Council archive · source document
08/1616 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172008.1616
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Attachments and supporting information (Compiete Table! - Use a separate row for each type of attachment or information, including information required under
this Parl) Please ensure all documentation submitted with this form, including other Parts of Form 1, or owner's consent, etc, are securely attached to this Part of the Form.
Table! {eg. oes See eons at oouce Title tf appticabie) Date Method of delivery to
allocation’entitlement, plans, drawings, reports) (e.g. Genera! Authority, James Street Traffic Report) assessment manager
1.
b
Portable Long Service Leave (PLSL) levy (Applicable for certain building and construction work valued aver $80,000 only)
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (“box if applicable)
(0 the application seeks a preliminary approval only;
(7 the application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave)
Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out Solely for farming purposes:
land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or
controlling weeds or pests);
LD all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST: or
LD the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-buikler permit number stated). The receipted form must be Sighted by the
assessment manager before a development permit can be given,
11. ls payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)
No - End of Part A (71 Yes - Answer Q12 below
12. Has the PLSL levy been paid?
oO No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by the
Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit a Notification
and Payment Form to QLeave.}
O Yes - Complete Table & and submit, with the application, the ‘yellow’ (Local Government's (Council) / Private Centifier's) copy of the receipted Qleave Form,
. . QLeave Project Number
Table L Amount paid Date paid (6 digits, starting with A, B, E, L or P)
ollo- | ioloalot - Biota
S.
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
Receivi
Fee ($) Wes Dale received S14 a B Ce Reference 6 “i Gib
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERNEJER
To: Council. | have been engaged as the private certifier for the building work referred to in this application,
Oate of engagement Name BSA Certification ticense number Building classification/s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Amount paid Date receipted form
‘s) Date paid sighted by Name of officer who sighted the form
assessment manager QL
Pruelling Cekensionl 61073 GbIe | (ofc EN.
—?
Privacy Statement
The information collected an Form 1 will be used by the Department of infrastructure and Planning (DIP} in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for @ purpose outside of the DAS process, except where required by legistation (including the Freedom of Information Act 1992) or :
as required by Parliament. This information may be stored in a DIP database. The information coltected will be retained as required by the Public Records Act 2002.
Description of the work QLeave Project Number
Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1616 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.