development is required to assess based on local site conditions and provide for any additional controls determined
to be necessary. The erosion and sediment controls proposed for the site include:
1. Sediment fencing downstream of the work areas within the site to prevent sediment from leaving the
disturbed construction area.
2. Providing a stabilised construction entry and washdown area to minimise sediment carried by construction
vehicles from the site.
3. Minimising disturbed areas where possible.
4. Diverting clean upstream run-off around disturbed areas within the site.
5. Protecting material and equipment stockpile areas with upstream diversion banks and downstream
sediment fencing to prevent sediment transport.
6. Providing grass filter strips within the downstream verge
7. Ensuring any loose material tracked onto roads by construction vehicles is swept and removed from the
access road before the end of the day.
P 1300 469 707 E [email protected]
Page 9 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Report.PDFRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.