Council archive · source document
Stormwater Management Report · MCU22/0087.01
DRAINS Modelling Results Project number: 20220051 Calculations: M. Poynter Street Address: 37 Bottlebrush Ave Locality: Noosa Heads, NSC Date: 14/10/2024 Pre / Post Comparison A.E.P Qy Pre (m3/s) Qy Post (m3/s) Qchange (m3/s) Qchange (%) 63.2% AEP 0.013 0.013 0.000 0% 50% AEP 0.019 0.019 0.000 0% 20% AEP 0.023 0.023 0.000 0% 10% AEP 0.030 0.030 0.000 0% 5% AEP 0.034 0.034 0.000 0% 2% AEP 0.039 0.039 0.000 0% 1% AEP 0.042 0.043 0.001 2%
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Report.PDFRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.