Stormwater Management Report · MCU22/0087.01

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

REC:
waht

37 Bottlebrush Avenue
20220051

Stormwater Management Plan

October 2024

 
Full text of the other 18 pages

Page 2

Document control record
Document prepared by:
RECOR Pty Ltd
ABN 89 647 469 707
37 Mary Street
Noosaville, QLD 4566
Australia

T +61 7 5211 1003
E [email protected]
W recorconsulting.com

A person using RECOR documents or data accepts the risk of:
a)     Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard
       copy version.
b)     Using the documents or data for any purpose not agreed to in writing by RECOR.



 Document control

 Report title                      Stormwater Management Plan

 Document code                     20220051-SWMP01                     Project number               20220051


 File path

 Client                                Bottlebrush Property Pty Ltd

 Client contact                    -                                   Client reference             -
 Rev      Date                     Revision details/status             Author       Reviewer        Verifier         Approver
                                                                                                    (if required)

 0        05/05/2022               Initial Version                     B. Parry     N. Wagstaff

 1        28/10/2024               Updated for revised design          M. Poynter   A. Steele



 Current revision                  0


 Approval

 Author signature                                                      Approver signature

 Name                              M. Poynter                          Name                         A. Steele

 Title                             Director                            Title                        Civil Engineer




P 1300 469 707                                       E [email protected]
                                                                                                                       Page 2 of 14

Page 3

Contents
Introduction .................................................................................................................................... 4
Site Details...................................................................................................................................... 5
          2.1. Existing Site Description ...................................................................................................................... 5
          2.2. Existing Drainage Patterns .................................................................................................................. 5
          2.3. Proposed Development Drainage Pattern ......................................................................................... 7
          2.4. Flood Considerations ........................................................................................................................... 7

Stormwater Quality Management ..................................................................................................... 8
          3.1. Operational Stormwater Management................................................................................................ 8
          3.2. Construction Stormwater Management .............................................................................................. 8

Stormwater Quantity Management ..................................................................................................10
          3.3. Pre-post comparison ..........................................................................................................................10

Conclusion....................................................................................................................................13




Appendices
Appendix A
          DRAINS Modelling Results




P 1300 469 707                                            E [email protected]
                                                                                                                                                 Page 3 of 14

Page 4

INTRODUCTION

RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application
for development of residential units on a property located at 37 Bottlebrush Avenue.

This report investigates the stormwater management considerations for the existing and proposed development
site and assesses how the run-off from the site is to be managed in accordance with Noosa Council requirements
for stormwater drainage.

This document has been prepared with consideration for the following specifications, guidelines and reports:

    •   Noosa Plan 2020

    •   State Planning Policy 2017

    •   Queensland Urban Drainage Manual (QUDM), IPWEA

    •   International Erosion Control Association (IECA) Best Practice Erosion and Sediment Control

    •   Water Sensitive Urban Design Technical Design Guidelines for Southeast Queensland, Healthy Waterways




P 1300 469 707                                 E [email protected]

                                                                                                       Page 4 of 14

Page 5

SITE DETAILS

    2.1. Existing Site Description
The existing site is known in real property terms as Lot 133 RP 88934, located at 37 Bottlebrush Avenue, Noosa
Heads. The existing site covers an area of 491m² and contains an existing residential dwelling with vehicular access
from Berrima Row. A locality plan of the proposed site is presented in Figure 2.1 - Site Locality Plan (Noosa Council
Intramaps, 2022).




                            Figure 2.1 - Site Locality Plan (Noosa Council Intramaps, 2022)



    2.2. Existing Drainage Patterns
The site is developed, with the internal catchment being made up of the existing dwelling roof area and surrounding
landscaping. An internal network of grated drains and field inlet pits provide for the capture and conveyance of
surface stormwater run-off from within the site.


P 1300 469 707                                  E [email protected]

                                                                                                          Page 5 of 14

Page 6

The survey of the site has identified two 100mm diameter PVC pipes discharging into the Bottlebrush Avenue
drainage system. The internal stormwater drainage network, as well as the outlets from the roof drainage will be
discharged via this outlet as the lawful point of discharge.
An upstream catchment from the adjacent property to the northeast is expected to drain overland into the subject
site. The upstream catchment, of approximately 380m² is currently undeveloped and is expected to drain as overland
sheet flows across the property boundary. This area is shown in yellow in Figure 2.2 - Site Characteristics (Noosa
Council Intramaps, 2022).




                                                 Approx. upstream
                                                 catchment 380m²




                                                          Discharge via
                                                          2x100mm PVC
                                                          Kerb Outlet




                          Figure 2.2 - Site Characteristics (Noosa Council Intramaps, 2022)



P 1300 469 707                                 E [email protected]

                                                                                                        Page 6 of 14

Page 7

    2.3. Proposed Development Drainage Pattern

        2.3.1 Stormwater Concept
The existing dwelling will be replaced by the proposed unit building and outdoor areas. As the existing site is
developed, an assessment of the impacts of the proposed change to impervious areas has found that the increase
to stormwater discharge from the site is negligible.

It is proposed that the lawful point of discharge for the development will be maintained as per the existing site, with
stormwater run-off from the property discharging via kerb adaptors into the Bottlebrush Avenue drainage system.

Inlet pits will be provided along the northern boundary to provide for the capture of upstream run-off to ensure it
can be conveyed through the development without impacting upon the open space areas for the proposed
development. The internal drainage network will provide for the collection of run-off from impervious areas as well
as for roof drainage connections. The run-off will be discharged via direct connection to existing pits and kerb
adaptors in the new kerb and gutter to be provided for the site frontage.

With the scale and residential nature of the development being consistent with the existing site usage, it is
considered that the development will not impact upon pollutant generation characteristics of the site in a way that
would cause significant impacts to the water quality being discharged from the development. As a result, no
stormwater quality treatment is proposed for the development.

The roof and internal drainage system for the proposed site shall be designed to comply with:

    1. Noosa Council Planning Scheme Policy (PSP) 6 – Engineering Design Standards;

    2. The Queensland Urban Drainage Manual (QUDM); and

    3. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage.


    2.4. Flood Considerations
Review of the Noosa Council Intramaps flood layers including the Flood Hazards Overlay and Flood Inundation
Extents has identified that the site is not within a flood affected area and that no special consideration for flood
management is required for the site.




P 1300 469 707                                   E [email protected]

                                                                                                            Page 7 of 14

Page 8

STORMWATER QUALITY MANAGEMENT

    3.1. Operational Stormwater Management
The proposed development site will maintain the residential nature of the existing site and the proposed
development area results in only a small increase to the impervious area of the site, being predominately an
increase in roof area. As a small lot residential site with similar characteristics to the existing site, there are not
expected to be any significant water quality impacts during the operational phase of the site that would require
additional stormwater quality management, therefore no water quality treatment is proposed for the future
development.


    3.2. Construction Stormwater Management

        3.2.1 Erosion and Sediment Control Measures
During construction, it is necessary to manage stormwater run-off to avoid potential contamination to downstream
environments in accordance with the objectives of Appendix 2 of the SPP (DERM, July 2017), which are shown below
in Figure 3.1 SPP 2017 Construction Phase Stormwater Management Design Objectives.




                 Figure 3.1 SPP 2017 Construction Phase Stormwater Management Design Objectives

As the site area is only 500m² sediment control targets are not imposed upon the proposed development, however
best practice erosion and sediment controls shall be installed to minimise the discharge of potential contaminants
from the site in accordance with the SPP.

A site-specific erosion and sediment control plan has been prepared and is included with Proposed Development
Plans detailing the proposed treatment for erosion and sediment controls however the contractor for the
P 1300 469 707                                    E [email protected]

                                                                                                                Page 8 of 14

Page 9

development is required to assess based on local site conditions and provide for any additional controls determined
to be necessary. The erosion and sediment controls proposed for the site include:

    1. Sediment fencing downstream of the work areas within the site to prevent sediment from leaving the
       disturbed construction area.

    2. Providing a stabilised construction entry and washdown area to minimise sediment carried by construction
       vehicles from the site.

    3. Minimising disturbed areas where possible.

    4. Diverting clean upstream run-off around disturbed areas within the site.

    5. Protecting material and equipment stockpile areas with upstream diversion banks and downstream
       sediment fencing to prevent sediment transport.

    6. Providing grass filter strips within the downstream verge

    7. Ensuring any loose material tracked onto roads by construction vehicles is swept and removed from the
       access road before the end of the day.




P 1300 469 707                                 E [email protected]

                                                                                                         Page 9 of 14

Page 10

    STORMWATER QUANTITY MANAGEMENT

    3.3. Pre-post comparison
As development of a site may results in increase in peak stormwater discharges, an analysis of the existing conditions
has been carried out as well as a comparison against the proposed development conditions. The proposed
development will result in net increase to the impervious area of only 33m², with most of this increase being through
a larger roof area, therefore the analysis will quantify the impacts of this increase to the downstream receiving
environment.

The site has been modelled using the DRAINS software to assess the peak flow hydrology off the site. In accordance
with ARR2019, an Initial Loss-Continuing Loss (IL-CL) model has been used to assess the proposed development
against the ensemble of storm temporal patterns for the East Coast North region. The models have been run using
the ensemble of storm events for durations from 5 minutes to 6 hours to determine the critical storm duration and
the mean peak flowrate from the storms.

The loss parameters and temporal patterns have been imported from the ARR Datahub, and rainfall intensities have
been imported from the Bureau of Meteorology IFD rainfall data for the location. A climate change factor of 1.2 has
been applied to the rainfall data to account for the expected changes in rainfall under 2100 climate conditions. Due
to the small nature of the development, a time of concentration of a minimum 5 minutes has been considered for
the site. Details of these parameters are provided in Appendix A.

The model used for DRAINS for the site is shown below in Figure 0.1 – DRAINS Model Layout. A single catchment is
used to represent the existing site and assumed future site conditions, with comparison of these results used to
establish the impact of the development on the existing flow rates.




                                          Figure 0.1 – DRAINS Model Layout

The configuration of the catchment areas for pre-development and post development areas are shown in Figure 0.2
– DRAINS Pre-development catchments and Figure 0.3 – DRAINS Post-development catchments respectively.




P 1300 469 707                                  E [email protected]

                                                                                                          Page 10 of 14

Page 11

                              Figure 0.2 – DRAINS Pre-development catchments




                              Figure 0.3 – DRAINS Post-development catchments

The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 0.1 Existing and proposed site peak discharge rates.




P 1300 469 707                             E [email protected]

                                                                                               Page 11 of 14

Page 12

                      Table 0.1 Existing and proposed site peak discharge rates (unmitigated)

          A.E.P      Qy Pre (m3/s)     Qy Post (m3/s)     Qchange (m3/s) Qchange (%)
           63.2% AEP             0.013              0.013          0.000                              0%
             50% AEP             0.019              0.019          0.000                              0%
             20% AEP             0.023              0.023          0.000                              0%
             10% AEP             0.030              0.030          0.000                              0%
              5% AEP             0.034              0.034          0.000                              0%
              2% AEP             0.039              0.039          0.000                              0%
              1% AEP             0.042              0.043          0.001                              2%



Based on the modelling, the minor increase to impervious area from the proposed development will only result in
an increase of 1L/s for the 1% storm AEP event, being a change of only 2% The pre-post comparison found that
under all other storm events up to the 1% AEP analysed not resulting in an increase of the peak flows. As such, the
proposed development is considered to not impact the downstream receiving environment in a manner that will
alter the catchment hydrology or result in nuisance run-off that may impact downstream properties.

As peak outflows from the development are typically as per existing conditions, no stormwater attenuation is
required to control outflows from the proposed development.




P 1300 469 707                                 E [email protected]

                                                                                                       Page 12 of 14

Page 13

CONCLUSION

This Stormwater Management Report has outlined how the stormwater run-off from the site is to be managed to
comply with the relevant requirements to minimise any adverse impacts to the downstream environment.

    •   The lawful point of discharge for the proposed development will be as per existing conditions, with run-off
        from the site discharged by kerb adaptors into the Bottlebrush Avenue and/or direct connection to existing
        stormwater infrastructure.

    •   The proposed development will result in an insignificant increase compared to existing conditions and will
        retain the residential site usage of the existing lot. The stormwater quantity and quality discharging from the
        site is unlikely to change and the net impact on existing infrastructure by the proposed development is
        negligible. No operational stormwater quality controls are therefore proposed for the development.

    •   During construction, erosion and sediment control measures including sediment fencing, stabilising
        construction access, grass filter strips and diversion of clean water around disturbed areas will be provided
        as best practice management controls during the construction phase of the development.

    •   Assessment of the existing and proposed site peak flow hydrology has found that the insignificant increase
        in impervious areas does not alter the peak flow from the development for all storms up to the 1% AEP. The
        1% AEP peak outflow is increased by 1L/s however this is considered a negligible change and unlikely to
        result in nuisance impacts to downstream properties. No on-site stormwater detention is therefore
        considered necessary for the proposed development.

    •   Stormwater inlet pits will be provided for provide for drainage from the upstream catchment to ensure the
        run-off can be conveyed through proposed development without impacting upon the future usage.

    •   The proposed development has been assessed as not altering the discharge characteristics for stormwater
        quality or quantity from the site to any significant extent, and the proposed stormwater solution is considered
        appropriate for the scale and nature of the development to minimise any adverse impacts to the downstream
        environment arising from the stormwater run-off in accordance with Noosa Council requirements.




P 1300 469 707                                   E [email protected]

                                                                                                           Page 13 of 14

Page 14

REC*:R

Appendix A
DRAINS Modelling Results

P 1300 469 707 E [email protected]
Page 14 of 14

Page 15

Site Catchment Areas for DRAINS Modelling
Project number:    20220051                                         Calculations:                        M. Poynter
Street Address:    37 Bottlebrush Ave
Locality:          Noosa Heads, NSC                                 Date:                                14/10/2024


Existing Site
                                            Existing Site           Directly connected (m²)              Indirectly connected (m²)
37 Bottlebrush Ave Roof                                     199.8                               199.8                                   -
                   Impervious Ground                         64.7                                 -                                    64.7
                   Driveway                                  47.9                                47.9                                   -
                   Total Imp                                312.4
                   Total Per                                179.1
                   Site Area                                491.5                               247.7                                  64.7

% impervious                                                        Effective DCIA = 75% DCIA            ICIA +25% ineffective DCIA
                                                                                                185.78                                126.59
                   Impervious                               63.6%                                37.8%                                 25.8%
                   Pervious                                 36.4%



Proposed Site                                               22.97



                                            Proposed                Directly connected (m²)              Indirectly connected (m²)
37 Bottlebrush Ave Roof                                     222.8                               222.8                                   -
                   Impervious Ground                         96.1                                63.3                                  32.8
                   Driveway                                  26.1                                26.1                                   -
                   Total Imp                                344.9
                   Total Per                                146.5
                   Site Area                                491.5                               312.1                                  32.8

% impervious                                                        Effective DCIA = 75% DCIA            ICIA +25% ineffective DCIA
                                                                                                234.1                                 110.8
                   Impervious                               70.2%                               47.6%                                 22.6%
                   Pervious                                 29.8%

Page 16

 

 

BOM IFDs Frequent and Infrequent Storm Events

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project number: 20220051 R E ¢ > ‘2 R
Street Address: 37 Bottlebrush Ave aw
Locality: Noosa Heads, NSC Date: 14/10/2024
Source http://www bom.gov.au/ water/designRainfalls/revised-ifd/
Location: Latitude -26,397271 ow “AEP Arua! Exceedance Probably
Nearest Latitude 26.3875 (5) 3000 -
Longitude 153,0921809 vovo |. icone |
Nearest Longitude 153.0875 (E) seoe [. ~ i
—— 1%
Date obtained: 5/04/2022 1000 F- —— x» |]
750 F ~ H
Annual Exceedance |——
Probability (AEP)
Duration 63.20% SO%H 20% 10% 5% 2% 1%
in| 94] 262] 307] 349} 404] aa
146] 166] 229) 272 314) 372| 47)
137] 156] 214) 253} 292] 34a] 384]
ii] 148| 202] 238| 274) 320} 355]
125} 141] 192] 226] 258| 300] 332]
102] 115} 155} 180] 205} 235] 258}
865 97.6 ii] 153} 173} 199} 217]
755 85.2 115] 134] 152| 175] 191]
674 76.1 103} 120) 136] 157] 173}
@1| 68.9 332 109} 24) 14a} 158]
8.3 547 746 87.8 101] 117] 130]
40.6 46.1 633 749) 86.2 101] 13}
315 36| 50] 59.6 69] 813 316
263 301 22 50.6 58.9 702 7g
20.4 25 333 40.2 47.2 56.6 4
153) 18.4] 26.4 321 37.8 45.6 517
133 155 2A 273 323 39.1 44.4 af |
10.4 12.1 173 21.8 25.8 314 35.8
875 10.2] 15.1 185| 2| 26.8 30.7 osf 4
18 hour 6.82 7.99 119) 146 175] 24 245
24 hour 5.69 6.68 9.94 12.3 143 18.1 209
30 hour 4.93 5.78 8.63 10.7] 123] 159) 1833 02 poi i po
36 hour 437] 5.12 7.66 9.53 115 142 16.4 = 73450 35 = 1 73 es RP 4B 4ST
[48 hour 3.58 42 63 7.86 95 118] 133 Times hours aye
7hour 2.67 313 47 5.88 7.15 8.98 105|
96 hour 2.15 251 37 473 5.76 7.21) 8.53 Duration
120 hour 18 2.11 3.16 3.96 4.83 61 7.16
144 hour 156] 1.82] 272 341 4.16 5.24 6.15
168 hour 138! Tell 24 3 365 459 5,37 ©Copyright Commonwealth of Australia 2016, Bureau af Meteorology (ABN 92 637 533 532)

 

 

 

 

 

 

 

 

 

 

 

Page 17

ARR Datahub Parameters
Project number:  20220051
Street Address:  37 Bottlebrush Ave
Locality:        Noosa Heads, NSC     Date:   14/10/2024

Page 18

Median Preburst Depths and Ratios
Values are of the format depth (ratio) with depth in mm

min (h)\AEP(%) 50
60 (1.0) 34
(0.073)
90 (1.5) 76
(0.140)
120 (2.0) 19.1
(0.316)
180 (3.0) 219
(0.311)
360 (6.0) 216
(0.233)
720 (12.0) 20.4
(0.166)
1080 (18.0) 13.3
(0.092)
1440 (24.0) 39
(0.024)
2160 (36.0) 24
(0.012)
2820 (48.0) 00
(0.000)
4320 (72.0) 00
(0.000)

Interim Climate Change Factors

2030

2050

g 3 3

RCP 4.5
0.869 (4.3%)
1.057 (5.3%)
1.272 (6.4%)
1.488 (7.5%)
1.8676 (8.5%)
1.810 (9.2%)

1.862 (9.5%)

20 10
68 o4
(0.108) (0.122)
18 147
(0.158) (0.164)
21.5 234
(0255) (0.228)
25.4 278
(0.254) (0.230)
47.4 644
(0.353) (0.393)
41.2 54.9
(0.228) (0.247)
377 53.9
(0.177) (0.204)
224 34.2
(0.093) (0.116)
165 26.0
(0.060) (0.076)
02 152
(0.031) (0.041)
37 62
(0.011) (0.015)

RCPS

0.783 (3.9%)
1.014 (5.1%)
1.236 (6.2%)
1.458 (7.4%)
1.691 (8.6%)
1.944 (9.9%)
2.227 (11.5%)

13
(0.131)

174
(0.168)

247
(0.209)

30.0
(0.212)

808
(0.417)

68.1
(0.258)

69.4
(0.220)

459
(0.129)

35.2
(0.085)

212
(0.046)

86
(0.017)

132
(0.130)

193
(0.157)

23.2
(0.165)

735
(0.433)

114.0
(0.486)

991
(0.308)

102.0
(0.265)

95.4
(0.219)

656
(0.128)

428
(0.086)

137
(0.021)

RCP 8.5
0.983 (4.9%)
1.348 (6.8%)
1.773 (9.0%)
2.237 (11.5%)
2.722 (14.2%)
3.209 (16.9%)

3.679 (19.7%)

146
(0.129)

207
(0.151)

220
(0.140)

1062
(0.553)

138.8
(0.521)

1223
(0.332)

126.5
(0.286)

1326
(0.265)

883
(0.149)

605
(0.105)

176
(0.023)

Page 19

DRAINS Modelling Results
Project number:       20220051                                                                   Calculations:        M. Poynter
Street Address:       37 Bottlebrush Ave
Locality:             Noosa Heads, NSC                                                           Date:                14/10/2024




Pre / Post Comparison
A.E.P                Qy Pre (m3/s)             Qy Post (m3/s)           Qchange (m3/s)           Qchange (%)
          63.2% AEP                    0.013                    0.013                    0.000                   0%
           50% AEP                     0.019                    0.019                    0.000                   0%
           20% AEP                     0.023                    0.023                    0.000                   0%
           10% AEP                     0.030                    0.030                    0.000                   0%
             5% AEP                    0.034                    0.034                    0.000                   0%
             2% AEP                    0.039                    0.039                    0.000                   0%
             1% AEP                    0.042                    0.043                    0.001                   2%

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Report.PDF · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.