Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019) · RAL18/0023
Plans and drawings: the text below has words only, no drawings.
LOT 23
2.61 Ha
W
AL
TE
R
HA
Y
DR
IV
E
OUTLET OUTLET
LOT 2
LEGEND - NEW WORKS EXTENT
U
N
-N
AM
STORMWATER DRAINAGE
ED
R
EXTENT OF AC SEAL
O
AD
KERB & CHANNEL (B1 TYPE 450mm CHANNEL)
EXTENT OF 2m WIDE CONCRETE FOOTPATH
EXTENT OF COMMERICAL DRIVEWAY
ROAD CENTRELINE
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED
1856
J 02-12-19 REVISED FOR COMMENT MM CL
DATUM AHD SHEET: OF
B
C
16-07-19
13-08-19
REVISED FOR INFORMATION REQUEST
REVISED DRIVEWAYS & PATHWAYS
MM
JP
CL
CL DESIGN MM
0 10 20 30 40 50m ................. 5 7
D 28-08-19 REVISED ADDED LINK ROAD MM CL Director: CAMERON LANDRETH DRAWING TITLE: DRAWING NUMBER REV
DRAWN MM
E 25-09-19 UPDATE SW CL CL (RPEQ 19358)
SCALE 1:1000 A3
F 1/11/19 REVISED FOR COUNCIL RFI MM CL DESIGN CHECK CL
DRAWING STATUS
07 5443 8285
SW05 J
G 1/11/19 REVISED FOR COUNCIL RFI MM CL [email protected] www.barlowshelley.com.au
This drawing is not to be copied or amended without written permission from
DATE 21-02-19 FOR APPROVAL
Barlow Shelley Consulting Engineers PO Box 899, Maroochydore,4558 ABN 89 215 591 077
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.