Skip to the record
For the highest quality transcripts.

Council archive · source document

Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019) · RAL18/0023

of 49

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                             BIO-RETENTION                                                                                                                                                                                                                                              CATCHMENT 3659m2

                                                                                                                                             LOT 4

                                                                                                        KERB ADAPTOR INLETS
                                                                                                        TO BIO-RETENTION
                                                                                                        BASIN - TYPICAL




                                                                                                                                                                                                                LOT 6
                                                                                                                                                                 LOT 5




                                                                                                   H
                                                                                                    O
                                                                                                     FM
                                                                                                       A
                                                                                                        N
                                                                                                                                                                                                                                  BIO-RETENTION




                                                                                                         N
                                                                                                             D
                                                                                       2                                                                                                                                                                                                                                                                        LOT 8




                                                                                                               R
                                                                     CATCHMENT 1102m
                                                                                                                                                                           CATCHMENT 2247m2




                                                                                                                IV
                                                                                                                  E
                                                                      LOT 15

                                                                                                                                                                                                                                                                                                                   BIO-RETENTION




                                                                                                                                                                                                                          RIVE
                                                                                                                                                                                                                    ANN D
                           BIO-RETENTION                                                                                                                                                                     HOFM
                                                                                CATCHMENT 4060m2                                                                                                                                                                                                                                                        LOT 9



                                                                                                              B
                                                                                                              D                                                                                                                                                                                                                          CATCHMENT 2680m2
                                                                                                          ROA
           OUTLET SCOUR
          PROTECTION TO                                                                                                                                                                                                                                                                                       RO
            QUDM SPECS.                                                                                                                                                                                                                                                                                         AD
                                                                                                                                                                                                                              2                                                                                      A                                                    DISCHARGE INTO EXISTING
                                                                                                                                                                                                             CATCHMENT 1332m                                                                                                                                                STORMWATER NETWORK



                                                                                                                                                                                 LOT 16

                                                                                                                                                                                                                                                                                   SWALE 20m
                                                                    LOT 14


                                                                                                                                                                                                                                                                                                                                               BIO-RETENTION




                                                                                                                                                                                                                              B
                                                                                                                                                                                                                         AD                                                             LOT 10
                                                                                                                                                                                                                      RO




                                     BIO-RETENTION



                                                                                                                                                                      CATCHMENT 3652m2                                                                                                                                                                  LEGEND - NEW WORKS EXTENT
                                 OUTLET SCOUR                                                      LOT 13
                                                                                                                                                                                                                              LOT 11
                                PROTECTION TO                                                                                                                                                                                                                                                                                                                                STORMWATER DRAINAGE
                                  QUDM SPECS.
                                                                                                                                                                                                                                                                                                                                                                            EXTENT OF AC SEAL
                                                    BIO-RETENTION
                                                                                                                                                                                                                                                                                                                                                                            KERB & CHANNEL (B1 TYPE 450mm CHANNEL)
                                                                                                                                                                       LOT 12
                                                                                                                                                                                                                                                                                                                                                                            EXTENT OF 2m WIDE CONCRETE FOOTPATH


                                                                                                                                                                                                                                                                                                                                                    E                       EXTENT OF COMMERICAL DRIVEWAY
                                                                                                                                                                                                                                                                                                                                               IV
                                                                                                                                                                                                                                                                                                                                            R
                                                                                                                                                                                                                                                                                                                                           D
                                                                                                                                                                                                                                                                                                                                      AY
                                                                                                                                                                                                                                                                                                                                     H
                                                                                                                                                                                                                                                                                                                                ER
                                                                                                                                                                                                                                                                                                                            A LT
                                                                                                                                                                                                                                                                                                                                                                            ROAD CENTRELINE
                                                                                                                                                                                                                                                                                                                           W

                                                                                                                                                                                                                                                                                                                         PROJECT:                                                                       JOB NUMBER
REV DATE DESCRIPTION                                           BY    CHKD                                                             SCALE                                                      APPROVED
                                                                                                                                                                                                                                                                                                                                                                                                             1856
 J    02-12-19    REVISED FOR COMMENT                          MM     CL
                                                                             DATUM           AHD                                                                                                                                                                                                                                                                                                    SHEET:        OF
 B
 C
      16-07-19
      13-08-19
                  REVISED FOR INFORMATION REQUEST
                  REVISED DRIVEWAYS & PATHWAYS
                                                               MM
                                                               JP
                                                                      CL
                                                                      CL     DESIGN          MM
                                                                                                         0              10             20             30              40              50m      .................                                                                                                                                                                                              2        7


 D    28-08-19    REVISED ADDED LINK ROAD                      MM     CL                                                                                                                    Director: CAMERON LANDRETH                                                                                               DRAWING TITLE:                                                                 DRAWING NUMBER         REV
                                                                             DRAWN           MM
 E    25-09-19    UPDATE SW                                    CL     CL                                                                                                                              (RPEQ 19358)
                                                                                                                                    SCALE 1:1000 A3
 F    1/11/19     REVISED FOR COUNCIL RFI                      MM     CL     DESIGN CHECK     CL
                                                                                                                                                                                            DRAWING STATUS
                                                                                                                                                                                                                                                  07 5443 8285
                                                                                                                                                                                                                                                                                                                                                                                                     SW02                   J
 G    1/11/19     REVISED FOR COUNCIL RFI                      MM     CL                                                                                                                                                                          [email protected]      www.barlowshelley.com.au
                                                                                                        This drawing is not to be copied or amended without written permission from
                                                                             DATE           21-02-19                                                                                              FOR APPROVAL
 H   21-11-2019   DRAFT FOR COMMENT ONLY                       MM     CL                                Barlow Shelley Consulting Engineers                                                                                                       PO Box 899, Maroochydore,4558 ABN 89 215 591 077

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019).pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.