Council archive · source document
Attachment 7 - Economic Need and Impact Assessment · MCU13/0251
Table 4.6: Market Share Analysis, Proposed Specialty, 2015-21 ($M, 2013 dollars)
Contribution 2015 2017 2019 2021
to turnover
Trade area market share 9.5% $1.96 $2.02 $2.08 $2.14
Non-trade area expenditure (% of turnover) 17.5% $0.42 $0.43 $0.44 $0.45
Total - $2.38 $2.45 $2.52 $2.59
Source: Economic Associates estimates
4.3 Overall Centre Performance
Table 4.7 below summarises the anticipated overall centre performance based on the combined
performance of the limited line supermarket and specialty tenancies. Centre turnover is expected
to be approximately $10.75 million in the first full year of trade (2015), increasing to $11.73
million in 2021.
Based on a gross lettable area of 1,593m2, the centre is expected to achieve a sales productivity of
approximately $6,750/m2 in its first full year of trade (2015), increasing to approximately
$7,350/m2 in 2021 (assuming no new additions to the centre’s network).
Based on these trading levels the proposed centre would trade consistently with benchmark
trading levels for recently established neighbourhood scale centres (i.e. between $6,000/m2 and
$7,000/m2).
Table 4.7: Overall Centre Performance, 2015-21 ($M, 2013 dollars)
Contribution 2015 2017 2019 2021
to turnover
Trade area penetration (% of total 16.8% $8.87 $9.14 $9.41 $9.68
available retail expenditure)
Non-trade area expenditure 17.5% $1.88 $1.94 $2.00 $2.05
Total - $10.75 $11.08 $11.41 $11.73
Peregian Village Market Economic Need and Impact Assessment 22
December 2013 13034 Report Rev 0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7 - Economic Need and Impact AssessmentRelated documentApplication case desk ↗
About this file
- File size
- 805 KB (small file)
- File type
No other editions are linked here.