECUTIVE SUMMARY
In order to deliver an effective and efficient capital program, it is important to have “shovel ready”
designs prepared prior to works commencing on the ground. The benefit of this principle is that it
will result in projects not having to be planned, surveyed, designed and delivered in one financial
year. Planning, surveying and designing projects ahead of time will allow for better on-time
delivery in the following financial years, reducing overall risks to Council.

RECOMMENDATION
That Council note the report by the Acting Design Services Team Leader to the Infrastructure
and Services Committee Meeting dated 18 August 2015 and the Further Report to the General
Committee Meeting dated 24 August 2015 and approve the proposed forward planning project
allocations for the 2015/2016 Whole of Shire Forward Planning & Design Program.


REPORT
A report on the Whole of Shire Forward Planning & Design Program was presented to the
Infrastructure and Services Committee on the 18 August 2014. At this meeting, the Councillors
requested a further report be presented to the General Committee on 24 August 2015 with
additional information on the proposed projects to be funded from the 2015/2016 Whole of Shire
Forward Planning & Design Program to enable “shovel ready” designs to be completed ahead of
time for future capital works.

A total allocation of $300,000 has been provided in the Whole of Shire Forward Planning &
Design Program.

It is proposed that this funding be allocated on the following basis:


Project                                          Budget        Summary
                                                               Revision of existing design to look at ways of
Coastal Bus Shelter Design                       $10,000       reducing the overall base cost for approved
                                                               program.


Rural Bus Shelter Design                         $10,000       Delivery of rural prototype including manufacture
                                                               for approved program.


2016/2017 PTAIP Bus Stop                         $20,000       Scoping for 2016/2017 programme grant
Disability Upgrade Program                                     application.




                                                                                                 Page 21 of 40

Section 22

GENERAL COMMITTEE MEETING AGENDA                                              24 AUGUST 2015



Ernest St, Goodchap St, Hilton Tce,   $50,000   This intersection has been identified as the
Noosaville intersection                         Priority 1 intersection recommended for
                                                upgrading from the Draft Traffic Study. (Detailed
                                                analysis of the intersection upgrade
                                                requirements will be presented at the traffic
                                                workshop in early September 2015)


Poinciana Ave, Moorindil St,          $50,000   This intersection has been identified as the
Tewantin intersection                           Priority 2 intersection recommended for
                                                upgrading from the Draft Traffic Study. (Detailed
                                                analysis of the intersection upgrade
                                                requirements will be presented at the traffic
                                                workshop in early September 2015)


Main Beach Boardwalk, Noosa           $40,000   $500,000 was allocated in the 2014/2015 capital
Heads                                           works programme for construction of the
                                                “missing link” section of boardwalk between the
                                                Noosa Heads Surf Club and Park Road (90
                                                metres). These funds have since been
                                                reallocated to the 2016/2017 forward
                                                programme and adjusted to $700,000.

                                                The current design is a timber boardwalk at
                                                ground surface level. Based on feedback and
                                                lessons learnt from previous stages it is being
                                                asked whether this is the most appropriate
                                                design considering the whole of life costs.

                                                It is proposed to review the current design and
                                                look at modifying it to concrete surfacing with
                                                feature and build out sections constructed of
                                                timber boardwalk. This may involve engaging
                                                structural consultants to revise design drawings,
                                                cost estimates and structural details in
                                                collaboration with Council’s Design Team.


Lake Weyba Dr Noosaville              $20,000   Planning & preliminary design for proposed bus
                                                turnaround facilities. (A letter has been sent to
                                                TransLink from CEO seeking joint funding)


Pomona Precinct                       $20,000   Pedestrian linkages planning for town centre
                                                required to match future program.


Cooroy Town Centre                    $10,000   Pedestrian linkages planning for town centre
                                                required to match future program.


Tewantin Bypass, Beckmans Rd          $10,000   Concept, planning and preliminary design for
Noosaville                                      duplication and intersection upgrade to reinforce
                                                Council’s technical position with DTMR and to
                                                drive successful outcome.


Myall St/Elm St Cooroy intersection   $10,000   Concept, planning and preliminary design for
                                                duplication and intersection upgrade to reinforce
                                                Council’s technical position with DTMR and to
                                                drive successful outcome.


                                                                                  Page 22 of 40

Section 23

GENERAL COMMITTEE MEETING AGENDA                                                           24 AUGUST 2015



David Low Way Castaways Beach               $20,000         Planning, survey and preliminary design for car
car park                                                    parking, pedestrian and bus stop safety
                                                            improvements. As a result of recent traffic
                                                            accidents this project has been identified as a
                                                            priority location for Black Spot safety upgrading.
                                                            This investigation and preliminary design is
                                                            required to support a Black Spot funding
                                                            application for 2016/2017.


Station Rd Pomona School                    $20,000         Planning, survey and preliminary design for car
                                                            parking, pedestrian and bus turnaround safety
                                                            improvements as identified following CRM
                                                            requests and to match 2016/2017 programme.


James St Cooran                             $10,000         Planning for Cooran School pathways upgrade
                                                            as identified following CRM requests and to
                                                            match 2016/2017 programme.


Ongoing progress monitoring will be provided for these renewal and upgrade design projects
through the Capital Delivery Program quarterly reporting.

Previous Council Consideration

Capital Works Program 2015/16 adopted at Council’s Special Meeting on Monday, 29 June
2015.

Whole of Shire Forward Planning & Design Program presented at the Infrastructure & Services
Committee meeting on Tuesday, 18 August 2015.

Finance & Risk

Creation of financial efficiencies by reducing lead times.
Reduce delivery risks by designing projects ahead of delivery program.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Departments/Sections Consulted:
       Community Services                             x   Planning & Infrastructure
       Disaster Management & Public Order                 Building & Plumbing Services
       Waste & Environmental Health                       DA Planning
       Community Facilities                               Strategic Land Use Planning
       Cultural Facilities                            x   Asset Design & Investigations
                                                      x   Asset Planning
                                                          Civil Operations
                                                          Environment

       Executive Office                               x   Corporate Services
       Community Engagement                           x   Finance
       Customer Service                                   ICT
       Executive Support                                  Procurement & Fleet
       Governance                                         Property & Facilities
       Human Resources                                    Revenue Services

                                                                                               Page 23 of 40

Section 24

GENERAL COMMITTEE MEETING AGENDA                                                                    24 AUGUST 2015


3                        DEVELOPMENT APPLICATION FOR                   OPERATIONAL          WORKS   FOR    SIGNAGE
                         OPW15/0118 - FURTHER REPORT
DOCUMENT INFORM AT ION




Author                              Development Planner, Glen Conforti
                                    Planning & Infrastructure Department

Index                               ECM / Application / OPW15/0118

Attachments                         Nil


RECOMMENDATION
That Council note the report by the Development Planner to the Planning and Organisation
Committee dated 18 August 2015 and the Further Report to the General Committee Meeting
dated 24 August 2015 and refuse Application No. OPW15/0118 for a Development Permit for
Operational Works (Signage), situated at 25 Hastings Street, Noosa Heads for the following
reasons:
1.                       The proposed signage is inconsistent with the overall outcomes sought by The Noosa
                         Plan’s Advertising Devices Code, because it:
                         a.   involves a sign exceeding the maximum sign face area for a single sign;
                         b.   involves a total sign face area exceeding the Code’s limit;
                         c.   will result in a proliferation of signage and visual clutter; and
                         d.   involves signage that detracts from the desirable characteristics of Hastings Street.
2.                       The proposed signage will adversely impact on the character and amenity of Hastings
                         Street.


FURTHER REPORT
1.                       BACKGROUND

A report on this application was considered by the Planning and Organisation Committee on 18
August 2015 as Item 3 on page 20 and was subsequently referred to the General Committee for
further information. During the course of discussions at the Planning and Infrastructure meeting,
Councillors raised concerns around the definition of advertising device including the definition of
a wall and window sign.

2.                       An Advertising Device

The Advertising Devices Code currently does not regulate sign content. This means the sign may
contain either content for advertising a business or a product sold by or within the business
premises.

The Advertising Code does not provide an overarching definition for an advertising device per se.
The Advertising Devices Code provides a definition for different classes of advertising devices.
For example, some classes of signs are a Hamper sign, Window sign and Wall sign. Figure 1
below visually depicts the above mentioned classes of signs.




                                                                                                       Page 24 of 40

Section 25

GENERAL COMMITTEE MEETING AGENDA                                                  24 AUGUST 2015




Figure 1 – Definition of individual classes of signs and reference images.

Wall and Window Signs

The proposed display boxes affixed to the stairwell is considered a Wall Sign and the display
boxes adjacent to the entry is considered a Window Sign in accordance with the relevant sign
class definition shown above in Figure 1.

The Macquarie Dictionary states that signage is

“An inscribed board, space, etc., serving for information, advertisement, warning, etc., on a
building, along a street, or the like.’

The display boxes are considered signage as they are advertising, framed, have borders,
architectural trims, are displayed and affixed to a structure, as distinct from a mannequin/clothing
display visible in a shop front. This type of goods displayed for sale visible in a shop front window
is a form of advertising but it is not signage.

                                                                                     Page 25 of 40

Section 26

GENERAL COMMITTEE MEETING AGENDA                                                  24 AUGUST 2015


3.   Sign face
The definition of sign face area is provided below:

Sign face area means—
a)    the area of the smallest rectangle that can wholly contain the advertising device, inclusive
      of any decorative lines, stripes, borders and architectural trims that immediately surround
      the device;

Figure 2 below shows an architectural rendering of the proposed signage, annotated to show the
elements that are included in the sign face area in accordance with the definition.




Figure 2 – Sign face area

Conclusion

The display boxes affixed to the stairwell are a wall sign and the display boxes adjacent to the
entry are a window sign, in accordance with the relevant definition in the Advertising Devices
Code. All proposed signs have clear borders and/or architectural trims and advertise a business
or product. The Advertising Devices Code does not assess the content of the advertising device
only the class of sign. Given the large sign face area of the wall sign (9m²) and the total sign face
area (all signs combined) proposed, the signs do not meet the Outcomes sought by the
Advertising Devices Code and are recommended for refusal.



                                                                                     Page 26 of 40

Section 27

GENERAL COMMITTEE MEETING AGENDA                                            24 AUGUST 2015


Departments/Sections Consulted:

   Community Services                   X   Planning & Infrastructure
   Disaster Management & Public Order       Building & Plumbing Services
   Waste & Environmental Health             DA Planning
   Community Facilities                     Strategic Land Use Planning
   Cultural Facilities                      Asset Design & Investigations
                                            Asset Planning
                                            Civil Operations
                                            Environment

   Executive Office                         Corporate Services
   Community Engagement                     Finance
   Customer Service                         ICT
   Executive Support                        Procurement & Fleet
   Governance                               Property & Facilities
   Human Resources                          Revenue Services




                                                                              Page 27 of 40

Section 28

GENERAL COMMITTEE MEETING AGENDA                                                        24 AUGUST 2015


4                        BUDGET REVIEW FOR 2014/15 CARRYOVER EXPENDITURE
DOCUMENT INFORM AT ION




Author                             Manager Financial Services, Wayne Jensen
                                   Corporate Services Department

Index                              7.09 – 2015/2016 Budget

Attachments                        1.   Proposed Carryover Requests – Operating and Capital
                                   2.   Revised Budget Financial Statements


EXECUTIVE SUMMARY
The Local Government Act 2009 and Regulations require Council to undertake regular reviews of
the adopted budget to ensure it remains reflective of planned activities to be funded through the
budget period. At the close of each financial year, any uncompleted projects are considered for
possible carryover into the subsequent budget year.

RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 24 August 2015 and approve the requested changes to the budget for the 2015/16
financial year as outlined in the attached Revised Budget Financial Statements.


REPORT
The Local Government Regulation 2012, at section 170(3) allows Council, by resolution, to
amend the budget for a financial year at any time before the end of the financial year.

Along with regular quarterly reviews of the adopted budget, in October, January and April of each
year, a full review of uncompleted projects is undertaken in July to consider the carryover of
these projects into the following budget year. To qualify for consideration, there must be an
operating surplus, and there must also be sufficient funds from the original project budget to
complete the works in the new financial year.

Generally, there is no carryover of operational funding unless there is a contractual obligation;
specific funding from operational grants; or a Council resolution.

1.                       Operating Carryovers Proposed

Attachment 1 shows all of the proposed carryovers, and includes $257,332 in operational
carryovers. This includes projects funded from operational grants; identified in specific Council
resolutions; and projects funded from constrained cash on hand.

2.                       Capital Project Carryovers Proposed

There is a total of $8,059,208 in proposed capital project carryovers, relating to 46 individual
projects, some of which are eligible for grant funding ($968,722). Attachment 1 provides a
detailed explanation as to the reasons why these projects were not completed and / or the extent
of works to be undertaken.




                                                                                              Page 28 of 40

Section 29

GENERAL COMMITTEE MEETING AGENDA                                                   24 AUGUST 2015


Previous Council Consideration

There were changes made to the original 2014/15 budget by resolution at the Ordinary Meeting
held 2 July 2015, following consideration at the Planning & Organisation Committee held 23 June
2015.

Finance & Risk

Operating carryovers will impact on the operational budget through the inclusion of expenditure
($257,332) without any additional revenue, with the funds having been received during the
2014/15 financial year.

Capital carryovers do not impact on the operating position, and nor will they have any significant
impact on the forecast financial position, as the projects were initially anticipated to be complete
by 30 June 2015.

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

Management accountants have been in contact with all areas of Council.

Departments/Sections Consulted:

x     Community Services                       x   Planning & Infrastructure
      Disaster Management & Public Order           Building & Plumbing Services
      Waste & Environmental Health                 DA Planning
      Community Facilities                         Strategic Land Use Planning
      Cultural Facilities                          Asset Design & Investigations
                                                   Asset Planning
                                                   Civil Operations
                                                   Environment

x     Executive Office                         x   Corporate Services
      Community Engagement                         Finance
      Customer Service                             ICT
      Executive Support                            Procurement & Fleet
      Governance                                   Property & Facilities
      Human Resources                              Revenue Services




                                                                                     Page 29 of 40

Section 30

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 30 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                                                          24 AUGUST 2015

   Capital / Operating                        Operating

   Sum of Proposed Budget Carryover                                                                                                                                                                                     Revenue / Expense
   Financial Statement Description            Branch                                                Cost Centre / Project Description                  Details                                                         Expense                   Grand Total
       Materials & Services                      Community Facilities                                  Noosa Community Care Branding                    There has been a delay in rebranding the Respite Centre due to a                44,760        44,760
                                                                                                                                                        naming conflict. It has now been decided to change the name to
                                                                                                                                                        Noosa Community Support and proceed to develop a new website,
                                                                                                                                                        brochures, signage, and other marketing material in 2015/16.
                                                                                                    Noosa Community Care Branding Total                                                                                                 44,760        44,760
                                              Community Facilities Total                                                                                                                                                                44,760        44,760
                                                  Executive Manager                                    Noosa Biosphere Reserve                          This amount was provided for in the Council approved Funding                    40,000        40,000
                                                                                                                                                        Agreement to cover "start up operational expenses" for the
                                                                                                                                                        Biosphere Foundation Ltd. The Agreement was not approved by
                                                                                                                                                        Council until May, 2014 so to avoid the requirement for the
                                                                                                                                                        Foundation to prepare audited financial statements for 2014/15, the
                                                                                                                                                        payment was delayed until after 1 July 2015.
                                                                                                    Noosa Biosphere Reserve Total                                                                                                       40,000        40,000
                                              Executive Manager Total                                                                                                                                                                   40,000        40,000
                                                  Libraries and Galleries                              Best Start - a family literacy initiative for Queensland Carry over of unspent funds from State Library funded Best Start        46,410        46,410
                                                                                                                                                        program - now renamed First Five Forever. Funding received in
                                                                                                                                                        2014/15 for program delivery in 2015/16
                                                                                                    Best Start - a family literacy initiative for Queensland Total                                                                      46,410        46,410
                                                                                                       Dollars Making Sense                             Carry over of unexpended grant funded project. Funding received in                7,177        7,177
                                                                                                                                                        2014/15 for project delivery through to end of 2016
                                                                                                    Dollars Making Sense Total                                                                                                            7,177        7177
                                                                                                       Floating Land                                    Multi-year project initiative from 2014/15 for delivery of Floating Land         16,950       16,950
                                                                                                                                                        event Aug - October 2015
                                                                                                    Floating Land Total                                                                                                                  16,950       16,950
                                                                                                       Floating Land Biosphere                          Completion of externally funded Biosphere Floating Land artist-in-                  237          237
                                                                                                                                                        residents schools component. For delivery in Aug - Oct 2015
                                                                                                    Floating Land Biosphere Total                                                                                                           237          237
                                                                                                       Noosa War Front                                  Carry over of unexpended grant funded project. Funding received in                5,032        5,032
                                                                                                                                                        2014/15 for project delivery through to end of 2015
                                                                                                    Noosa War Front Total                                                                                                                 5,032        5,032
                                                                                                       Noosa War Front Pinned                           Carry over of grant received in late June 2015 for project to be                  9,091        9,091
                                                                                                                                                        conducted in 2015/16
                                                                                                    Noosa War Front Pinned Total                                                                                                          9,091        9,091
                                              Libraries and Galleries Total                                                                                                                                                              84,897       84,897
                                                 Community Development                                 Community Development                            Remaining project funds yet to be claimed by the club.                           19,362       19,362
                                                                                                                                                        Recommendation to Council on the 7th May 2015 A. Agree to adopt
                                                                                                                                                        option A as set out in the report as its preferred option to assist the
                                                                                                                                                        Pomona Cooran Rugby League Club Inc. to meet the project funding
                                                                                                                                                        shortfall to install new competition lights; and B. Refer the additional
                                                                                                                                                        funding required to the next Quarterly Budget Review.

                                                                                                    Community Development Total                                                                                                          19,362       19,362
                                                                                                       Noosa Drought Support Program                    Funding received from the State in late June 2015. Expediture yet to            40,000        40,000
                                                                                                                                                        occur. Funding is to strengthen the resiliance of affected farmers in
                                                                                                                                                        the Noosa Shire. Purchase order in place for expediture of funds.

                                                                                                    Noosa Drought Support Program Total                                                                                                 40,000        40,000
                                                                                                       Regional Arts Development Fund (RADF)            Funded by both grant from Arts Qld - $25,000 and Council general                 28,313       28,313
                                                                                                                                                        rates $25,000. $18,264 includes RADF approved applicants yet to
                                                                                                                                                        be paid, $7,500 Floating Land 2015 Boreen Point Activities and
                                                                                                                                                        $2,549 for training (as per Council report 4th June 2015)
                                                                                                    Regional Arts Development Fund (RADF) Total                                                                                         28,313        28,313
                                              Community Development Total                                                                                                                                                               87,675        87,675
   Materials & Services Total                                                                                                                                                                                                          257,332       257,332
   Grand Total                                                                                                                                                                                                                         257,332       257,332

                                                                                                                                                 Page 30 of 40

Section 31

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 31 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                                                      24 AUGUST 2015

      Capital / Operating                   Capital

      Sum of Proposed Budget Carryover                                                                                                                                     Revenue / Expense
      CAPEX PROGRAM                         Cost Centre / Project Description                              Details                                                          Expense                 Revenue                 Grand Total
         Bridges                               Noosa Parade Munna Point Bridge - Investigations and interir Project commenced and was delayed due to late announcement of                     -                                      -
                                                                                                            Grant Application.
                                               Noosaville - Munna Point Bridge Stage 2                      In progress. Contractor engaged. This project will also have $205k          1,509,774                              1,509,774
                                                                                                            TIDS funding allocated.
      Bridges Total                                                                                                                                                                     1,509,774                              1,509,774
        Coastal Canals and Waterways          Gympie Terrace and William Street Revetment wall and pathwa Delays incurred with asset ownership, tenure and approvals.                         -                                      -
                                               Munna Point Foreshore Stabilisation                          State Permits have held this project up, Project commenced 28/7/15             49,028                                49,028

                                               Noosa River Flood Mitigation Strategy                        the development of this strategy document is underway and is being             39,184                                 39,184
                                                                                                            prepared by a local flooding consultant, with Strategic Planning
                                                                                                            overseeing its preparation and consultation. The strategy will form
                                                                                                            part of a suite of planning studies and strategies that will inform the
                                                                                                            preparation of the new planning scheme as well as inform a range of
                                                                                                            flood management projects and priorities across relevant work
                                                                                                            areas of council. The strategy was expected to extend into this
                                                                                                            current financial year given its commencement time and expected
                                                                                                            delivery date. The project will be completed by the end of this
                                                                                                            calendar year.

                                               Noosa River Hydraulic Model                                  This project is currents under tender with a consultant to be                 290,052                               290,052
                                                                                                            commissioned in August. The project has taken additional time to
                                                                                                            commence due to the complexities of the project and wanting to
                                                                                                            ensure adequate detail in the project brief. The model outputs will
                                                                                                            provide new flood levels and flood extents for the Noosa River
                                                                                                            catchment and new hydrodynamic information within the Noosa
                                                                                                            River itself to assist with erosion management. The project is
                                                                                                            expected to be completed early 2016.
                                              Noosaville - Gympie Tce / Williams St                         Ongoing delays with tenure, approvals and design.                              30,861                                 30,861
      Coastal Canals and Waterways Total                                                                                                                                                  409,125                               409,125
         Community Facilities                  Noosa Aquatic Centre Tile Regrout & Refurbishment            Work commenced in June 2015 which identified an extended scope                 30,000                                 30,000
                                                                                                            of refurbishment required
                                               Noosa Library & NLC Plumbing Refurbishment                   Initial works undertaken and further works scheduled for coming                15,000                                 15,000
                                                                                                            months - scope of works has changed following intiial investigations
                                               Peregian Surf Club Public Amenities planning & design        Initial work undertaken but not yet completed as alternatives are              12,777                                 12,777
                                                                                                            considered
                                               Respite Centre Refurbishment                                 Tender awarded late in the financial year and works currently                 238,866                               238,866
                                                                                                            underway
                                              Tait Duke House - relocation                                  Contractor engaged, relocation pending weather.                                58,084                                 58,084
                                               Whole of Shire Light Pole Inspections                        Stage 1 inspection of sportsgrounds completed with stage 2                     70,440                                 70,440
                                                                                                            inspections of parks set to commence in September 2015
                                              Mill Place Boiler House - stage 2                             Scope of works to be confirmed - report to Council to follow                   97,300                                 97,300
      Community Facilities Total                                                                                                                                                          522,467                               522,467
         Corporate Buildings                   Tewantin Council Office - roof rehab                         Project has been an allocated contingency for some repairs and is              30,000                                 30,000
                                                                                                            needed now that condition assessment has been completed.
      Corporate Buildings Total                                                                                                                                                            30,000                                 30,000
         Environmental Assets, Bushland, Ti    |Weyba Creek - bank erosion restoration                      Jan Madden is the responsible officer and these works are requred               8,990                                  8,990
                                                                                                            once the infrastructure is constructed through the 2015/16 year.

      Environmental Assets, Bushland,                                                                                                                                                       8,990                                  8,990
      Tracks and Trails Total

                                                                                                                                            Page 31         of 40

Section 32

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 32 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                                                24 AUGUST 2015

       Capital / Operating                   Capital

       Sum of Proposed Budget Carryover                                                                                                                                    Revenue / Expense
       CAPEX PROGRAM                         Cost Centre / Project Description                             Details                                                         Expense                 Revenue                 Grand Total
         Fleet                                  Whole of Shire Plant Replacement Program                    Actual replacement program varied throughout the year due to                 454 466                                454,466
                                                                                                            emerging issues and opportunities pursued. Carryover funds to be
                                                                                                            used to progress leased vehicle replacement program.
       Fleet Total                                                                                                                                                                       454,466                                454,466
         Holiday Parks                         Cooroy RV Stopover                                           In progress - Not yet complete                                                32,949                                 32,949
                                               Noosa River Holiday Park                                     Design phase not complete                                                      13,281                                13,281
       Holiday Parks Total                                                                                                                                                                46,230                                 46,230
          IT                                    Whole of Shire Tech One HR Module                           Implementation deferred due to resourcing constraints during                  105,990                               105,990
                                                                                                            2014/15 and focus on other priorities.
       IT Total                                                                                                                                                                          105,990                                105,990
          Parks & Playgrounds                   Re-lining of Ben Lexcen stormwater                          Initial estimates indicate more funds required and the volume of              28,257                                 28,257
                                                                                                            damaged connected pipes has significantly increased, currently
                                                                                                            request for Quotes have recently been received and are being
                                                                                                            assessed.
                                                Tewantin Splash Park Playground Renewal                     This project has commenced planning and quotations and was a                  130,000                               130,000
                                                                                                            late project at the end of the 14/15 financial year.
       Parks & Playgrounds Total                                                                                                                                                         158,257                                158,257
          Pathways & Enabling Facilities        Gibson Road (Eumindi Noosa Rd to Thomas St) - On road cy Carryover required for resumption and remaining footpath works yet                15,000                                15,000
                                                                                                            to be completed - $15,000 to be allocated to outstanding Land
                                                                                                            acquisition.
                                                Noosa Heads - Park Road boardwalk design                    Commenced - Carried over in 15/16 to ensure that Council is                   156,865                               156,865
                                                                                                            construction ready for 16/17.
                                                Sunrise Beach - Ben Lexcen Dr school                        Grant funded project 2015/2016 and funds will be required to                  45,716                                 45,716
                                                                                                            support construction activities.
       Pathways & Enabling Facilities Total                                                                                                                                              217,581                                217,581
         Public Transport Infrastructure       Electric Bus Charging Station and Installation               Funds are committed for the installation of the charging stations.            77,910                                 77,910
                                                Electric Bus Feasibility Study                              Still outstanding works to be completed before project can be                   4366 -               (50,000) -    (45,634)
                                                                                                            completed including commitments that have been raised.
                                                Noosa Bus Station Safer Streets Program                     Still outstanding works to be completed to have the CCTV                      50,291  -              (57,900) -      (7,609)
                                                                                                            operational.
       Public Transport Infrastructure Total                                                                                                                                             132,567 -              (107,900)        24,667
          Sealed Roads Network                  Dr Pages - Kinmond Creek Rd Initial Planning & Design       Continuation and finalisation of design funds committed - this project        75,055                                 75,055
                                                                                                            was anticipated to continue into 15/16.
                                                Sealed Road Pavement surveys and Investigations             Still outstanding work to be completed with condition data as a result         39,064                                39,064
                                                                                                            in delays with contractor.
                                                Tewantin Cooroy Noosa Rd Stages 2-6 Design Only             This project was planned to carryover into 15/16 and has recently             120,986                               120,986
                                                                                                            attracted grant funding approval.
                                                Whole of Shire - pavement surveys                           Funds required to undertake more pavement designs once                         19,687                                19,687
                                                                                                            condition analysis is completed.
                                                Whole of Shire - reseal and rehab                           This amount needs to allocate approx. $318k to Gibson road                  1,378,679                             1,378,679
                                                                                                            project. Remaining funds will be utilised for the projects that were
                                                                                                            not completed in 2014/15.
       Sealed Roads Network Total                                                                                                                                                       1,633,471                             1,633,471
          Sports Ground and Facilities          Girraween Sports Complex Lighting                           Still outstanding works to be completed to install the system - this           10,000                                10,000
                                                                                                            has now been allocated to Council's electrician.
       Sports Ground and Facilities Total                                                                                                                                                  10,000                                10,000
          Stormwater Drainage                   Gympie Terrace pipe rehabilitation                          Delays in the specifications and that the pipes could not be religned         194,386                               194,386
                                                                                                            has extended the length of the design phase.
                                                Gympie Terrace Pipe Rehabilitation - Investigation & Design The Culvert in Thomas street requires a more detailed specifications           10,763                                10,763
                                                                                                            and method of works before we can commence construction.

                                                                                                                                      Page 32 of 40

Section 33

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 33 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                                                24 AUGUST 2015

       Capital / Operating                    Capital
       Sum of Proposed Budget Carryover                                                                                                                                      Revenue / Expense
       CAPEX PROGRAM                          Cost Centre / Project Description                              Details                                                          Expense                 Revenue                 Grand Total
          Stormwater Drainage                    Whole of Shire - Flood mitigation stage                      Daintree Estate & Pomona Rifle St In progress, carry over funds.            2,097,747 -              (802,072)     1,295,675
                                                                                                              Daintree nearing completion. Pomona delayed due to property
                                                                                                              resumption matters.
                                                 Whole of Shire - stormwater structures                       Delays were incurred due to resourcing staff due staff illness and             47,581                                 47,581
                                                                                                              appointments. Funds will be consolidated with 15/16 program to
                                                                                                              deliver a greater volume of structures to be replaced.
       Stormwater Drainage Total                                                                                                                                                          2,350,477 -              (802,072)     1,548,405
          Streetscapes and Road Corridors        Cooroy Noosa Road Corridor Improvement                       Carryover, still outstanding commitments and signage required to               88,554 -               (28,750)        59,804
                                                                                                              complete this stage.
                                                 Peregian Beach - precinct planning                           Carry over - more community consultation required and impacts on               29,618                                 29,618
                                                                                                              surrounding developments to be considered.
                                                 Rufous St Design & Development Phase                         Carry over funds required to continue the concept planning                      13,167                                13,167
                                                                                                              activities.
                                                 Rufous St Precinct Redevelopment                             Demolition of existing buildings completed. Original estimate                      -                                     -
                                                                                                              insufficient - Additional funds required for demolition including
                                                                                                              asbestos removal and temporary fencing. No funds required for
                                                                                                              15/16 for this stage of project.
       Streetscapes and Road Corridors                                                                                                                                                      131,339 -               (28,750)       102,589
       Total
          Transport and Infrastructure Manag __ Eenie Creek Pathway Stage 1 Signage                           Project delayed and remaining funds are required to pay for the                 19,003 -              (10,000)         9,003
                                                                                                              works recently completed. This project is also supported by grant
                                                                                                              funding.
                                                 Noosa Junction Transit Centre - improve                      Works have been delayed as Council negotiates with translink and               40,000 -               (20,000)        20,000
                                                                                                              DTMR.
                                                 Standards Review - Standard Drawings                         Ongoing works required for Council to continue and update the suite             13,791                                13,791
                                                                                                              of standard drawings for our infrastructure.
                                                 Whole of Shire Traffic Study                                 Traffic study is ongoing and was delayed due to staff vacancies.               41,201                                 41,201
                                                                                                              Project is progressing and the remaining carryover funds have been
                                                                                                              committed.
                                                 Weyba Road Reef Street Intersection Improvements - PIP       Carry over - this project has attracted TIDS project for 15/16 and            104,480                                104,480
                                                                                                              also cycle grant funding for 2015/16.
       Transport and Infrastructure                                                                                                                                                         218,474 -               (30,000)       188,474
       Management Total
         Waste Management                       Noosaville Landfill - Dosing & Monitoring Equipment           Carry over - pending advice from DEHP / Council Env Officer                   120,000                                120,000
       Waste Management Total                                                                                                                                                               120,000                                120,000
       Grand Total                                                                                                                                                                        8,059,208 -              (968,722)     7,090,486

                                                                                                                                      Page 33 of 40

Section 34

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 34 of 40

GENERAL COMMITTEE MEETING AGENDA                      24 AUGUST 2015

       ; ens in  soe cea ae    ‘a as tite ese pb            pe st
            FN ENG re      Reel            ee      aS

                                FINANCIAL STATEMENTS
                                         2015/2016
                          BUDGET REVIEW 1 - CARRYOVERS

                                                         Page 34 of 40

Section 35

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 35 of 40

Noosa Shire Council
2015/16 Budget Statements
For the period ending 30 June
Annual Result - Total Council                  | original | Revised |                                                   recast
                                                    2016       2016        Pd         PE)       rah:        riyhy)      2021      yi)          2023       yal}        Py)
                               .                    $,000      $,000      $,000       $,000      $,000      $,000       $,000      $,000       $,000      $,000      $,000
Statement of Comprehensive Income
Income
Revenue
   Recurrent revenue
   Net rates, levies and charges                     60,463      60,463     62,348     63,970     65,963      67,676     69,780      71,589     73,811     75,721      78,043
   Fees and charges                                   4,805       4,805      4,926      5,049       5,175      5,304      5,437       5,573      5,712      5,855       6,001
   Rental income                                      1,174       1,174      1,203      1,233       1,264      1,296       1,328      1,361      1,395       1,430      1,466
   Interest received                                  4,568       4,568      4,314      4,492       4,673      4,725      4,981       5,087      5,213      5,332       5,430
  Sales revenue                                       7,290       7,290      7,472      7,659       7,850      8,045      8,246       8,452      8,663      8,879       9,101
  Other income                                        3,613       3,613      3,703      3,796       3,891      3,988      4,088       4,190      4,295      4,402       4,512
  Grants, subsidies, contributions and donations      5,393       5,393      5,406      5,474       5,542      5,611      5,680       5,749      5,819      5,889       5,959
  Total recurrent revenue                            87,307      87,308     89,373     91,674     94,359      96,647     99,541     102,002    104,909    107,510     110,514
  Capital revenue
  Grants, subsidies, contributions and donations      3,678                  3,130      4,580       4,035      6,500      6,500       6,500      6,500      6,500       6,500
                                                                     sd
  Total revenue                                      90,985                 92,503     96,254     98,394     103,147    106,041     108,502    111,409    114,010     117,014
  Capital income
  Total capital income                                    -                      -          -           -          -          -           -          -          -           -
Total income                                         90,985                 92,503     96,254     98,394     103,147    106,041     108,502    111,409    114,010     117,014

   Recurrent expenses                                      f
   Employee benefits                                 27,656                 28,568     29,283     30,238      30,994     32,003      32,803     33,870     34,717      35,844
   Materials and services                            39,083                 40,324     41,332     42,365      43,424     45,424      46,560     47,724     48,917      50,140
   Finance costs                                      2,458       2,458      2,335      2,157       1,968      1,770       1,552      1,324      1,082        826         550
   Depreciation and amortisation                     16,630      16,630     16,665     17,076      17,520     17,800     18,517      19,160     20,137     20,789      21,405
  Other expenses                                        122        122         125        128         131        134        138         141        145        148         152
  Total recurrent expenses                           85,949                 88,018     89,976     92,222      94,123     97,635      99,989    102,957    105,397     108,091
  Capital expenses
  Total capital expenses                                  -                      -          -           -          -          -           -          -          -           -
  Total expenses                                     85,949                 88,018     89,976     92,222      94,123     97,635      99,989    102,957    105,397     108,091
                                                            Ld
Net result                                            5,036       5,741      4,485      6,278       6,172      9,024      8,406       8,513      8,452      8,613       8,923
Operating result
Recurrent revenue                                    87,307     87,308      89,373     91,674     94,359      96,647     99,541     102,002    104,909    107,510     110,514
Recurrent expenses                                   85,949                 88,018     89,976     92,222      94,123     97,635      99,989    102,957    105,397     108,091
Operating result                                |    1,358]                  1,355      1,698      2,137      2,524       1,906      2,013       1,952      2,113       2,423

                                                                                                                             Page 35 of 40

Section 36

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 36 of 40

Noosa Shire Council
2015/16 Budget Statements
For the period ending 30 June
Annual Result                                 [ original | Budget
                                                   2016        Pals        PA           2018        2019         2020        PLA         Puy)         Phx)          2024        2025
Statement of Financial Position                   $,000       $,000        $,000        $,000       $,000        $,000        $,000       $,000        $,000       $,000        $,000
Assets
  Current assets                                         p
  Cash and cash equivalents                         34,278                   34,351       32,394      30,608       31,565       31,530      31,861       32,060      31,360       30,482
  Trade and other receivables                        8,059                    8,313        8,521      8,770         8,964        9,251       9,481        9,758      9,974        10,291
  Inventories                                          103                      104          104         104          104          104         104          104         104          104
  Other current assets                                433                       668         679          690          701         713          725          737         749          761
  Total current assets                              42,874                   43,436       41,698      40,172       41,334      41,598       42,172       42,659      42,187       41,638
  Non-current assets                                     p
  Investments                                      111,234                  114,027      114,027     114,027      114,027      114,027     114,027      114,027     114,027      114,027
  Property, plant & equipment                      931,673                  950,123      978,895    1,008,163   1,037,927    1,067,774    1,098,024   1,128,626    1,160,551   1,193,135
  Other non-current assets                           3,480                   3,227         3,130      2,582        2,020        2,092        1,802        1,517        1,335       1,263
                                                          Po
  Total non-current assets                       1,046,387                1,067,376    1,096,053    1,124,772   1,153,974    1,183,893    1,213,853   1,244,170    1,275,913   1,308,425
                                                                       |
  Total assets                                   1,089,261                1,110,812    1,137,750    1,164,943   1,195,308    1,225,492    1,256,024   1,286,830    1,318,100   1,350,063
Liabilities
  Current liabilities                                    f
  Trade and other payables                           4,280                    4,428        4,538       4,660       4,763        4,980       5,104         5,241       5,357        5,515
  Borrowings                                         2,855       2,855       3,033        3,222       3,420        3,638        3,866        4,108       4,364         4,640       4,034
 Provisions                                          4,535                   5,139        5,267       5,399         5,534       5,672       5,814        5,959         6,108       6,261
  Other current liabilities                            801                      390         400          410          420         430          441          452         464          475
                                                                       |
  Total current liabilities                         12,470                   12,989       13,428      13,888       14,355       14,948      15,467       16,016       16,568      16,285
  Non-current liabilities
  Borrowings                                        35,247      35,247       32,215       28,893      25,573       21,935       18,070      13,961       9,597       4,957           924
 Provisions                                          8,284                    8,415        8,624      8,838        9,058        9,283        9,514        9,750      9,993        10,242
                                                          Pp
  Total non-current liabilities                     43,531                   40,630       37,616      34,411       30,993       27,353      23,475       19,348       14,950      11,165
                                                          a
  Total liabilities                           |    56,001                    53,619       51,044     48,300        45,348      42,301       38,942       35,364       31,519      27,450
                                               fd
Net community assets                             1,033,260                1,057,193    1,086,706    1,116,644   1,149,960    1,183,191    1,217,082   1,251,466    1,286,582   1,322,613
Community equity
                                                          PT
  Asset revaluation surplus                         44,367                   59,469       82,909     106,884      131,392      156,439     182,040      208,204     234,944      262,295
  Retained surplus                                 988,893                  997,724    1,003,797    1,009,760   1,018,568    1,026,754    1,035,042   1,043,262    1,051,637   1,060,318
                                                          Pp
  Total community equity                         1,033,260                1,057,193    1,086,706    1,116,644  11,149,960    1,183,191    1,217,082   1,251,466    1,286,582   1,322,613

                                                                                                                       Page 36 of 40

Section 37

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 37 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                                         24 AUGUST 2015

                Noosa Shire Council
                2015/16 Budget Statements
                For the period ending 30 June
               Annual Result                                   | Original |_ Budget
                                                                    2016        2016       2017        2018       2019        2020        2021      PAW          2023      PA           2025
                Statement of Cash Flows                             SAL)        SAL)       SAL)        SAL)       Sat)        $,000      Aly        EAT         EAL         EAL         EY
                Cash flows from operating activities
                                                                            PY
                  Receipts from customers                             72,826                 75,111     77,107      79,392     81,500      83,863     86,086      88,630     90,976      93,587
                  Payments to suppliers and employees               (66,913)               (68,915)    (70,655)   (72,632)    (74,465)   (77,362)    (79,389)    (81,607)   (83,668)    (85,975)
                  Dividend received                                    3,014      3,014       3,089      3,167       3,246      3,327       3,410       3,495      3,583       3,672      3,764
                  Interest received                                    4,568      4,568       4,314      4,492       4,673      4,725       4,981      5,087       5,213       5,332      5,430
                  Rental income                                        1,170                  1,201       1,231      1,262       1,294      1,325       1,359      1,393       1,428      1,463
                  Non-capital grants and contributions                 5,374                  5,405      5,469       5,538      5,608       5,674      5,745       5,814       5,886      5,953
                  Borrowing costs                                    (2,303)     (2,303)    (2,180)     (2,002)    (1,812)     (1,615)     (1,397)    (1,169)      (926)       (670)       (395)
                  Other cash flows from operating activities            (11)        (11)       (11)        (11)       (11)        (11)        (12)       (12)        (12)       (12)        (12)
                  Net cash inflow from operating activities           17,725                 18,013     18,799      19,655     20,361      20,483     21,202      22,087     22,944      23,816
                Cash flows from investing activities
                                                                            PY
                  Payments for property, plant and equipment        (22,709)               (19,573)    (21,939)   (22,264)      2249-    (22,741)    (23,166)    (23,941)   (25,491)    (26,216)
                  Payments for intangible assets                       (595)                  (794)       (374)          -          -       (650)       (350)      (350)       (300)       (350)
                  Proceeds from sale of property, plant and equipma        - Pe                   -          -           -          -           -          -           -          -           -
                  Grants, subsidies, contributions and donations       3,678                  3,130      4,580       4,035      6,500       6,500      6,500       6,500       6,500      6,500
                  Other cash flows from investing activities           (702)       (702)         10         10          10         10          10          11         11          11         12
                  Net cash inflow from investing activities         (20,328)               (17,227)    (17,723) = (18,219)    (15,984)   (16,881)    (17,005)    (17,780)   (19,280)    (20,054)
                Cash flows from financing activities
                  Proceeds from borrowings                             1,360      1,360           -          -           -          -           -          -           -          -           -
                  Repayment of borrowings                            (2,638)     (2,638)    (2,855)     (3,033)    (3,222)     (3,420)     (3,638)    (3,866)     (4,108)    (4,364)     (4,640)
                  Net cash inflow from financing activities          (1,278)     (1,278)    (2,855)     (3,033)    (3,222)     (3,420)     (3,638)    (3,866)     (4,108)    (4,364)     (4,640)
                Total cash flows
                                                                                     ee
                Net increase in cash and cash equivalent held        (3,882)                (2,069)     (1,957)    (1,786)        957         (35)       331         199       (700)       (878)
                                                                            PY
               Opening cash and cash equivalents                      38,160                 36,420     34,351      32,394     30,608      31,565     31,530      31,861     32,060      31,360
                                                                           po
                Closing cash and cash equivalents                     34,278                 34,351     32,394      30,608     31,565      31,530     31,861      32,060     31,360      30,482

                                                                                                                               Page 37 of 40

Section 38

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 38 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                                      24 AUGUST 2015

               Noosa Shire Council
               2015/16 Budget Statements
               For the period ending 30 June
               Annual Result                                   | Original | Budget |                                                 Frecast,
                                                                   2016       2016       Pl         PLE}        2019        2020       2021       PlpP)       2023       Ply        2025
               Statement of Changes in Equity                      Ay         AY          ely        $,000      $,000     EAL          EAT        SAY         $,000      $,000      $,000
               Asset revaluation reserve
                                                                          po
                  Opening balance                                   21,798                 36,520     59,469      82,909    106,884    131,392     156,437    182,040    208,204    234,944
                  Increase in asset revaluation surplus             22,569                 22,949     23,440      23,975     24,508     25,046      25,603     26,163     26,741      27,351
                  Closing balance                                   44,367                 59,469     82,909     106,884    131,392    156,437     182,040    208,204    234,944    262,295
               Retained surplus
                                                                                    7
                  Opening balance                                  984,049                993,439    997,724   1,003,797  1,009,760   1,018,568  1,026,754  1,035,042   1,043,262  1,051,637
                  Net result                                         4,843                  4,285      6,073       5,963      8,808      8,185       8,288      8,221      8,375       8,680
                  Closing balance                                  988,893                997,724   1,003,797  1,009,760  1,018,568   1,026,754  1,035,042  1,043,262   1,051,637  1,060,318
               Total
                                                                                    7
                  Opening balance                                 1,005,848             1,029,959   1,057,193  1,086,706  1,116,644   1,149,960  1,183,191  1,217,082   1,251,466  1,286,582
                  Net result                                         4,843                  4,285      6,073       5,963      8,808      8,185       8,288      8,221      8,375       8,680
                  Increase in asset revaluation surplus             22,569                 22,949     23,440      23,975     24,508     25,046      25,603     26,163     26,741      27,351
                  Closing balance                                 1,033,260             1,057,193   1,086,706  1,116,644  1,149,960   1,183,191  1,217,082  1,251,466   1,286,582  1,322,613

                                                                                                                            Page 38 of 40

Section 39

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 39 of 40

GENERAL COMMITTEE MEETING AGENDA                                                                            24 AUGUST 2015

         Noosa Shire Council
         2015/16 Budget Statements
         For the period ending 30 June

                                                           Pata      rath Ls     2017       2018       2019       PAUP)      Liye!      LIP         LIP       ru |        2025
         Financial Sustainability Ratios                   AAI        A          RAUL       BAIL       A          BAU        BAU        BAU        Ae         BID        AM
        Operating Surplus Ratio                               1.6%                  1.5%       1.9%       2.3%       2.6%       1.9%       2.0%       1.9%       2.0%       2.2%
        Net Financial Liabilities Ratio                      15.0%                 11.4%      10.2%       8.6%       42%        0.7%      -3.2%      -7.0%      -9.9%     -12.8%
        Asset Sustainability Ratio                          99.9%                  99.0%     100.1%     100.6%     100.1%      97.8%      97.1%     96.2%      100.0%     100.2%

        Operating Surplus Ratio
        Measures the extent to which revenues raised cover operational expenses
        only or are available for capital funding purposes or other purposes.
        Calculation: Net result divided by total operating revenue, expressed as a %.
        Target: between 0% and 10%

        Net Financial Liabilities Ratio
        Measures the extent to which the net financial liabilities of Council can
        be repaid from operating revenues.
        Calculation: (total liabilities less current assets) divided by
        total operating revenue, expressed as a %.
        Target: not greater than 60%.

        Asset Sustainability Ratio
        This ratio reflects the extent to which the infrastructure assets managed by Council
        are being replaced as they reach the end of their useful lives.
        Calculation: capital expenditure on the replacement of infrastructure assets
        (renewals) divided by depreciation expense, expressed as a %.
        Target: greater than 90%.

                                                                                                                 Page 39 of 40

Section 40

GENERAL COMMITTEE MEETING AGENDA   24 AUGUST 2015




                                     Page 40 of 40

GENERAL COMMITTEE MEETING AGENDA                                                      24 AUGUST 2015

             Noosa Shire Council
             2015/16 Budget Statements
             For the period ending 30 June
                                                                                2016       2016
             Capital Works Program                                              $,000     $,000
                                                                                     ————|
             Bridges                                                             290
             Cemeteries                                                          -         a
             Coastal, Canals and Waterways                                       291
             Commercial Land & Properties                                        360
             Community Facilities                                                258
             Corporate buildings                                                  AF
             Environmental Assets, bushland tracks & Trails                      100
             Fleet - Plant Replacement                                         1,854
             Gravel Road Network                                                 350
             Holiday Parks                                                       -
             Information Technology                                              195
             Parks & Playgrounds                                                 361
             Pathways & Enabling Facilities                                      263
             Planning Scheme                                                     400 | =   400 |
             Public Transport Infrastructure                                   1,500
             Sealed Road Network                                              15,071
             Sports Grounds & Facilities                                          30
             Stormwater Drainage                                                 550
             Streetscapes and Road Corridor                                      -
             Transport and Infrastructure Management                           1,105
             Waste Management                                                    310
             Total Capital works Program                                | 23,304     Leerel

                                                                                          Page 40 of 40

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.