SITE-BASED STORMWATER
   MANAGEMENT PLAN

     In Association with the
  Reconfiguration of a Lot for the
      Proposed Subdivision
                 at

            Noosa Civic
  28 Eenie Creek Road, Noosaville
        Lot 3 on SP246584
                 for

         Stockwell Pty Ltd




                             Ref: 1856-SBSMP-01_Version 5.0
                                            December 2019
Full text of the other 48 pages

Page 2

DOCUMENT INFORMATION

   Document Title:                                  Site-Based Stormwater Management Plan


   Document Reference No.                           1856-SBSMP-01 – Version 5.0


   Commissioned By:                                 Stockwell Pty Ltd


   Prepared By:                                     Barlow Shelley Consulting Engineers Pty Ltd


   Author:                                          Vincent Vicic (BEng, GradIEAust)


   Reviewed & Authorised By:                        Cameron Landreth (BEng (Hons), NER, RPEQ)


DOCUMENT CONTROL

        Version                         Date                           Author                       Reviewer


           1.0                  8th March, 2019                    Vincent Vicic             Cameron Landreth


           2.0                   17th April, 2019                  Vincent Vicic             Cameron Landreth


           3.0                   15th May, 2019                Cameron Landreth              Cameron Landreth


           4.0              25th September, 2019               Cameron Landreth              Cameron Landreth


           5.0               2nd December, 2019                Cameron Landreth              Cameron Landreth


“©2019 Barlow Shelley Consulting Engineers Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
document belongs to Barlow Shelley Consulting Engineers Pty Ltd and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media to any person without the prior written consent
of Barlow Shelley Consulting Engineers Pty Ltd”

Page 3

EXECUTIVE SUMMARY

Barlow Shelley Consulting Engineers Pty Ltd has been commissioned by Stockwell Pty Ltd
to undertake a Site Based Stormwater Management Plan (SBSMP) for the proposed
subdivision development at Lot 3 on SP246584 Eenie Creek Road, Noosaville,
Queensland. An assessment of the stormwater quality requirements has been carried out
in accordance with the Noosa Council Planning Scheme 2017.


Stormwater quality improvement devices (SQIDs) are proposed to treat the road reserve,
which is greater than 2,500 m2, therefore pollutant reduction targets must be met as per
the Noosa Council Planning Scheme (2017) and Qld SPP (2017). A treatment train
consisting of bioretention systems and a vegetated swale are proposed to mitigate pollutant
load to meet the WSUD pollutant load reduction targets. The total bioretention filter area is
243m2 and the total swale length is 20m. The bioretention systems are situated in the road
reserve or proposed drainage reserve and will be designed in accordance with the WSUD
technical guidelines. When the individual lots created by this proposed subdivision are
developed, they will require SQIDs to satisfy stormwater runoff pollutant removal targets.


Updates to the MUSIC model parameters have been included in this version of the report.
Modelling that includes the treatment of stormwater from pavement and a bushfire access
track to the rear of Lots 11-15 is also included, as well as minor updates to catchments and
stormwater management strategy resulting from ongoing design development.
For ease of reference, any changes to the previous report are made in red text.

Page 4

CONTENTS


1.0    INTRODUCTION..................................................................................................... 1

2.0    SITE DESCRIPTION ............................................................................................... 2

3.0    PROPOSED DEVELOPMENT ................................................................................ 3

4.0    STORMWATER QUALITY MANAGEMENT ........................................................... 4
 4.1      CONSTRUCTION PHASE .................................................................................. 5
 4.2      OPERATIONAL PHASE ..................................................................................... 7
 4.3      MUSIC Modelling ............................................................................................. 10

5.0    CONCLUSION ...................................................................................................... 19

6.0    LIMITATIONS OF THIS REPORT......................................................................... 20

7.0    REFERENCES...................................................................................................... 21

8.0    CLOSURE ............................................................................................................ 22

Page 5

APPENDICES

APPENDIX A   -   Preliminary Plans by Barlow Shelley Consulting Engineers

APPENDIX B   -   Stormwater Quality Objectives – Construction Phase

Page 6

1.0 INTRODUCTION

Barlow Shelley Consulting Engineers Pty Ltd was commissioned by Stockwell Pty Ltd to
prepare a Site Based Stormwater Management Plan (SBSMP). The plan relates to the
proposed subdivision development located on Lot 3 on SP246584 Eenie Creek Road,
Noosaville, Queensland (Refer to Figure 1.1 – Locality map of the site).




                                            Lot 3 SP246584




                                       Figure 1.1 Locality map of site




Site Based Stormwater Management Plan                                      Page 1 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 7

2.0 SITE DESCRIPTION

The site is legally described as, Lot 3 on SP246584 Eenie Creek Road, Noosaville,
Queensland. It lies within the Local Government area of Noosa Council. Figure 2.1 below
shows the proximity of the site to Noosa Heads, and is approximately 5km to the South-
West of Noosa Heads.




                                                                                 Noosa Heads




                                                    Noosa Civic
                                                     Noosaville
                                                Property boundary
                                                Area = 31.7297 ha


                                 Figure 2.1 Aerial image of site in Noosaville



The site has a total area of 31.7297ha and is developed as Noosa Civic, and vegetated with
existing bushland. The site is zoned as Open Space Conservation and Shire Business
Centre (SBC). The site is surrounded by similar zoned properties.




Site Based Stormwater Management Plan                                                          Page 2 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 8

3.0 PROPOSED DEVELOPMENT

The proposed development consists of 25 lots. An internal road services the proposed lots.


The proposed development will comprise the construction and/or installation of the following
components for land use purposes:


 · site earthworks and buildings (future)
 · access driveway and car parks
 · stormwater drains
 · other ancillary services
 · landscaping.


Once the development has been completed, all disturbed portions of the site will be
rehabilitated or covered by some form of protection against soil erosion and the
transportation of suspended solids from the site. These improvements will include
structures, paved areas and landscaping.




Site Based Stormwater Management Plan                                           Page 3 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 9

4.0 STORMWATER QUALITY MANAGEMENT

This Site Based Stormwater Management Plan includes Stormwater Quality Management
guidelines for the construction phase of the development. The development will implement
stormwater quality management for construction and operational phases as per Qld SPP
(2017), Council’s PSP, and the Water Sensitive Urban Design (WSUD) Technical Manual
by Healthy Waterways. The efficiency of the Stormwater Quality Improvement Devices
(SQID’s) during operational phase have been assessed with a MUSIC model as outlined in
Section 4.3 of this report. Refer to the Stormwater Management Layout in Appendix A
showing the catchment boundaries and treatment nodes proposed for the development.


The proposed allotments remain vacant as part of the subdivision development. Given the
proposed use of the allotments, development of each lot would trigger a Material Change
of Use application. Each future development shall provide its own SQID's to satisfy
stormwater runoff pollutant removal targets for the specific lot. The SQID's modelled with
this report are to address stormwater runoff from the road reserves only.


This version of the Stormwater Quality Management Plan has been updated to include the
proposed bushfire access driveway and parking either side along the back of Lots 12-15.
These pavements will be introduced with the subdivision works so the stormwater
MUSIC model has been updated to include SQIDs to treat these impervious portions of the
lot only.


It is suggested, as discussed with Council representatives, that a property notation be
applied to these Lots (11-15) to clarify the function of this bioretention basin that would be
present at the rear of these lots. The property notation will also identify that lots with an area
less than 2,500m2 would also be required to provide stormwater quality treatment, whereas
the Qld SPP(2017) normally excludes a lot of this size from application of the design targets.
The proposed notation reads as follows:
        A stormwater quality management plan will be required as part of any
        submission to the Local Council. This management plan will address
        treatment of stormwater runoff from the proposed development footprint in
        accordance with the design pollutant removal targets in the Qld State
        Planning Policy (2017) and the Noosa Plan.
        <Additional wording for Lots 12-15>
        The bioretention basin at the rear of this lot is designed to treat the existing
        hardstand pavement area only, as provided with the greater subdivision
        works.


Site Based Stormwater Management Plan                                                 Page 4 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 10

4.1 CONSTRUCTION PHASE

4.1.1 Pollutants

Typical pollutants generated during the construction phase of a development are listed in
Table 4.1 below.

  Pollutant                 Potential Source                                     Priority
  Litter                    Paper, construction packaging, food packaging,       High
                            cement bags, off cuts
  Sediment                  Unprotected exposed soils and stockpiles during      High
                            earthworks and building works
  Hydrocarbons              Fuel and oil spills, leaks from construction         High
                            equipment and temporary car park areas.
  Toxic Materials           Cement slurry, asphalt primer, solvents, cleaning    Medium
                            agents, wash waters (e.g. From tile works)
  Alkaline                  Cement slurry and wash waters                        High
  substances
                               Table 4.1 Typical Construction Phase Pollutants


4.1.2 Potential Impacts

Construction activities can have a potential impact on water quality. Removal of vegetation,
earthworks and changes to drainage patterns can result in erosion and sediment being
washed into waterways. This can impact on the physical-chemical parameters of the
receiving water, decline in the health of aquatic ecosystems, and overall aesthetics.
Potential impacts to the receiving waters surrounding the development site will be
minimized during the construction phase with typical measures as outlined below. These
measures should be adequately detailed on erosion and sediment control plans as part of
the development’s Operational Works application.


4.1.3 Performance Objectives

The amount of runoff traversing and discharging from the site while under construction
should be kept to a minimum. This will restrict soil erosion and mobilisation of sediments
and pollutants through and off the site.


Stormwater runoff at discharge points during the construction phase shall comply with the
objectives detailed in Table A in Appendix 2: Stormwater Management Design Objectives,
Part G, SPP (2017).

4.1.4 Control Measures

The following are typical treatment measures that should be implemented before the
commencement of any construction works. Detailed erosion and sediment control
procedures are to be based on the erosion and sediment control plans lodged at the
Operational Works phase.
Site Based Stormwater Management Plan                                             Page 5 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 11

Maintenance

Maintenance of erosion and control treatment measures (such as sediment fences) will be
undertaken if it is observed that they have not been properly installed or the capacity of the
measure falls below 75%.

Minimise Disturbed Areas

Only clear land which will be actively under construction in the near term (e.g. within the
next 3-6 months).

Stabilise Disturbed Areas

Provide temporary stabilisation of disturbed soils whenever active construction is not
occurring on a portion of the site. Provide permanent stabilisation during finish grade and
landscape the site.

Protect Slopes and Channels

Safely convey runoff from the top of the slope and stabilise temporary and permanent
channel crossings as quickly as possible and ensure that increases in runoff velocity caused
by the project do not erode the channel.

Diversions of Upslope Runoff

To prevent the contamination of clean runoff, upslope runoff should be diverted away from
areas of exposed soil. This may be achieved by installing tightly abutting sandbags, creating
a ‘sandbag perimeter bank’ to divert flow.

Sediment Fences and Inlet Protection

Delineate site perimeter to prevent disturbing areas outside the project limits. Sediment
fences should be installed around the perimeter of works to ensure contaminated runoff is
filtered and sediment is trapped before leaving the site. Sandbags or geofabric should also
be placed around/over existing stormwater inlets/grates throughout the site to ensure that
any contaminated runoff is filtered before it enters the existing piped stormwater network.

Retain Sediment

Retain sediment-laden waters from disturbed, active areas within the site.

Stabilised Vehicle Entry/Exit Point

To minimise the transport of sediment off site, a stabilised entry/exit point should be
constructed. All vehicles entering and leaving the site must use this designated entry/exit
point.

Site Based Stormwater Management Plan                                             Page 6 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 12

Stockpiles

Stockpile locations should be identified before the commencement of works. Ideally, they
should be located in a flat area at least 15m from any water body or stormwater inlet.
Sediment fences should be installed downslope of all erodible stockpiles, and upslope
protection measures should be used (i.e. sandbags or sediment fence) to divert runoff in
the event of rain. At the end of each working day stockpiles should be covered with geofabric
if rain or high winds are forecast.

Street Sweeping

Ensure that local roads are swept as required. This will minimise the potential for sediment
tracked onto the road to be washed into the stormwater system. If a large quantity of
sediment is being tracked onto the surrounding streets the stabilised entry/exit point may
need to be raked or reinforced with rock to provide more effective sediment removal for
vehicles.

Erosion Control Matting and Permanent Stabilisation

Exposed areas onsite should be permanently stabilised (i.e. with turf) as the construction
works progress. Erosion control matting or mulching should be used as a temporary
measure to stabilize exposed areas before permanent stabilisation can be undertaken.

Monitoring

Monitoring and recording of the performance of the drainage control devices including are
to be undertaken in accordance with local government requirements. It is further
recommended that the proposed construction works are undertaken during periods of dry
weather to reduce the potential for sediment to be transported off site during construction.



4.2 OPERATIONAL PHASE

The internal drainage system has been designed to include SQIDs in the water quality
treatment train for the proposed development. Refer to the conceptual drainage plans in
Appendix A for details.


4.2.1 Bioretention Basin

Bioretention basins are densely vegetated filtration devices, where runoff (for small/frequent
storm events) enters the basin and is filtered through a filter media layer (e.g. sandy loam)
as it percolates downwards. Bioretention basins often have an extended detention volume
above the filter media which increases the volume of runoff treated through the system.
The runoff is treated as it passes through the system through fine filtration, absorption, and
Site Based Stormwater Management Plan                                             Page 7 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 13

some biological uptake. Refer to Figure 4.1 below showing a typical cross section of a
bioretention basin.




                           Figure 4.1 Typical cross section of a bioretention basin


Bioretention provides a number of functions including:
     · Reduce the velocity of runoff;
     ·    Trap sediment and associated pollutants; and
     ·    Reduce concentrations of nutrients such as Nitrogen and Phosphorous.


The detailed design, construction and maintenance of bioretention basins should be in
accordance with the ‘WSUD Technical Design Guidelines’. Plant species for bioretention
basins within this development should be selected based on WSUD Technical Design
Guidelines, and the integration with the landscape design.


Establishing Bioretention Basins
The establishment period for plant species before the vegetation is mature and fully
functional is typically two years. During this period, regular site maintenance and monitoring
is crucial to the success of the basin as a treatment device




4.2.2 Bioretention Street Tree (Tree Pit)

Bioretention Street Trees are a combination of a bioretention system and a street tree. They
are typically designed to be small systems able to accommodate trees suitable for use in
streetscapes and shrubs for additional nutrient uptake and aesthetics.




Site Based Stormwater Management Plan                                                 Page 8 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 14

      Figure 4.2 Typical cross section of a bioretention street tree (Source IPWEA standard drawing DS-077)




Site Based Stormwater Management Plan                                                               Page 9 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 15

4.3 MUSIC Modelling

MUSIC (Version 6.2, eWater), a pollutant export modelling program has been used to model
both the expected pollutant loads generated by the development and the effectiveness of
WSUD treatment options selected.

4.3.1 Split Catchment Approach

The MUSIC model is based on a split catchment approach, modeled as various catchments
representing the different surface types in accordance with the guidelines and available site
information. Split catchment surface information can be found in Table 4.2 below. The
fraction impervious was calculated from proposed sealed pavement areas, and rounded up
to the nearest 5% to account for minor adjustments in detailed design.

                           Surface Type                    % Imperviousness
                           Road Reserve                Varies (75% / 70% / 60%)
                                    Table 4.2 Adopted % Imperviousness


Table 4.3 lists the total areas for the surface type in the catchment that was used in the
model. The total area is the proposed total extent of the road reserve area. Refer to the
Catchment Plan in Appendix A demonstrating these areas within the proposed development.


                          Node                                           Area (ha)
          West Hofmann Drive (South-1)                                   0.1350

            West Hofmann Drive (North)                                   0.2247

          West Hofmann Drive (South-2)                                   0.1091

                        Road A                                           0.2424

                        Road B                                           0.4000

                    Upper Road C                                         0.2368

                    Lower Road C                                         0.3569

          North Road & Part Roundabout                                   0.2419

                      Sub - Total                                        2.5358

        Lot 11-15 Car Parks and Driveways                                0.5155

                          Total                                          3.0513
                                      Table 4.3 Surface Area of Nodes




Site Based Stormwater Management Plan                                                Page 10 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 16

4.3.2 MUSIC Meteorological Data

Cooroy DPI (Station 40059) meteorological data was selected for the MUSIC analysis. The
10-year climate period was selected in accordance with Table 3.1 of the guidelines. The
rainfall and evapo-transpiration data for the period of 01/01/1973 to 31/12/1983, with a 6-
minute time step was used in the model.


Input parameters for the rainfall-runoff, source nodes and treatment devices were also
obtained from the guidelines. The following parameters were selected based on a
commercial/industrial development.



4.3.3 Rainfall-Runoff Parameters

The rainfall-runoff parameters listed in Table 3.7 of MUSIC guidelines were used in the
model. The parameters recommended by the guideline are as shown in Table 4.4 below.


         PARAMETER                                                   Commercial/Industrial
         Rainfall threshold (mm)                                             1
         Soil storage capacity (mm)                                         18
         Initial storage (% capacity)                                       10
         Field capacity (mm)                                                80
         Infiltration capacity                                              243
         Coefficient a
         Infiltration capacity                                                    0.6
         Exponent b
         Initial depth (mm)                                                       50
         Daily recharge rate (%)                                                   0
         Daily baseflow rate (%)                                                  31
         Daily deep seepage rate (%)                                               0
                              Table 4.4 Recommended rainfall-runoff parameters




4.3.4 MUSIC Pollutant Export Parameters Split Catchment Land Use (Commercial)

                                    TSS log10
                                                           TP log10 values         TN log10 values
                   Surface            values
 Flow Type
                    Type                     St.                          St.                    St.
                                  Mean                     Mean                      Mean
                                           dev.                          dev.                   dev.
 Baseflow            Roof          N/A      N/A             N/A          N/A            N/A     N/A
 parameters
                   Roads           0.78        0.39         -0.6         0.50           0.32    0.30
                   Ground          0.78        0.45        -1.11         0.48           0.14    0.20
                    Level
 Stormflow          Roof           1.30        0.44        -0.89         0.36           0.25    0.32
 Parameters
                   Roads           2.43        0.38        -0.30         0.34           0.37    0.34
                   Ground          1.92        0.44        -0.59         0.36           0.25    0.32
                    Level
                   Table 4.5 MUSIC Export Parameters Split Catchment Land Use (Industrial)

Site Based Stormwater Management Plan                                                          Page 11 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 17

4.3.5 MUSIC Treatment Node Parameters (Post Developed Site)

Bioretention Basins


Figure 4.33 to Figure 4.5 show the parameters for the bioretention basins.




                    Figure 4.3 Bioretention node parameters for the new North Roundabout




            Figure 4.4 Bioretention node parameters for Upper Road C catchment (Combined Node)



Site Based Stormwater Management Plan                                                            Page 12 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 18

                    Figure 4.5 Bioretention node parameters for Lower Road C Catchment




               Figure 4.6 Bioretention node parameters for Road B Street Trees (combined node)




Site Based Stormwater Management Plan                                                            Page 13 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 19

                             Figure 4.7 Bioretention node parameters for Road A




                    Figure 4.8 Bioretention node parameters for Hofmann Drive (north side)




Site Based Stormwater Management Plan                                                        Page 14 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 20

            Figure 4.9 Bioretention node parameters for Hofmann Drive (south side in front of Lot 16)




           Figure 4.10 Bioretention node parameters for Hofmann Drive (south side in front of Lot 15)




Site Based Stormwater Management Plan                                                               Page 15 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 21

    Figure 4.11 Bioretention node parameters for basins in Lots 12-15 for car parking and driveway pavements



Vegetated Swale

Figure 4. shows the parameters for the vegetated swale node in the MUSIC model.




                                 Figure 4.12 Vegetated Swale Node Parameters


Site Based Stormwater Management Plan                                                             Page 16 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 22

Buffer

Figure4.13 shows the parameters for the buffer node in the MUSIC model. This is applied
where runoff from the bushfire access driveway pavement will runoff via sheet flow to the
surrounding ground




                                    Figure 4.12 Bufffer Node Parameters



4.3.6 MUSIC Model Results

Figure 4.14 shows the MUSIC model treatment train layout and results from the proposed
stormwater quality improvement devices (SQIDs), which is also shown on drawings
1856/SW01-SW05 in Appendix A. The results as shown below were generated using the
stochastic option as per the guidelines.




                                     Figure 4.14 MUSIC Model Results


Site Based Stormwater Management Plan                                         Page 17 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 23

All load-based pollutant reduction efficiencies are met in accordance with the Table A in
Appendix 2: Stormwater Management Design Objectives, Part G, SPP (2017) included in
Appendix B.


The bioretention treatment nodes for the car parking pavements in Lots 12-15 are modelled
as all the same size for consistency at planning stage. It is recommended that the MUSIC
file be updated as part of the Operational Works design to correctly capture batters and
extended detention, final pavement catchments etc. with the construction drawings for these
works.


The Noosa Plan, Division 20-Water Sensitive Design Code, table 14-61 Specific Outcome
S1.5 requires that stormwater discharging to naturally acidic areas are managed to prevent
eutrophication. Council representatives have identified that areas to the south of Lot 11 and
12, including the covenant land incorporated within Lot 12, are naturally acidic areas. To
manage this, it is recommended that stormwater outlets from post treatment systems and
runoff from both Lots 11 and 12 should occur to the surface at a lower level to the lot pad
so that discharged water has sufficient room to disperse across the ground, absorbing
nitrogen and reducing the runoff pH from contact with decomposing leaf litter. To achieve
this, a rock pad generally in accordance with the design specification in QUDM-2017 is
proposed at these outlet to the treatment system and pipe discharge for Lot 12, with the
exception that the rock pad flares at 1:1 instead of 1:5 to encourage flow dispersion.
The piped discharge for Lot 11 is to the drainage system in Road B. Any runoff from the
rear of the lot is to be buffered by groundcover vegetation areas either side of the bushfire
access track. This maintains the flow regime as sheet runoff and allows the surface water
to be in contact with the soils and natural vegetation of the area as it moves south, to
correctly balance the pH before entering the acidic areas.




Site Based Stormwater Management Plan                                            Page 18 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 24

5.0 CONCLUSION

This site-based stormwater management plan has reviewed the stormwater quality
management at the proposed development at Noosaville, Queensland.


Based on this assessment the following conclusions have been made:


· The proposed development includes Stormwater Quality Improvement Devices being
   bioretention basins and vegetated swales treating post-developed flows from the
   proposed road reserve only, in accordance with the Qld SPP (2017). The total amount
   of treatment devices are as follows:
        o    Vegetated swale (total length) = 20m
        o    Buffered area = 50m2
        o    Bioretention basin (total area) = 243m2


   In the event the individual lots created by this subdivision are developed, they will require
   SQIDs to satisfy stormwater runoff pollutant removal targets for each specific lot.

In summary, stormwater leaving the site will satisfy the pollutant removal criteria in Council’s
Planning Scheme and the Qld SPP.




Site Based Stormwater Management Plan                                               Page 19 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 25

6.0     LIMITATIONS OF THIS REPORT

This Site Based Stormwater Management Plan (SBSMP) has been tailored to report on
issues in the areas of interest, as detailed above. The information in this report is not to be
used outside of the subject area.


We consider that this SBSMP accurately considers conditions at the area of interest at the
time the SBSMP was developed and based on information supplied to us by second and
third parties. This SBSMP is to be reviewed, if site conditions change in the future.


This SBSMP has been undertaken for the specific purposes of the Stockwell Pty Ltd, as
detailed in our correspondence to them, and is solely for their use.


This SBSMP should only be used in full and may not be used to support objectives other
than those set out herein, except where written approval, with comments, are provided by
Barlow Shelley Consulting Engineers.


Barlow Shelley Consulting Engineers accept no liability with respect to the accuracy of
information supplied by second and third parties.




Site Based Stormwater Management Plan                                              Page 20 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 26

7.0 REFERENCES


Department of Infrastructure, Local Government and Planning (July 2017), State Planning
Policy, DILGP, Brisbane.


Institute of Public Works Engineering Australasia, Queensland (2017), Queensland Urban
Drainage Manual – Fourth Edition, IPWEAQ, Queensland.


Water by Design (2014). Bioretention Technical Design Guidelines (Version 1.1). Healthy
Waterways Ltd, Brisbane.




Site Based Stormwater Management Plan                                        Page 21 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 27

8.0     CLOSURE

Should further information be required please contact:


AUTHORED BY:




_______________________________
VINCENT VICIC – ENGINEER
BEng GradIEAust
For and on behalf of:
BARLOW SHELLEY CONSULTING ENGINEERS (AUST) PTY LTD



REVIEWED & APPROVED BY:



_________________________________________
CAMERON LANDRETH – DIRECTOR (RPEQ 19358)
BEng (Hons), NER, RPEQ
For and on behalf of:
BARLOW SHELLEY CONSULTING ENGINEERS (AUST) PTY LTD




Site Based Stormwater Management Plan                    Page 22 of 22
1856-SBSMP-01_Version 5.0 (December 2019)

Page 28

                                                         A
                                                         Appendix




Preliminary Plans by Barlow Shelley Consulting Engineers

   -   Drawings 1856/SW01-SW07
       Prepared by Barlow Shelley Consulting Engineers

Page 29

                                                                                                             RIVE
                                                                                                ANN D
                                                                                       HOFM
                                                                                                                                                                                                                                                 LOT 9




                                     DB
                                                                                                                                                                                                                                                                                                                                                                  E
                                                                                                                                                                                                                                                                                                                                                               IV
                                                                                                                                                                                                                                                                                                                                                              R




                                   ROA
                                                                                                                                                                                                                                                                                                                                                             D
                                                                                                                                                                                                                                                                                                                                                         Y
                                                                                                                                                                                                   RO                                                                                                                                                A
                                                                                                                                                                                                                                                                                                                                                    H
                                                                                                                                                                                                      AD                                                                                                                                       ER
                                                                                                                                                                                                            A                                                                                                                                LT
                                                                                                                                                                                                                                                                                                                                         A
                                                                                                                                                                                                                                                                                                                                        W


                                                                  LOT 16

                                                                                                                                                                                    SWALE 20m


                                                                                                                                                                                         BIO-RETENTION




                                                                                                                B
                                                                                                          AD                                                                           LOT 10
                                                                                                     RO




                       LOT 13
                                                                                                                 LOT 11




                                                             LOT 12



                                                                                                                                                                                                                                           E
                                                                                                                                                                                                                                         IV
                                                                                                                                                                                                                                      R
                                                                                                                                                                                                                                     D
                                                                                                                                                                                                                                 Y
                                                                                                                                                                                                                             A
                                                                                                                                                                                                                            H
                                                                                                                                                                                                                       ER
                           BIO-RETENTION                                                                                                                                                                             LT
                                                                                                                                                                                                                 A
                                                                                                                                                                                                                W

                    OUTLET SCOUR
                   PROTECTION TO
                     QUDM SPECS.




                                                                                                                                                                                                                                                                                                                            LEGEND - EXISTING SERVICES
                                                                                                                                                                                                                                                                                                                                                    EXISTING SEWER DN225 uPVC SN8
                                                                                                                                                                                                                                                                                                                                                    EXISTING SEWER DN150 uPVC SN8
                                                                                                                                                 DRIVEWAY FOR TABLE DRAIN
                                                                                                                                                                                                                                                                                                                                                    EXISTING DN150 OPVC PN16 WATERMAIN
                                                         COVENANT                                                                                                                                                                                                                                                                                   EXISTING DN250 DI PN35 WATERMAIN
                                                                                                                                                                                                                                                                                                                                                    EXISTING DN610 WATERMAIN

                                                                                                                                                                                                                                                                                                                            LEGEND - NEW WORKS EXTENT
                                                                                                                                                                                                                                                                                                                                                    STORMWATER DRAINAGE

                                                                                                                                                                                                                                                                                                                                                    EXTENT OF AC SEAL

                                                                                                                                                                                                                                                                                                                                                    KERB & CHANNEL (B1 TYPE 450mm CHANNEL)

                                                                                                                                                                                                                                                                                                                                                    EXTENT OF 2m WIDE CONCRETE FOOTPATH


                                                                                                                                                                                                                                                                                                                                                    EXTENT OF COMMERICAL DRIVEWAY
                                                                                                                IVE
                                                                                                            DR




                                                                                                                                                                                                                                                                                                                                                    ROAD CENTRELINE
                                                                                                           Y
                                                                                                        HA




                                                                                                                                                                                                                                                                                                           PROJECT:                                                             JOB NUMBER
                                                                                                    ER




REV DATE DESCRIPTION                                BY    CHKD                                                           SCALE                                                      APPROVED
                                                                                                                                                                                                                                                                                                                                                                                    1856
                                                                                                    T
                                                                                                 AL




 J    02-12-19    REVISED FOR COMMENT               MM      CL
                                                                                 AHD
                                                                                                W




                                                                 DATUM                                                                                                                                                                                                                                                                                                     SHEET:        OF
 B
 C
      16-07-19
      13-08-19
                  REVISED FOR INFORMATION REQUEST
                  REVISED DRIVEWAYS & PATHWAYS
                                                    MM
                                                    JP
                                                            CL
                                                            CL   DESIGN          MM
                                                                                            0              10             20             30              40              50m      .................                                                                                                                                                                                  1        7


 D    28-08-19    REVISED ADDED LINK ROAD           MM      CL                                                                                                                 Director: CAMERON LANDRETH                                                                                                  DRAWING TITLE:                                                  DRAWING NUMBER         REV
                                                                 DRAWN           MM
 E    25-09-19    UPDATE SW                         CL      CL                                                                                                                           (RPEQ 19358)
                                                                                                                       SCALE 1:1000 A3
 F    1/11/19     REVISED FOR COUNCIL RFI           MM      CL   DESIGN CHECK     CL
                                                                                                                                                                               DRAWING STATUS
                                                                                                                                                                                                                                               07 5443 8285
                                                                                                                                                                                                                                                                                                                                                                               SW01                J
 G    1/11/19     REVISED FOR COUNCIL RFI           MM      CL                                                                                                                                                                                 [email protected]      www.barlowshelley.com.au
                                                                                           This drawing is not to be copied or amended without written permission from
                                                                 DATE           21-02-19                                                                                             FOR APPROVAL
 H   21-11-2019   DRAFT FOR COMMENT ONLY            MM      CL                             Barlow Shelley Consulting Engineers                                                                                                                 PO Box 899, Maroochydore,4558 ABN 89 215 591 077

Page 30

                                                                                                             BIO-RETENTION                                                                                                                                                                                                                                              CATCHMENT 3659m2

                                                                                                                                             LOT 4

                                                                                                        KERB ADAPTOR INLETS
                                                                                                        TO BIO-RETENTION
                                                                                                        BASIN - TYPICAL




                                                                                                                                                                                                                LOT 6
                                                                                                                                                                 LOT 5




                                                                                                   H
                                                                                                    O
                                                                                                     FM
                                                                                                       A
                                                                                                        N
                                                                                                                                                                                                                                  BIO-RETENTION




                                                                                                         N
                                                                                                             D
                                                                                       2                                                                                                                                                                                                                                                                        LOT 8




                                                                                                               R
                                                                     CATCHMENT 1102m
                                                                                                                                                                           CATCHMENT 2247m2




                                                                                                                IV
                                                                                                                  E
                                                                      LOT 15

                                                                                                                                                                                                                                                                                                                   BIO-RETENTION




                                                                                                                                                                                                                          RIVE
                                                                                                                                                                                                                    ANN D
                           BIO-RETENTION                                                                                                                                                                     HOFM
                                                                                CATCHMENT 4060m2                                                                                                                                                                                                                                                        LOT 9



                                                                                                              B
                                                                                                              D                                                                                                                                                                                                                          CATCHMENT 2680m2
                                                                                                          ROA
           OUTLET SCOUR
          PROTECTION TO                                                                                                                                                                                                                                                                                       RO
            QUDM SPECS.                                                                                                                                                                                                                                                                                         AD
                                                                                                                                                                                                                              2                                                                                      A                                                    DISCHARGE INTO EXISTING
                                                                                                                                                                                                             CATCHMENT 1332m                                                                                                                                                STORMWATER NETWORK



                                                                                                                                                                                 LOT 16

                                                                                                                                                                                                                                                                                   SWALE 20m
                                                                    LOT 14


                                                                                                                                                                                                                                                                                                                                               BIO-RETENTION




                                                                                                                                                                                                                              B
                                                                                                                                                                                                                         AD                                                             LOT 10
                                                                                                                                                                                                                      RO




                                     BIO-RETENTION



                                                                                                                                                                      CATCHMENT 3652m2                                                                                                                                                                  LEGEND - NEW WORKS EXTENT
                                 OUTLET SCOUR                                                      LOT 13
                                                                                                                                                                                                                              LOT 11
                                PROTECTION TO                                                                                                                                                                                                                                                                                                                                STORMWATER DRAINAGE
                                  QUDM SPECS.
                                                                                                                                                                                                                                                                                                                                                                            EXTENT OF AC SEAL
                                                    BIO-RETENTION
                                                                                                                                                                                                                                                                                                                                                                            KERB & CHANNEL (B1 TYPE 450mm CHANNEL)
                                                                                                                                                                       LOT 12
                                                                                                                                                                                                                                                                                                                                                                            EXTENT OF 2m WIDE CONCRETE FOOTPATH


                                                                                                                                                                                                                                                                                                                                                    E                       EXTENT OF COMMERICAL DRIVEWAY
                                                                                                                                                                                                                                                                                                                                               IV
                                                                                                                                                                                                                                                                                                                                            R
                                                                                                                                                                                                                                                                                                                                           D
                                                                                                                                                                                                                                                                                                                                      AY
                                                                                                                                                                                                                                                                                                                                     H
                                                                                                                                                                                                                                                                                                                                ER
                                                                                                                                                                                                                                                                                                                            A LT
                                                                                                                                                                                                                                                                                                                                                                            ROAD CENTRELINE
                                                                                                                                                                                                                                                                                                                           W

                                                                                                                                                                                                                                                                                                                         PROJECT:                                                                       JOB NUMBER
REV DATE DESCRIPTION                                           BY    CHKD                                                             SCALE                                                      APPROVED
                                                                                                                                                                                                                                                                                                                                                                                                             1856
 J    02-12-19    REVISED FOR COMMENT                          MM     CL
                                                                             DATUM           AHD                                                                                                                                                                                                                                                                                                    SHEET:        OF
 B
 C
      16-07-19
      13-08-19
                  REVISED FOR INFORMATION REQUEST
                  REVISED DRIVEWAYS & PATHWAYS
                                                               MM
                                                               JP
                                                                      CL
                                                                      CL     DESIGN          MM
                                                                                                         0              10             20             30              40              50m      .................                                                                                                                                                                                              2        7


 D    28-08-19    REVISED ADDED LINK ROAD                      MM     CL                                                                                                                    Director: CAMERON LANDRETH                                                                                               DRAWING TITLE:                                                                 DRAWING NUMBER         REV
                                                                             DRAWN           MM
 E    25-09-19    UPDATE SW                                    CL     CL                                                                                                                              (RPEQ 19358)
                                                                                                                                    SCALE 1:1000 A3
 F    1/11/19     REVISED FOR COUNCIL RFI                      MM     CL     DESIGN CHECK     CL
                                                                                                                                                                                            DRAWING STATUS
                                                                                                                                                                                                                                                  07 5443 8285
                                                                                                                                                                                                                                                                                                                                                                                                     SW02                   J
 G    1/11/19     REVISED FOR COUNCIL RFI                      MM     CL                                                                                                                                                                          [email protected]      www.barlowshelley.com.au
                                                                                                        This drawing is not to be copied or amended without written permission from
                                                                             DATE           21-02-19                                                                                              FOR APPROVAL
 H   21-11-2019   DRAFT FOR COMMENT ONLY                       MM     CL                                Barlow Shelley Consulting Engineers                                                                                                       PO Box 899, Maroochydore,4558 ABN 89 215 591 077

Page 31

                                                                                                                                                  LOT 21




                                                                                     HO
                                                                                       FM
                                                                                         AN
                                                                                         N
                                                                                              DR
                                                                                                IV
                                                                                                E
                                                                                                                                                                                LOT 19


                                                                                                                                                                        REFER TO TYPICAL TURFED
                                                                                                                                                                        SWALE DETAIL ON SW07




                                                                                                                                                                                                                       LOT 18




                                                                                                                                                                                                                                                             LOT 17




                                                                                                                                                                                                                                 H
                                                                                                                                                                                                                                  O
                                                                                                                                                                                                                                     FM
                                                                                                                                                                                                                                       A
                                                                                                                                                                                                                                          N
                                                                                                                                                                                                                                           N
                                                                                                                                                                                                                                               D
                                                                                                                                                                                                                                                R
     LEGEND - NEW WORKS EXTENT                                                                                                                                                                                                                     IV
                                                                                                                                                                                                                                                     E
                                                     STORMWATER DRAINAGE

                                                     EXTENT OF AC SEAL

                                                     KERB & CHANNEL (B1 TYPE 450mm CHANNEL)

                                                     EXTENT OF 2m WIDE CONCRETE FOOTPATH

                                                                                                                                                                                                                                                                                                                     BIO-RETENTION
                                                     EXTENT OF COMMERICAL DRIVEWAY

                                                                                                                                                                                                                                                                                                                                      LOT 4


                                                     ROAD CENTRELINE

                                                                                                                                                                                                                                                                                                                           PROJECT:               JOB NUMBER
REV DATE DESCRIPTION                                            BY     CHKD                                                                   SCALE                                                      APPROVED
                                                                                                                                                                                                                                                                                                                                                       1856
 J     02-12-19    REVISED FOR COMMENT                           MM      CL
                                                                              DATUM                   AHD                                                                                                                                                                                                                                     SHEET:        OF
 B
 C
       16-07-19
       13-08-19
                   REVISED FOR INFORMATION REQUEST
                   REVISED DRIVEWAYS & PATHWAYS
                                                                 MM
                                                                 JP
                                                                         CL
                                                                         CL   DESIGN                  MM
                                                                                                                 0              10             20             30              40              50m      .................                                                                                                                                3        7


 D     28-08-19    REVISED ADDED LINK ROAD                       MM      CL                                                                                                                         Director: CAMERON LANDRETH                                                                                             DRAWING TITLE:     DRAWING NUMBER         REV
                                                                              DRAWN                   MM
 E     25-09-19    UPDATE SW                                     CL      CL                                                                                                                                   (RPEQ 19358)
                                                                                                                                            SCALE 1:1000 A3
 F     1/11/19     REVISED FOR COUNCIL RFI                       MM      CL   DESIGN CHECK             CL
                                                                                                                                                                                                    DRAWING STATUS
                                                                                                                                                                                                                                                         07 5443 8285
                                                                                                                                                                                                                                                                                                                                               SW03                   J
 G     1/11/19     REVISED FOR COUNCIL RFI                       MM      CL                                                                                                                                                                              [email protected]      www.barlowshelley.com.au
                                                                                                                This drawing is not to be copied or amended without written permission from
                                                                              DATE                   21-02-19                                                                                             FOR APPROVAL
 H    21-11-2019   DRAFT FOR COMMENT ONLY                        MM      CL                                     Barlow Shelley Consulting Engineers                                                                                                      PO Box 899, Maroochydore,4558 ABN 89 215 591 077

Page 32

                                                                                                                                                                                                           OUTLET




                                                                             OUTLET



                                                                                                                                                                                                                                       D
                                                                                                                                                                                                                                  R  OA
                                                                                                                                                                                                                               ED
                                                                                                                                                                                                                         -N AM
                                                                                                                                                                                                                       UN




                                                                                                                                                                                                                                 CATCHMENT 2419m2

                                                                                                                  BIORETENTION




                                                                                                                                                                                                                                                                                                                                       E
                                                                                                                                                                                                                                                                                                                                 Y DRIV
                                                                                                                                                                                                                                                                                                                            ER HA
                                                                                                                                                                                                                                                                                                                        WALT
                                                                                                                                                                                                                    NEW STORMWATER
                                                                                                                                                                                                                    CATCH PIT
                                                                                                                           NEW STORMWATER
                                                                                                                                  CATCH PIT




                                                                                    LOT 3
                                                                                                                                                                                                            CATCHMENT 2368m2
                                                                                    4.004 Ha




     LEGEND - NEW WORKS EXTENT
                                                STORMWATER DRAINAGE

                                                EXTENT OF AC SEAL

                                                KERB & CHANNEL (B1 TYPE 450mm CHANNEL)                                                                                                                                LOT 7
                                                                                                                                                                                                                      2.963 Ha
                                                EXTENT OF 2m WIDE CONCRETE FOOTPATH


                                                EXTENT OF COMMERICAL DRIVEWAY
                                                                                                                                                                                    CATCHMENT 3659m2




                                                                                                                                                                                                                                                                                                               E
                                                                                                                                                                                                                                                                                                           Y DRIV
                                                ROAD CENTRELINE




                                                                                                                                                                                                                                                                                                         ER HA
                                                                                                                                                                                                                                                                                                       PROJECT:                                JOB NUMBER
REV DATE DESCRIPTION                                        BY      CHKD                                                            SCALE                                                      APPROVED
                                                                                                                                                                                                                                                                                                                                                    1856




                                                                                                                                                                                                                                                                                                        WALT
 J    02-12-19   REVISED FOR COMMENT                         MM      CL
                                                                           DATUM               AHD                                                                                                                                                                                                                                         SHEET:        OF
 B
 C
      16-07-19
      13-08-19
                 REVISED FOR INFORMATION REQUEST
                 REVISED DRIVEWAYS & PATHWAYS
                                                             MM
                                                             JP
                                                                     CL
                                                                     CL    DESIGN              MM
                                                                                                       0              10             20             30              40              50m      .................                                                                                                                                       4        7


 D    28-08-19   REVISED ADDED LINK ROAD                     MM      CL                                                                                                                   Director: CAMERON LANDRETH                                                                                   DRAWING TITLE:                      DRAWING NUMBER         REV
                                                                           DRAWN               MM
 E    25-09-19   UPDATE SW                                   CL      CL                                                                                                                             (RPEQ 19358)
                                                                                                                                  SCALE 1:1000 A3
                                                                           DESIGN CHECK        CL
                                                                                                                                                                                          DRAWING STATUS
                                                                                                                                                                                                                                           07 5443 8285
                                                                                                                                                                                                                                                                                                                                            SW04                   J
 G     1/11/19   REVISED FOR COUNCIL RFI                     MM      CL                                                                                                                                                                    [email protected]      www.barlowshelley.com.au
                                                                                                      This drawing is not to be copied or amended without written permission from
                                                                           DATE            21-02-19                                                                                             FOR APPROVAL
                                                                                                      Barlow Shelley Consulting Engineers                                                                                                  PO Box 899, Maroochydore,4558 ABN 89 215 591 077

Page 33

                                                                                                                                                                                                       LOT 23
                                                                                                                                                                                                       2.61 Ha




                                                                                                                                                   W
                                                                                                                                                       AL
                                                                                                                                                           TE
                                                                                                                                                                R
                                                                                                                                                                    HA
                                                                                                                                                                         Y
                                                                                                                                                                              DR
                                                                                                                                                                                    IV
                                                                                                                                                                                      E




                                                                                                                                                                                          OUTLET                  OUTLET

                                                                                            LOT 2


                                                                                                                                                                                                                                                                                                        LEGEND - NEW WORKS EXTENT
                                                  U
                                                  N
                                                       -N
                                                        AM




                                                                                                                                                                                                                                                                                                                        STORMWATER DRAINAGE
                                                            ED
                                                              R




                                                                                                                                                                                                                                                                                                                        EXTENT OF AC SEAL
                                                                  O
                                                                  AD




                                                                                                                                                                                                                                                                                                                        KERB & CHANNEL (B1 TYPE 450mm CHANNEL)

                                                                                                                                                                                                                                                                                                                        EXTENT OF 2m WIDE CONCRETE FOOTPATH


                                                                                                                                                                                                                                                                                                                        EXTENT OF COMMERICAL DRIVEWAY




                                                                                                                                                                                                                                                                                                                        ROAD CENTRELINE

                                                                                                                                                                                                                                                                                       PROJECT:                                                   JOB NUMBER
REV DATE DESCRIPTION                              BY        CHKD                                                              SCALE                                                        APPROVED
                                                                                                                                                                                                                                                                                                                                                       1856
 J   02-12-19   REVISED FOR COMMENT               MM         CL
                                                                      DATUM           AHD                                                                                                                                                                                                                                                     SHEET:        OF
 B
 C
     16-07-19
     13-08-19
                REVISED FOR INFORMATION REQUEST
                REVISED DRIVEWAYS & PATHWAYS
                                                  MM
                                                  JP
                                                             CL
                                                             CL       DESIGN          MM
                                                                                                 0              10             20             30              40              50m         .................                                                                                                                                             5        7


 D   28-08-19   REVISED ADDED LINK ROAD           MM         CL                                                                                                                      Director: CAMERON LANDRETH                                                                        DRAWING TITLE:                                         DRAWING NUMBER         REV
                                                                      DRAWN           MM
 E   25-09-19   UPDATE SW                         CL         CL                                                                                                                                (RPEQ 19358)
                                                                                                                            SCALE 1:1000 A3
 F   1/11/19    REVISED FOR COUNCIL RFI           MM         CL       DESIGN CHECK     CL
                                                                                                                                                                                     DRAWING STATUS
                                                                                                                                                                                                                           07 5443 8285
                                                                                                                                                                                                                                                                                                                                               SW05                   J
 G   1/11/19    REVISED FOR COUNCIL RFI           MM         CL                                                                                                                                                            [email protected]      www.barlowshelley.com.au
                                                                                                This drawing is not to be copied or amended without written permission from
                                                                      DATE           21-02-19                                                                                               FOR APPROVAL
                                                                                                Barlow Shelley Consulting Engineers                                                                                        PO Box 899, Maroochydore,4558 ABN 89 215 591 077

Page 34

                                                                                     EE
                                                                                       NI
                                                                                            E
                                                                                                CR
                                                                                                  EE
                                                                                                      K
                                                                                                          RO
                                                                                                             AD




                                                                                                                                                                                                                                                                                                EE
                                                                                                                                                                 LOT 22                                                                                                                           NI
                                                                                                                                                                                                                                                                                                    E
                                                                                                                                                                                                                                                                                                        CR
                                                                                                                                                                                                                                                                                                          EE
                                                                                                                                                                                                                                                                                                             K
                                                                                                                                                                                                                                                                                                                 RO
                                                                                                                                                                                                                                                                                                                    A D


                                                             DRIVE


                                        NN
                               F   MA
                            HO



       NN
   FMA
HO




                                                                                                                                                                              UN
                                                                                                                                                                                -N
                                                                                                                                                                                        AM
                                                                                                                                                                                                ED
                                                                                                                                                                                                      RO
                                                                                                                                                                                                         AD


                                                                                                                                                                                                                                                                                                                          LEGEND - NEW WORKS EXTENT
                                                                                                                                                                                                                                                                                                                                          STORMWATER DRAINAGE

                                                                                                                                                                                                                                                                                                                                          EXTENT OF AC SEAL

                                                                                                                                                                                                                                                                                                                                          KERB & CHANNEL (B1 TYPE 450mm CHANNEL)

                                                                                                                                                                                                                                                                                                                                          EXTENT OF 2m WIDE CONCRETE FOOTPATH


                                                                                                                                                                                                                                                                                                                                          EXTENT OF COMMERICAL DRIVEWAY




                                                                                                                                                                                                                                                                                                                                          ROAD CENTRELINE

                                                                                                                                                                                                                                                                                                     PROJECT:                                                       JOB NUMBER
         REV DATE DESCRIPTION                                  BY    CHKD                                                                       SCALE                                                         APPROVED
                                                                                                                                                                                                                                                                                                                                                                         1856
            J   02-12-19   REVISED FOR COMMENT                 MM     CL
                                                                            DATUM                      AHD                                                                                                                                                                                                                                                      SHEET:        OF
            B
            C
                16-07-19
                13-08-19
                           REVISED FOR INFORMATION REQUEST
                           REVISED DRIVEWAYS & PATHWAYS
                                                               MM
                                                               JP
                                                                      CL
                                                                      CL    DESIGN                    MM
                                                                                                                   0             5.0             10             15              20              25m       .................                                                                                                                                               6        7


            D   28-08-19   REVISED ADDED LINK ROAD             MM     CL                                                                                                                               Director: CAMERON LANDRETH                                                                    DRAWING TITLE:                                             DRAWING NUMBER         REV
                                                                            DRAWN                     MM
            E   25-09-19   UPDATE SW                           CL     CL                                                                                                                                         (RPEQ 19358)
                                                                                                                                              SCALE 1:500 A3
            F   1/11/19    REVISED FOR COUNCIL RFI             MM     CL    DESIGN CHECK               CL
                                                                                                                                                                                                       DRAWING STATUS
                                                                                                                                                                                                                                    07 5443 8285
                                                                                                                                                                                                                                                                                                                                                                 SW06                   J
            G   1/11/19    REVISED FOR COUNCIL RFI             MM     CL                                                                                                                                                            [email protected]      www.barlowshelley.com.au
                                                                                                                  This drawing is not to be copied or amended without written permission from
                                                                            DATE                     21-02-19                                                                                                 FOR APPROVAL
                                                                                                                  Barlow Shelley Consulting Engineers                                                                               PO Box 899, Maroochydore,4558 ABN 89 215 591 077

Page 35

                                                                                                         BDY
                                                                                                                                                  4.00m

                                                                                                               1.00m               2.00m                         2.00m

                                                                                          <2.5%
                                                                                                                                      1:2                           1:2




                                                                        TYPICAL TURFED SWALE DETAIL
                                                                        NOT TO SCALE




                                                                         1.5m                     2.0m                             1.0m


                                                                                                                                                                                                                                                                                                       TEMPORARY TURF
                                                                                                                          RL = + 500MM FROM
                                                                                                                          FILTER MATERIAL


                                                                                                                                                                                                                                                                                 50mm TOP SOIL
                                                                                                                0.15
                                                           1:3                                                  MIN
                                                                                                                                                   1:2
                                                                                                                                                                                                                                                                                GOETEXTILE FABRIC
                                                                                                                                                                                                                                                                                WRAPPED OVER COMPLETE
                                                                                                                                                                                                                                                                                FILTER MEDIA

                                                  TEMPORARY TURF OVER 50mm SOIL                                                                                                                                                                                                 BIORETENTION BASIN
                                                  AND GOETEXTILE LAYER' REFER TO                                             FUTURE MACROPHYTE PLANTING                                                                                                                         REFER TO TYPICAL
                                                  DETAIL A                                                                   TO SUIT GROUND CONDITIONS                                                                                                                          CROSS SECTION.
                                                                                                                             WITH MULCH LAYER (REFER
                                                                                                                             LANDSCAPING DRAWINGS)
                                                             DRAINAGE PIPES
                                                                                                                                                                                                                                                                                                        BIORETENTION DETAIL
                                                                             POLY LINER                                                                                                                                                                                                                 NOT TO SCALE


                                                                       BIO-RETENTION - TYPICAL SECTION
                                                                       NOT TO SCALE


                                                                                                                                                                                                                                       FILTER CLOTH OR ORGANIC GEOTEXTILE MATTING FIXED TO
                                                                                                                                                                                                                                       PERIMETER OF WALLS TO AVOID RUNNELLING OF WATER
                                                                                                                                                                                                                                       BETWEEN PIT AND SOIL INTERFACE. 300 WIDE, 100 COVER.                             FIELD INLET PIT TYPE 1
                                                                                                                                                                                                                                                                                                                        WITHOUT CONCRETE
                                                                                                                                                                                                                                      C.I. CAP TO EXTEND                    FUTURE PLANTING TO                          APRON (IPWEA STD DWG
                                                                                                                                                                  PROPOSED EDGE                                                       APPROX. 150mm ABOVE                   LANDSCAPE PLANS                             D-0050
                                                                                                                                                                  RESTRAINT (ER2 TYPE)                                                BASIN SURFACE                                                                                 OVERFLOW PIT 300mm
                                                                                                                                                                                                                                                                                                                                    ABOVE BIORETENTION FSL
                                                                                                                                                                                                                                                                                                                                    MEDIA LEVEL      TEMPORARY TURF
                                                                                                                                                                                                                                                 1:2                                                                                                 AND TOP SOIL     1:2



                                      3%>                                                                                                                                                      <3%
                                                                                                                                                                                                                                  BIORETENTION 600




                                                                                                                                                                                                                                                                                                                 100
                                                                 1:4                                                                                                                                                              FILTER MEDIA
                                                                                                                             1:4

                                                                                                                                                                                                                                  COARSE SAND 100
                                                                                                                                                                                                                                  5-10mm GRAVEL 200


                                                                                                                                                                                                                                                                                      PVC DRAINS CONNECT                  PVC OUT
                                                                                                                                                                                                                                                                                      INTO GRATED PIT.
                                                         SWALE - TYPICAL SECTION                                                                                                                                                                                                      GRADE AT 0.5%
                                                                                           NOT TO SCALE                                          CONCRETE VEE 300mm                                                                                              TYPICAL BIORETENTION SCHEMATIC AND DETAILS
                                                                                                                                                 WIDE
                                                                                                                                                                                                                                                                 NOT TO SCALE



                                                                                                                                                                                                                                                                                                     PROJECT:                                                                   JOB NUMBER
REV DATE DESCRIPTION                                       BY      CHKD                                                                        SCALE                                                      APPROVED
                                                                                                                                                                                                                                                                                                                                                                                     1856
 J   02-12-19   REVISED FOR COMMENT                        MM           CL
                                                                                DATUM              AHD                                                                                                                                                                                                                                                                      SHEET:        OF
 B
 C
     16-07-19
     13-08-19
                REVISED FOR INFORMATION REQUEST
                REVISED DRIVEWAYS & PATHWAYS
                                                           MM
                                                            JP
                                                                        CL
                                                                        CL      DESIGN             MM
                                                                                                                  0             5.0             10             15              20              25m      .................                                                                                                                                                             7        7


 D   28-08-19   REVISED ADDED LINK ROAD                    MM           CL                                                                                                                           Director: CAMERON LANDRETH                                                                      DRAWING TITLE:                                                         DRAWING NUMBER         REV
                                                                                DRAWN              MM
 E   25-09-19   UPDATE SW                                  CL           CL                                                                                                                                     (RPEQ 19358)
                                                                                                                                             SCALE 1:500 A3
 F   1/11/19    REVISED FOR COUNCIL RFI                    MM           CL      DESIGN CHECK        CL
                                                                                                                                                                                                     DRAWING STATUS
                                                                                                                                                                                                                                        07 5443 8285
                                                                                                                                                                                                                                                                                                                                                                             SW07                   J
 G   1/11/19    REVISED FOR COUNCIL RFI                    MM           CL                                                                                                                                                              [email protected]      www.barlowshelley.com.au
                                                                                                                 This drawing is not to be copied or amended without written permission from
                                                                                DATE              21-02-19                                                                                                 FOR APPROVAL
                                                                                                                 Barlow Shelley Consulting Engineers                                                                                    PO Box 899, Maroochydore,4558 ABN 89 215 591 077

Page 36

                                                                 Appendix




Stormwater Quality Objectives – Construction Phase

   -   SPP (2017), Part G, Appendix 2, Table A. Department of Infrastructure, Local
       Government & Planning (DILGP).

   -   Healthy Waterways Guidelines for Building Sites

Page 37

Table B: Post construction phase - stormwater management design objectives

Application:

(1) A material change of use for an urban purpose that involves premises 2500 metres? or greater in size and:
(a) will result in six or more dwellings; or
(b) an impervious area greater than 25 per cent of the net developable area.

(2) Reconfiguring a lot for urban purposes that involves premises 2500 metres? or greater in size and will result in six or more lots.

Climatic region YTS) (ae Nod
Reductions in mean annual load from unmitigated development (%)

Total Total Total (TCs) Waterway stability

Ere. Pe Cred nee) pollutants management

solids (TSS) (TP) (TN) Peru
South East Queensland 80 60 45 90 Limit the peak 1-year
ARI event discharge
within the receiving
Central Queensland (north) 75 60 40% 90 waterway to the
pre-development peak

 

Central Queensland (south) 85 60 45 90

14, i 16,
Cape York , Wet tropics and 80 60 40 90 1-year ARI discharge
dry tropics
Western Queensland** 85 60 45 90
Notes:

© Mapping of climatic regions is available on the State Planning Policy Interactive Mapping System.

¢ In lieu of modelling, the default bio-retention treatment area to comply with load reduction targets for all Queensland regions
in 1.5 per cent of the contributing catchment area.

¢ Water stability objective applies if development drains to an unlined waterway within or downstream of the site where a risk of
increased erosion exists due to changes in hydrology. Local government may also require application of the waterway stability
objective where there are planned future rehabilitation works to return a lined channel to a natural channel design.

© The SPP Water quality guidance material provides advice on the measures that demonstrate compliance with table B.

Note: Applies to population centres greater than 25,000 persons.
Note: Mackay Regional Council has adopted a 35 per cent reduction for TN.
Note: Townsville City Council has adopted a 65 per cent reduction for TP.

page 82

Page 38

Part 2: Construction phase — stormwater management design objectives for temporary drainage works

 

 

Temporary drainage works PM ee CC Cem LC!
PEL
Cer Mrs PPro meld ey murs
>
Drainage structure 1in 2 year 1in5 year 1in 10 year 3
ARI/39% AEP ARI/18% AEP ARI/10% AEP 2
Where located immediately up-slope of an occupied 1in10 year ARI/10% AEP &

property that would be adversely affected by the
failure or overtopping of the structure

 

Culvert crossing 1in 1 year ARI/63% AEP

 

Part 3: Construction phase — stormwater management design objectives for emergency spillways on
temporary sediment basins

 

Drainage structure PM el CC Cem LC!
PU ne
Re Puc is cer PMC PPP MUO ry
Emergency spillways on temporary sediment basins 1in 10 year 1in 20 year 1in 50 year
ARI/10% AEP ARI/5% AEP ARI/2% AEP

 

Note: Refer to IECA 2008 Best Practice Erosion and Sediment Control (as amended) for details on the application of the
Construction Phase requirements. Advice should be obtained from a suitably qualified person e.g. Certified Practitioner in
Erosion and Sediment Control, or Registered Professional Engineer Queensland, with appropriate knowledge and experience
in erosion and sediment control design and implementation.

State Planning Policy page 81

Page 39

 

Controlling stormwater pollution
on your building site

MHEALTHY WATERWAYS =
uae tla sae

Page 40

ML aL

DTCs Introduction

Boece These guidelines provide a practical guide to best
practice techniques to minimise stormwater pollution from
building sites. They are designed to help people involved
in the building industry comply with their statutory
environmental duties and avoid large fines.

  
  
  
  
  
  
  
  
  
  
 
  
  
   
 
  
  

Erosion and sediment control on
Uc erecta} eE-1im L611 ae | <=

TtaNViT ce) ay any =181 21) Ser
The following fact sheets provide practical examples
of recommended control measures. Included is an easy-
to-follow daily site checklist to guide site supervisors.

110 (0) go) A 1 C) [-

Af To lta] CC01 10)
@ Erosion and sediment control daily site check list

IY e-Tl alee [I Xe) (Ce) : : : :
@ Erosion and sediment control on residential

Building operations.........................0.. building sites
@ Erosion control
@ Sediment control
® Drainage control

Storage of materials on hard surfaces..............
CCTCoTe) oX-Yo N o1¥ Cel] ate (0) <n

Erosion and Sediment Control Management Plans .. . 3) Building operations

@ Storage of materials on hard surfaces
Grouped building lots
@ Erosion and Sediment Control Management Plans

Erosion and sediment control BEST PRACTICE
daily site check list Best practice is the management of an activity to ensure

environmental harm is minimised using cost-effective
An erosion and sediment contro! check list has been measures. These practices are assessed against national
developed to assist builders and site supervisors and international standards.

managing the task of control measure maintenance.
SAVE MONEY TIME AND ENERGY

Some of the benefits to home owners, builders and
the building industry include:

For further information on erosion and sediment control,
contact your local council.

all-weather site access
improved wet weather working conditions
LEGEND sites do not get boggy
less mud and dust problems
~ Best practice reduced stockpile losses
reduced clean-up costs
~ Not best a better public image
Practice more marketable sites
fewer public complaints
¢ reduced risk of fines
¢ better fishing for everyone
e healthier waterways.

National and international experience shows that the
cost of effective pollution management on building sites

is greatly reduced within the first few years as builders
become experienced with the various techniques.

Page 41

 

 

What are the impacts?

Soil, sediment and litter from building sites can be major
sources of stormwater pollution, and can cause:

* negative impacts on recreational fishing and
the seafood industry

* sediment build-up within waterways which
can lead to weed growth

¢ loss of valuable topsoil

 

* significant public safety problems when washed

onto roads and intersections Mud and dirt on road after rain due to poor

on-site erosion and sediment control
e — blocked drains and water sensitive urban design

features leading to flooding and increased
maintenance costs to the community

* — significant harm to the environment of freshwater
and marine systems through the loss of valuable
seagrass habitat for marine creatures

* — public health issues from increased algal blooms

* reduced recreational opportunities due to increased

turbidity

 

Sediment moving out of Moreton Bay into the ocean
through Jumpinpin

Erosion and sediment control on residential building sites

Principles of effective stormwater pollution control include:
¢ — sensible site planning

* — diversion of up-slope water (where appropriate)

* — stabilised site entry/exit point

¢ — minimisation of site disturbance and duration of
disturbance

 

¢ installation of sediment controls along the lower
edge of the site

* appropriate location and protection of stockpiles
* — early connection of roofwater downpipes

* trap on-site run-off from tool, paint and concrete
washing and brick, tile and concrete cutting

* continual monitoring and maintenance of all
control measures

* compaction of backfilled trenches
* revegetation and stabilisation of the site

* — development and implementation of Erosion
and Sediment Control Management Plans
when appropriate.

 

Control measures in place on a residential building site

Page 42

MLL LL

 

SITE PLANNING

When planning the site layout, building location and earthworks, it is possible to minimise the number
of control devices needed for the sediment control zone, and their interference with the building process,
with a little forward thinking. Suggestions are to:

* — minimise the reshaping of the land

¢ — direct stormwater to flow around the building area and any unstable batters

¢ — allow room for a sediment barrier, eg. sediment fence, to be located along the lower side of the disturbance
* — design the home to suit the property type, eg. construct pole homes on steep properties

* avoid the permanent use of long, steep and unstable driveways

* avoid the use of exposed aggregate concrete surfaces in areas where the wash-off cannot be contained.

ST Ye taco Alt)

The sediment control zone is any
area of land disturbance which has
potential for the erosion of sediments.
This area should be protected by a
downslope sediment control

fant Te lc Mel are (A [ao

  

Good site planning Poor site planning — stockpile over
sediment fence, materials and toilet
stored outside building site

Environmental law

The Environmental Protection Act 1994, Environmental Protection (Water) Policy 1997 and the Integrated Planning
Act 1997 are important pieces of legislation that control the way in which soil erosion and sediment are required to
be dealt with on building and development sites.

PENALTIES

Breaches of the Environmental Protection (Water) Policy
1997 may result in:

* — on-the-spot fines under the Environmental Protection
(Water) Policy 1997 (ranging from $300 to $600)

* prosecutions under the Integrated Planning Act
1997 or the Environmental Protection Act 1994
(fines of thousands of dollars or prison sentences
for serious offences)

 

* the prosecution of individuals and/or companies. Council officer explaining the Environmental Protection
(Water) Policy 1997

Page 43

 

Erosion controls

MINIMISE DISTURBANCE
¢ — Earthworks should be kept to a minimum, and should only be commenced immediately prior to building works.

¢ — Maintain as much soil coverage as possible with the use of grass, leaf litter and mulch, gravel or erosion control
blanket (ECB) or matting.

* — Vegetation located down-slope of the work site assists in filtering out sediment. Where practicable, maintain
kerb vegetation such as grass and turf strips in a healthy state during the building process.

 

STOCKPILES

° Stockpiles and building materials should not be stored
on the footpath or within the road reserve. Permission
must be obtained from your Council to store materials
in these areas otherwise fines may be imposed.

. Minimise stockpile losses with the use of covers.

° All stockpiles and building materials should be located
within the sediment control zone, for example up-slope
of a sediment fence.

 

° Stockpiles must not be located within an overland flow

Stockpiles without protection path.

SERVICE TRENCHES

Backfill service trenches, cap with topsoil, and compact to a level at least 75-100 mm above the adjoining ground
level (either manually or with a small machine). This allows for some subsidence of the fill material, and ensures the
fill is sufficiently compacted to avoid erosion at a later time. (Note that trenches must be backfilled in accordance
with AS3500).

EROSION CONTROL BLANKETS OR MATTING

Erosion control blankets or matting can be used to minimise
soil erosion and stormwater pollution from sites by:

* — containing high erosion risk soils

¢ — stabilising steep slopes.

SITE REHABILITATION

All areas disturbed by building activities should be promptly
and progressively stabilised, using techniques such as
revegetation and landscaping, so they no longer act as
sources of sediment.

MULCHING AND GARDEN BEDS

To minimise soil loss, mulch should be applied to open Rehabilitate the site promptly to reduce the chances
garden beds at a depth of 75-100 mm. of further erosion

 

This will assist in plant establishment, minimise water
loss and help to control weeds.

Ensure that mulch is stabilised on unstable slopes (e.g. batters and riparian areas) to avoid it washing away and
ultimately entering waterways.

Page 44

MLL LL

 

Sediment control

STABILISED ENTRY/EXIT POINT (RUMBLE PAD)

  

¢ — Manage entry/exit point (rumble pad) so that sediment is not tracked laos
off the site. ;

¢ Restrict site access to one stabilised location.

* Recommended construction method for stabilising access points
is a 150-200 mm deep pad of minimum 40 mm crushed rock.

¢ — The pad should be at least 2 metres wide and extend from the kerb
to the building slab.

¢ Where the entry/exit pad slopes towards the road, a 200 mm high bund (hump) should be installed across the
pad to deflect stormwater run-off to the side where it can be filtered by a sediment fence.

Stabilised gravel entry/exit point (rumble pad)

Note: The location of the permanent driveway may not be an appropriate location for the construction entrance.
SEDIMENT BARRIERS/FENCES

¢ Install sediment barriers along the lower
side of the soil disturbance.

¢ The most efficient sediment barrier for
building sites is specially-manufactured
geotextile sediment fencing.

* — Sediment fences on building sites
are usually wire-tied to steel or hardwood
posts (wire-tied sediment fences have the
advantage of being more readily unhooked
from their support posts).

* The support posts are spaced no greater
than 2 metres apart and the sediment
fence buried to a depth of 200 mm.

 

¢ — For public safety and sediment control Sediment fence

efficiency, sediment barriers should not be
located outside property boundaries without Council approval.

* — Sediment barriers should only be placed on the road as a last resort.

* — Sediment barriers placed in front of roadside stormwater inlets are rarely as effective as onsite controls and
at best usually result in the sediment being washed down the street and into the nearest open gully inlet.

* — Only use proper geotextile sediment fence fabric. Don’t use filter cloth or shade cloth.

USE OF SIGNS im an Fhe
Public signs that warn of the need for proper sediment control devices and c : _
maintenance are becoming more widely used. Contact your council for further . AL,

information.

 

Sediment control information signage

Page 45

 

MAINTENANCE OF CONTROL MEASURES

All erosion, sediment and drainage control measures need to be regularly
checked and maintained in good working order. Best practice includes
anticipation of potential risks and being prepared for abnormal
circumstances and emergencies. These measures include:

* — Stockpile extra sediment fence fabric and posts on-site to facilitate
emergency repairs.

* — Reapply crushed rock to the entry/exit pad (rumble pad) when
sediment build-up occurs.

¢ — Repair eroded drainage channels with rock, turf or erosion control
blankets or matting.

e — Ensure built-up sediment is removed at regular intervals from
sediment barriers.

* — Check and replace/repair sediment barriers daily if they are ripped,
damaged or no longer anchored.

 

Excessive sediment deposits must be removed
from entry/exit point (rumble pad) and

Drainage control additional crushed rock applied

DIVERSION OF UP-SLOPE WATER

¢ Where practicable, divert up-slope water around the disturbed area.

e — Stormwater can be diverted with the use of small turf or geotextile lined catch drains, or with the use of
diversion banks.

¢ — Diverted stormwater should be discharged onto stable ground (for example turfed areas) and should not
be diverted into neighbouring properties unless written permission is obtained from the land owner(s).

EARLY ROOF WATER CONNECTION

* Temporary or permanent downpipes should be installed as soon as
practicable after the roof is laid.

* Early connection of roof water to the stormwater system will reduce site
wetness and the generation of on-site mud. This has been shown to
reduce downtime following storm events and decrease the average
building construction time.

 

Temporary roof water connection

Page 46

MLL LL

 

Building operations

Prior to commencing building work

¢ Obtain all necessary permits, licences and approvals.

¢ Prepare a site specific Erosion and Sediment Control (ESC) Management Plan and have all necessary
ESC materials available.

e Avoid clearing vegetation and excavating until ready to build.

e¢ Where necessary in new estates, temporary revegetation may be required.

Points to consider as part of building operations

* — Tool and paint washing, brick, tile or masonry cutting and water-cooled cutting activities should be done
within the property boundaries.

* — All waste water should be contained on-site where possible.
¢ — Activities should be carried out on a permeable surface or up-slope of an infiltration trench.

* — Vehicles should not be parked on the footpath area or verge where they can damage essential vegetation
and transport dirt onto the road.

* Contain waste concrete washed from trucks, mixers and barrows on site; do not wash out into stormwater
systems as this can clog drains and cause flooding during storm events.

LITTER AND BUILDING WASTE

All hard waste should be stored on-site in a way that prevents material loss caused by wind or water. Smaller
materials such as litter should be contained in covered bins or litter traps formed on three sides by a geotextile
wind break or similar device.

When travelling to and from the site, secure load to prevent wind blown litter polluting our waterways and roadsides.

 

One way to properly store building waste Poor litter and building waste storage

SITE CLEAN-UP

Remove accidental spills of soil or other materials from the road,

gutter or any location outside the control of the primary sediment

barrier:

¢ immediately if it is raining or likely to rain during the day

* at least upon completion of the day's work (even if rainfall is
unlikely during the night)

* use a broom and shovel instead of hosing to clean hard surfaces.

* — clean up food packaging after meal breaks as this litter can enter
stormwater systems and waterways.

 

Following storms, the road reserve and sediment barriers should be Undertake regular site clean-ups
inspected and excess sediment residue removed.

Page 47

 

CONCRETE MIXER CLEAN-UP

Fully contain concrete waste washed from trucks and mixer units on-site and store where it cannot be washed from
the site, harming the environment.

EXPOSED AGGREGATE CONCRETE SURFACES

¢ Builders need to demonstrate how they intend to prepare exposed aggregate surfaces without allowing cement
residue to flow into stormwater drains or waterways.

¢ Where practicable, wash cement residue onto pervious surfaces or fully contain it within temporary sediment
dams created from tightly stacked sand bags.

¢ When suitably dry, shovel cement residue into a waste disposal bin.
¢ — Atno time should cement residue or wastewater run-off enter the roadside gutter.

This may make it impractical on some sites for exposed aggregate driveways to be constructed. In such cases,
an alternative driveway finish must be used.

Storage of materials on hard surfaces

Whenever possible, materials should be stockpiled within the sediment
control zone and, where necessary, covered with waterproof sheeting to
minimise the potential for transport of sediments in stormwater.

Materials may be temporarily stored on hard surfaces only where it is
necessary to place erodible material on hard surfaces to undertake
work and no other reasonable options are available.

 

Don't store stockpiles on hard surfaces without
suitable protection

Grouped building lots

When one builder controls more than one building lot, combined-lot sediment control structures may be placed

down-slope if:

¢ the combined sediment control measures provide a level of protection at least equal to that provided by
individual lot protection

¢ — The builder accepts responsibility for the ongoing monitoring and maintenance of sediment control devices

* suitable drainage and erosion control measures are applied to each building lot

¢ — asuitable sign is placed in a prominent location outside each lot and/or at the entrance of the
estate indicating such controls are in place.

Page 48

MLL LL

\

 

Erosion and Sediment Control Management Plans

Where appropriate, discuss the submission of a management plan with the appropriate building control body.
These plans need to communicate to all - builders, subcontractors, private certifiers, home owners and regulators
involved in the building - how stormwater pollution will be controlled on the site.

EROSION AND SEDIMENT CONTROL INSTALLATION SEQUENCE

1.
2.
3.
4.
5.
6.
7.
8.
9.
1

0. Revegetate or otherwise stabilise the site.

Establish a single stabilised entry/exit point (rumble pad).

Install sediment fence(s) along the low side of the site.

Divert up-slope water around the work site and appropriately stabilise any drainage channels.
Clear only the areas necessary (maintaining vegetation on footpath).

Stockpile topsoil within the sediment control zone.

Stabilise exposed earth banks (for example, with vegetation or erosion control blankets).
Install on-site waste receptacles (mini-skips, bins, wind-proof litter receptors).

Install roof downpipes as soon as practicable after the roof is laid.

Ensure that all control measures are maintained in good working order.

 

  

* Stockpile is located behind the sediment fence * Stockpile has not been placed behind the sediment fence
¢ Good site planning ¢ Building waste and litter has not been placed in the skip
¢ Turf strip well maintained ¢ Poor site planning and management
¢ Sediment fence well constructed and in correct

location

Note: Diagrams and selected photos courtesy of Catchments & Creeks Pty Ltd.

Page 49

SUPPORTED BY

>.

 

a
Teo
Patong

Gold Coast City Council Dedicated to a better Brisbane

 

 

 

 

 

 

  

QMBA aN
fol r le MVE ie Housing Industry
Builders Association Association Ltd

417 Wickham Terrace PO Box 3573
Brisbane QLD 4000 South Brisbane OLD 4101
Ph: (07) 3404 6444 Ph: (07) 3846 1298
Fax: (07) 3832 2361 Fax: (07) 3846 3794
www.masterbuilders.asn.au www.hia.com.au

Copyright 2006
These guidelines are protected by Australian copyright law.
For permission to use any of the material, contact the
Brisbane City Council or Gold Coast City Council. Some photographs
and drawings are owned by Catchments & Creeks Pty Ltd.

aaa LANG ae

ees all inthe same boat _- = >

-

www.healthywaterways.org

we

’ Tre waren aT Saat tasteemy Beesit
= Treen

 

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019).pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.