Skip to the record
Search everything, all in one place.

Original source · versioned page text

Appendix A_Code Compliance Tables

Attached to the e-mail REC16/0015 Development Application.

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                                 Response column key:
                                                                                                                                                      Achieved
10.1     Tidal works, or development in the coastal management district state code                                                                   P/S Performance solution
                                                                                                                                                     N/A Not applicable
Table 10.1.1: All development
Performance outcomes                        Acceptable outcomes                                           Response   Comment
PO1 Development in a coastal hazard         AO1.1 Development is located outside a high coastal           N/A        The site is not located within the high coastal hazard area.
area is compatible with the level of        hazard area unless it is:
severity of the coastal hazard.             (1) coastal-dependent development, or
                                            (2) compatible with inundation due to its nature or
                                                function, or
                                            (3) temporary, readily relocatable, or able to be
                                                abandoned, or
                                            (4) essential community service infrastructure, or
                                            (5) small- to medium-scale tourist development, or
                                            (6) redevelopment within an existing built-up urban area,
                                                or is redevelopment of built structures that cannot be
                                                relocated or abandoned.
                                            AND

                                            AO1.2 Development referred to in AO1.1(6) avoids being        N/A
                                            located within a high coastal hazard area, or where this is
                                            not practicable, minimises the exposure of people and
                                            permanent structures to coastal hazard impacts.
PO2 Development siting, layout and          AO2.1 Development within a coastal hazard area is                       The proposal is for subdivision of the existing dwellings only
access in a coastal hazard area             located, designed, constructed and operated to maintain                  and does not seek to increase the number of people on the
responds to potential inundation due to a   or enhance the community’s resilience to defined storm                   site.
defined storm tide event and minimises      tide events by limiting the exposure of people and
associated risks to personal safety and     structures to associated impacts.
property.                                   AND

                                            AO2.2 Development mitigates any residual impacts from                   The existing dwellings and building envelopes for future
                                            storm tide inundation in a coastal hazard area including by              dwellings are located on the elevated parts of the site ie. 17-
                                            ensuring:                                                                20m AHD. This is well above the defined storm tide event.
                                            (1) habitable rooms of built structures are located above
                                                the defined storm tide event level and any additional
                                                freeboard level that would ordinarily apply in a flood
                                                prone area under a relevant planning scheme
                                                standard, or
                                            (2) a safe refuge is available for people within the
                                                premises during a defined storm tide event, or
                                            (3) at least one evacuation route remains passable for
                                                emergency evacuations during a defined storm tide
Log in to download the original file

Appendix A_Code Compliance Tables.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.