SEC Constructions_P4_Q16_69 Maple Street, COOROY - BA - Applicant · OPW20/0197
Noosa Council documents
Plan Rev. Plan/Document Name Date
No.
- Sheet 1 of 10 Title Page (3d elevations), drawn by Accolade 09/04/2020
Building Designs
- Sheet 2 of 10 Site Plan, drawn by Accolade Building Designs 09/04/2020
- Sheet 3 of 10 Floor Plan, drawn by Accolade Building Designs 09/04/2020
- Sheet 4 of 10 Elevations, drawn by Accolade Building Designs 09/04/2020
- Sheet 5 of 10 Section A, drawn by Accolade Building Designs 09/04/2020
Nature and Extent of the approved use
3. This approval is for a secondary dwelling in accordance with the Noosa Plan definition as
shown on the approved plans.
Currency Period
4. The Currency Period for this development approval lapses if the use has not happened by 6
May 2026, unless an application to extend the currency period is approved by Council.
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
Heritage
6. The dwelling must be constructed as per the design and materials as shown on the approved
plans and reflect the character of Cooroy.
Site Access and Driveways
7. A sealed access driveway must be provided from Maple Street to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and must include in particular:
a. a driveway designed generally in accordance with Council’s standard drawings RS-
049 and RS-050 and respective addendums;
b. a longitudinal section extending from the centreline of the formation in Maple Street to
the proposed carport;
c. levels and grades of the access driveway;
d. the necessary stormwater drainage structures.
Stormwater Drainage
8. All stormwater drainage (including roof water overflow and runoff from hardstand areas) must
be collected and discharged so there is no net increase in stormwater runoff from the site to
adjoining properties. Stormwater drainage permitted to drain from the site shall be
discharged to Council’s existing kerb and channel in Maple Street.
9. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with SCG’s drawing
30076-SW1, titled ‘Roof Storm Water Plan’, dated April 2020, and must be approved as part
of the subsequent Building Permit.
Page 2 of 5
Document Set ID: 21128560
Version: 7, Version Date: 13/05/2020 Print Date: 13 May 2020, 9:55 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SEC Constructions_P4_Q16_69 Maple Street, COOROY - BA - Applicant.pdfRelated documentApplication case desk ↗
About this file
- File size
- 447 KB (small file)
- File type
No other editions are linked here.