Council archive · source document
Development Application Part 1 of 2 - IDAS Forms 1 and 6 - OPW13/0425
p,= b~,"d,h,co
I
s\~\I~\~\~\[\~ \i~ru~\i\i\ \~
80671385 ~
I
~ -\.!JJ
THIS IS THE FIRST PART OF A
MULTIPLE PART RECORD
~cklisJ:\ Part _l_ Of ~.
(Please Circle)
Application number: DAN \ ~ IOlfd-S
I
Part Record Co\’er Sheel FIRST PART do
T.U&AMIBCS IAMIINFORMATION MANAGEMENTlRECORDS MANAGEMENTlControl of RecordslEDRMSIMulli
Ie 2140l-~ 1<=8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
Deve!opITlcnt Counter
IDAS form 1-Application detail~) 29 MAY 2013
(Sustainable Planning Act 2009 version 2.0 effective 17 December 2012)
Tewantin
This form must be used for ALL development applications.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
. complete this form (IDASform 1-Application cletails)
.
complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning
Regulation 2009.
This form and any other IDAS form relevant to your application must be used for development applications relating to
strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
use plan for the strategic port land, Brisbane core port land or airport land.
PLEASE NOTE: This form is not required to accompany requests for compliance assessment.
This form can also be completed online using eDA at www.smartedaqld.gov.au
I Mandatory requirements
Applicant details (Note:the applicant is the person responsible for making the application and need not be the owner
of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct.
Any development permit or preliminary approval that may be issued as a consequence of this application will be issued
to the applicant.)
Name/s (individual or company name in full)
I Noosa Jetty Builders
For companies, contact name
I Danny Reed
Postal address Po Box 299
Noosaville
Suburb Noosaville
State QLD Postcode 14566
Country (if other than Australia)
Page 3
Contact phone number
I 0408137526
Mobile number (non-mandatory requirement)
Fax number (non-mandatory requirement)
e-mail address (non-mandatory requirement)
I [email protected]
Applicant’s reference number (non-mandatory
requirement)
1. What is the nature of the development proposed and what type of approval is
being sought?
Table A-Aspect 1 of the application (Ifthere are additional aspects to the application
please list in Table B-Aspect 2.)
a) What is the nature of the development? (Please only tick one box.)
o Material change of use 0Reconfiguring a lot 0Building work Ox Operational work
b) What is the approval type? (Please only tick one box.)
o Preliminary approval o Preliminary approval X Development permit
under s241 of SPA under s241 and s242
of SPA
c) Provide a brief description of the proposal, including use definition and number of
buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
I Ti mber jetty
d) What is the level of assessment? (Please only tick one box.)
o Impact assessment o Code assessment
Table B-Aspect 2 of the application (Ifthere are additional aspects to the
application please list in Table C-Additional
aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
o Material change of use 0Reconfiguring a lot 0Building work xD Operational work
b) What is the approval type? (Please only tick one box.)
o Preliminary approval o Preliminary approval xD Development
under s241 of SPA under s241 and s242 permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of
buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
d) What is the level of assessment?
Page 4
o Impact assessment o Code assessment
Table C-Additional aspects of the application (If there are additional aspects to the
application please list in a
separate table on an extra page and attach to this form.)
o Refer attached schedule 0Not required
2. Is the application for a mobile and temporary environmentally relevant activity
(ERA)?
xD No-continue to question 3
o Yes-complete Table D and then go to question 6
Table D-name of each local government area in which the mobile and temporary ERA is
proposed to operate
3. Location of the premises (Complete Table E and/or Table F as
applicable. Identify each lot in a separate row.)
Table E-street address and lot on plan for the premises or street address and lot on
plan for the land adjoining or
adjacent to the premises. (Note:this table is to be used for applications involving taking or interfering with water).
(Attach a separate schedule if there is insufficient space in this table.)
0 Street address and lot on plan (All lots must be listed.)
0 Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed)
Street address Lot on plan Local government area
description (e.g. Logan, Cairns)
Lot Unit Street Street name and offICial Post- Lot no. Plan type
no. no. suburb/locality name code and plan no.
i) 37 Masthead Quay, 4566 608 RP883862 Sunshine Coast
Noosaville
ii)
iii)
Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a
separate row in the below table. Non-mandatory.)
Lot Applicable zone I precinct Applicable local plan I precinct Applicable overlay/s
i)
ii)
iii)
3
IDAS form 1-Applicafion details
Version 2.017 December 2012
Page 5
Table F-premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.)(Attach a separate schedule if there is insufficient
space in this table.)
Coordinates Zone Datum Local government
(Note:place each set of coordinates in a separate row.) reference area (if applicable)
Easting Northing Latitude Longitude
0 GDA94
0 WGS84
0 other
4. Total area of the premises on which the development is proposed Qndicate
square metres)
646m2
5. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm
etc.)
House
6. Are there any current approvals (e.g.a preliminary approval) associated with this
application? (Non-
mandatory requirement.)
x No D Yes-provide details below
List of approval reference/s Date approved (ddlmm/yy) Date approval lapses (dd/mmtyy)
7. Is owner’s consent required for this application? (Referto notes at the end of this form for more
information.)
X No
D Yes-complete either Table G, Table H or Table I as applicable
Table G
Name of ownerls of the land
INVe,the above-mentioned ownerls of the land, consent to the making of this application.
Signature of ownerls of the land
Date
Table H
Name of ownerls ofthe land
I
D The owner’s written consent is attached or will be provided separately to the assessment manager
Table I
I Name of ownerls of the land
4
IDAS form 1-Applicafion details
Version 2.017 December 2012
Page 6
o By making this application, I, the applicant, declare that the owner has given written consent to the making of the
application.
8. Does the application involve a State resource? (E.g.the application involves taking water or
quarry material, or
interfering with the flow of water. Refer to the notes at the end of this form for more information) (Non-mandatory
requirement.)
X No o Not identified whether or 0 Yes---complete Table J
o not the application
involves a State
resource
Table J
Nature of State-owned resource (if identified)
9. IdentifY if any ofthe following apply to the premises (Tick applicable boxles.)
X Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)---complete Table K
o
o On strategic port land under the Transport Infrastructure Act 1994-complete Table L
o In a tidal water area---complete Table M
o On Brisbane core port land under the Transport Infrastructure Act 1994 (notable
requires completion)
D On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (notable
requires completion)
Table K
Name of water body, watercourse or aquifer
Noosawaters
Table L
Lot on plan description for strategic port land Port authority for the lot
Table M
Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
10. Are there any existing easements on the premises? (e.g.for vehicular
access, electricity, overland flow, water
etc.)
X No 0 Yes-ensure the type, location and dimension of each easement is included in the plans submitted
o
11. Does the proposal include new building work or operational work on the
premises? (Including any services.)
5 IDAS form 1-Applicafion details
Version 2.017December 2012
Page 7
D No X Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
D
12. Is the payment of a portable long service leave levy applicable to this application?
(Refer to notes at the end
of this form for more information.)
X No-go to question 14 DYes
D
13. Has the portable long service leave levy been paid? (Refer to notes at the end of this form for more
information.)
D No
D Yes~omplete Table N and submit with this application the yellow local government/private certifier’s copy ofthe
receipted QLeave form
Table N
Amount paid Date paid QLeave project number (6digit number starting with A, S, E, L or P)
(dd/mm/yy)
14. Has the local government agreed to apply a superseded
planning scheme to this application under section
96 of the Sustainable Planning Act 20091
X No
D
D Yes-please provide details below
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
(dd/mmlyy)
15. List below all of the forms and supporting information that
accompany this application (Include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA.)
Description of attachment or title of attachment Method of lodgement to
assessment manager
Form 6
Checklist
16. Applicant’s declaration
6 IDAS form 1-Applicafion details
Version 2.0 17December 2012
Page 8
xD By making this application, I declare that all information in this application is true and correct (Note:it is unlawful to
provide false or misleading information.)
Notes for completing this fonn
Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a
properly made application.
Note, the assessment manager has discretion to accept an application as properly made despite any non-
compliance with the requirement to provide mandatory supporting information under section 260(1 Xc) of the
Sustainable Planning Act 2009.
Question 7
Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is
required for
anapplication. Section 260(1 )(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is
required under section 263,then an application must contain, or be accompanied by, the written consent ofthe
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
Owner’s consent is not required for a mobile and temporary ERA.
Question 8
If a development application involves a State resource, the application is not required to be
supported by evidence
of resource entitlement. The allocation or entitlement to the resource is a
separate process and should be obtained
prior to development commencing.
Question 12
The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the
portable long
service leave levy is payable.
The portable long service leave levy amount and other prescribed
percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 13
The portable long service leave levy need not be paid when the application is made, but the
Building and
Construction Industry (Portable Long Service Leave)Act 1991 requires the levy to be
paid before a development
permit is issued.
Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For
further information contact QLeave on 1800803481 or visit
www.qleave.qld.gov.au.
Privacy-The information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP),assessment manager, referral
agency and/or building certifier in accordance with the
processing and assessment of your application. Your personal details will not be disclosed for a purpose outside of the
IDAS process, except where required by legislation (including the
Right to Information Act 2009)
or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained
as
required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To Council. I have been engaged as the private certifier for the
building work referred to in this application
Date of engagement BSA Certification license Building
Name
number classification/s
7
IDAS form 1-App/icafion details
Version 2.0 17December 2012
Page 9
QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if
applicable.)
Date receipted
QLeave project Amount paid form sighted by Name of officer who
Description of the work Date paid
number ($) assessment sighted the form
manager
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agencies.
8 IDAS form 1-Applicafion details
Version 2.017 December 2012
Page 10
..
Development Counter
Z 9 MAY 1013
IDAS form 6-Building or opera.
against a planning scheme
(Sustainable Planning Act 2009 version 2.0 effective 17 December 2012)
This form must be used for development applications for building work or operational work assessable against a
planning scheme.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
. complete IDAS form 1-App/ication details
. complete any other forms relevant to your application
. provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form must be used for building work or operational work relating to strategic port land and Brisbane core port land
under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008. Whenever a planning scheme is mentioned, take it to mean land use plan for the strategic port land, Brisbane
core port land or airport land.
This form can also be completed online using eDA at www.smarteda.qld.gov.au
I Mandatory requirements
1. What is the nature ofthe work that requires assessment against a planning scheme? (Tick applicable boxles.)
xD Building work-complete Table A o Operational work-complete Table B
Table A
a) What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?
I Timber jetty
b) Are there any current approvals associated with this application? (e.g. material change of use.)
xD No 0 Yes- provide details below
List of approval reference/s Date approved (ddlmmlyy) Date approval lapses (ddlmmtyy)
Page 11
J
Table B
a) What is the nature of the operational work made assessable in the planning scheme? (Tick applicable boxles.)
D Road works D Stormwater D Water infrastructure
D Drainage works D Earthworks D Sewerage infrastructure
D Landscaping D Signage D Clearing vegetation under the planning scheme
D Other-provide details I Jetty
b) Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
X No D Yes-specify the number of lots being created
D
c) Are there any current approvals associated with this application? (E.g. material change of use.)
X No D Yes-provide details below
D
List of approval reference/s Date approved (ddlmm/yy) Date approval lapses (dd/mm/yy)
2. What is the dollar value of the proposed building work? (Inc GST, materials and labour.) $14000.00
3. What is the dollar value of the proposed operational work? (Inc GST, materials and $
labour.)
4. Confirm that the following mandatory supporting information accompanies this application
Mandatory supporting information Confirmation of Method of
lodgement lodgement
All applications involving building work and/or operational work
A site plan drawn to an appropriate scale (1:100, 1 :200 or 1 :500are
xD Confirmed
recommended scales) which shows the following:
. the location and site area of the land to which the application relates
(relevantland)
. the north point
. the boundaries of the relevant land
. the allotment layout showing existing lots, any proposed lots (including the
dimensions ofthose lots), existing or proposed road reseNes, building
envelopes and existing or proposed open space (note:numbering is
required for all lots)
.
any existing or proposed easements on the relevant land and their
function
.
any access limitation strips
. all existing and proposed roads and access points on the relevant land.
2 /DAS fonn 6-Building or operational work assessable against a planning scheme
Vers n2.0 17December 2012
Page 12
.6.
A statement about how the proposed development addresses the local D Confirmed
government’s planning schemes and any other planning documents relevant
to the application.
Applications for building work (including extensions and assessable demolition)
Floor plans drawn to an appropriate scale (1:50, 1:100 or 1 :200 are D Confirmed
recommended scales) which show the following:
D Not applicable
. the north point
the intended use of each area on the floor plan (for commercial, industrial
or mixed use developments only)
. the room layout (for residential development only) with all rooms clearly
labelled
the existing and the proposed bui It form (for extensions only)
the gross floor area of each proposed floor area.
Elevations drawn to an appropriate scale (1:100, 1 :200 or 1 :500 are D Confirmed
recommended scales) which show plans of all building elevations and
facades,clearly labelled to identify orientation (e.g. north elevation).
D Not applicable
Plans showing the size, location, proposed site cover, proposed maximum D Confirmed
number of storeys, and proposed maximum height above natural ground level
of the proposed new building work.
D Not applicable
Plans showing the extent of any assessable demolition. D Confirmed
D Not applicable
Applications for operational work involving earthworks (filling and excavating)
drawings showing: D Confirmed
existing and proposed contours D Not applicable
.areas to be cut and filled
the location and level of any permanent survey marks or reference
stations used as datum for the works
the location of any proposed retaining walls on the relevant land and their
height
. the defined flood level (if applicable)
. the defined fill level (if applicable).
Applications for operational work involving roadworks
Drawings showing: D Confirmed
.
existing and proposed contours D Not applicable
the centreline or construction line showing chainages, bearings, offsets if
the construction line is not the centreline of the road and all intersection
points
information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)
kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
edge of pavement where kerb is not constructed
position and extent of channelisation
location and details of all traffic signs, guideposts, guardrail and other
street furniture
pavement markings including details on raised pavement markers
catchpit, manhole and pipeline locations
drainage details (if applicable)
cross road drainage culverts (if applicable)
3 IDAS f0ffT16-B uilding or operational work assessable against a planning scheme
Version 2.0 17 December 2012
Page 13
. concrete footpaths and cycle paths
. location and details for access points, ramps and invert crossings
.
changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing: D Confirmed
.
existing and proposed contours D Not applicable
.
drainage locations, diameters and class of pipe, open drains and
easements
. manhole location, chainage and offset or co-ordinates and inlet and outlet
invert levels
. inlet pit locations, chainage and offset or co-ordinates and invert and kerb
levels.
Applications for operational work involving water reticulation
Drawings showing: D Confirmed
. kerb lines or edge of pavement where kerb is not constructed
D Not applicable
. location and levels of other utility services where affected by water
reticulation works
. pipe diameter, type of pipe and pipe alignment
. water main alignments
. water supply pump station details Of applicable)
. minor reservoir details Of applicable)
. conduits
. location of valves and fire hydrants
. location of house connections (if applicable)
. location of bench marks and reference pegs.
Applications for operational work involving sewerage reticulation
Drawings showing:
. location of all existing and proposed services
D Confirmed
. location of all existing and proposed sewer lines and manhole locations D Not applicable
. location of all house connection branches
.kerb lines or edge of pavement where kerb is not constructed
.
chainages
.
design sewer invert levels
.
design top of manhole levels
.
type of manhole and manhole cover
.
pipe diameter, type of pipe and pipe alignment
. location of house connections (if applicable)
.sewer pump station details (if applicable).
Applications for operational work involving street lighting
Drawings showing:
. location of all light poles and service conduits
D Confirmed
. location of all other cross road conduits D Not applicable
. type of wattage and lighting
.
any traffic calming devices
. additional plans for roundabouts and major roads (if applicable)
. details of any variations to normal alignment
. details of lighting levels.
Applications for operational work involving public utility services
Drawings showing:
D Confirmed
.
any existing light poles and power poles
.
any existing underground services
D Not applicable
4 IDAS form 6-Buildmg or operational work assessable agamst a planmng scheme
Version 2.017 December 2012
Page 14
. details of proposed services
. alternation to existing services.
Applications for operational work involving landscaping works
Drawings showing:
D Confirmed
. the location of proposed plant species
.a plant schedule indicating common and botanical names, pot sizes and
D Not applicable
numbers of plants
.
planting bed preparation details including topsoil depth, sub grade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
. the location and type of any existing trees to be retained
. construction details of planter boxes, retaining walls and fences
. the proposed maintenance period
.
irrigation system details.
Privacy-Please refer to your assessment manager, referral agency and/or building certifier for further details on the use
of information recorded in this form.
OFFICE USE ONLY
Date received Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and Planning.
This form and all other required application materials should be sent to your assessment manager and any referral
agencies.
5 IDAS form 6-Building or operational work assessable against a planning scheme
Version 2.0 17December 2012
Page 15
..
~’
111111 Integrated Development Assessment System Checklist ,
Development assessment checkli
Devell’"’,Y’\"",,",,-:\’~i1-
.....,.,--’. I"",,!
i
r ~1’
’~lt""’r
......~....I. ~
checklist 1 I..
(Sustainable Planning Act 2009, version 1.0 18 December 2009) Z 9 MAY Z013
This checklist applies to the carrying out of development generally.
T.j.’
You are not required to complete this checklist as part of your developm nt application, n~~g.Qd ~ay submit the
checklist with your application if you wish. The purpose of the checklist is 0 assls you In 1 en ling:
whether you need to make a development application for the proposed development
if a development application is required, the relevant IDAS forms you need to complete as part of your application
whether you need to give a copy of your application to any referral agencies.
If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use IDAS checklist 2, Reconfiguring a lot IDAS checklist 3or Operational
- -
works IDAS checklist 4, as applicable.
-
If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning’s website at www.dip.gld.gov.au.
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Ipart 1 General questions
-
1.1 Have you received a referral agency response in relation to this proposed development prior to making
an application?
I8]No
. To assist you in preparing your application, completing Referral agency responses -IDAS checklist
DYes
6 is recommended
1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?
18] No
. You must complete Request to apply a superseded planning scheme -
Sustainable Planning Act
DYes form 2 and give this notice to the relevant local government. If the local govemment agrees to
your request, details must be provided in Application details -
IDAS form 1
1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 20001
[gJNo
DYes . It is recommended that you complete part 2 of this checklist
1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
the Queensland Heritage Act 1992?
[gJ No
DYes . It is recommended that you complete part 3 of this checklist
Department of Infrastructure and Planning OPlan ,,’ ~l\’\.: Queensland
.’
1_\" Government
Page 16
DDD
1.5 Does the proposal involve development on a local heritage place?
~No
DYes . It is recommended that you complete part 4 of this checklist
1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA,a mining
activity or a chapter SA activity?
~No
DYes . It is recommended that you complete part 5 of this checklist
1.7 Is any part of the development on strategic port land or airport land (otherthan development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)
181 No
DYes . It is recommended that you complete part 6 of this checklist
1.8 Is any part of the development on land below a high water mark within the limits of a port under the
Transport Infrastructure Act 1994?
~No
DYes . It is recommended that you complete part 7 of this checklist
1.9 Is any part of the premises designated for community infrastructure?
~No
DYes . It is recommended that you complete part 8 of this checklist
1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?
~No
DYes . It is recommended that you complete part 9 of this checklist
1.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 1994?
181 No
DYes . It is recommended that you complete part 10 of this checklist
Privacy -
please refer to your assessment manager for further details on the use of information recorded in
this checklist.
Disclaimer:
While the Department of Infrastructure and Planning (DIP)believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.
Development application assessment checklist -
IDAS checklist 1
Version 1.018 December 2009
Page 17
.
.
DDD
OFFICE USE ONLY
Date received I Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.
Development application assessment checklist -
IDAS checklist 1
Version 1.0 18 December 2009
Used in these records
Development Application Part 1 of 2 - IDAS Forms 1 and 6 - OPW13/0425Related documentApplication case desk ↗
About this file
- File size
- 9.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.