Stormwater Management Report · MCU22/0087.01

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

development is required to assess based on local site conditions and provide for any additional controls determined
to be necessary. The erosion and sediment controls proposed for the site include:

    1. Sediment fencing downstream of the work areas within the site to prevent sediment from leaving the
       disturbed construction area.

    2. Providing a stabilised construction entry and washdown area to minimise sediment carried by construction
       vehicles from the site.

    3. Minimising disturbed areas where possible.

    4. Diverting clean upstream run-off around disturbed areas within the site.

    5. Protecting material and equipment stockpile areas with upstream diversion banks and downstream
       sediment fencing to prevent sediment transport.

    6. Providing grass filter strips within the downstream verge

    7. Ensuring any loose material tracked onto roads by construction vehicles is swept and removed from the
       access road before the end of the day.




P 1300 469 707                                 E [email protected]

                                                                                                         Page 9 of 14

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Report.PDF · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.