Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Development Application Part 1 of 2 - IDAS Forms 1 and 6 - OPW13/0425

of 17

Text shows just the words. Original shows the document exactly as it was published.

    xD By making this application, I declare that all information in this application is true and correct (Note:it is unlawful to
    provide false or misleading information.)


Notes for completing this fonn


      Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a
                                                                                           properly made application.
      Note, the assessment manager has discretion to accept an application as properly made despite any non-
      compliance with the requirement to provide mandatory supporting information under section 260(1 Xc) of the
      Sustainable Planning Act 2009.


Question 7
      Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is
                                                                                                               required for
      anapplication. Section 260(1 )(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is
     required under section 263,then an application must contain, or be accompanied by, the written consent ofthe
     owner, or include a declaration by the applicant that the owner has given written consent to the making of the
     application.
     Owner’s consent is not required for a mobile and temporary ERA.


Question 8
     If a development application involves a State resource, the application is not required to be
                                                                                                   supported by evidence
     of resource entitlement. The allocation or entitlement to the resource is a
                                                                                 separate process and should be obtained
     prior to development commencing.

Question 12
     The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the
                                                                                                                 portable long
     service leave levy is payable.
     The portable long service leave levy amount and other prescribed
                                                                          percentages and rates for calculating the levy
     are   prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 13
     The portable long service leave levy need not be paid when the application is made, but the
                                                                                                       Building and
     Construction Industry (Portable Long Service Leave)Act 1991 requires the levy to be
                                                                                                 paid before a development
     permit is issued.
     Building and construction industry notification and payment forms are available from any Queensland post office or
     agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For
     further information contact QLeave on 1800803481 or visit
                                                                      www.qleave.qld.gov.au.


Privacy-The information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP),assessment manager, referral
                                                      agency and/or building certifier in accordance with the
processing and assessment of your application. Your personal details will not be disclosed for a purpose outside of the
IDAS process, except where required by legislation (including the
                                                                  Right to Information Act        2009)
                                                                                                 or as         required by
Parliament. This information may be stored in relevant databases. The information collected will be retained
                                                                                                                       as
required by the Public Records Act 2002.


OFFICE USE ONLY

 Date received                                              Reference numbers


NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To                                                         Council. I have been engaged as the private certifier for the
                                                           building work referred to in this application


Date of engagement                                                      BSA Certification license           Building
                          Name
                                                                        number                              classification/s




7
                                                                                                    IDAS form 1-App/icafion details
                                                                                                      Version 2.0 17December 2012

Used in these records

About this file

File size
9.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 1 of 2 - IDAS Forms 1 and 6 - OPW13_0425.pdf · 9.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.