Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019) · RAL18/0023
Plans and drawings: the text below has words only, no drawings.
Part 2: Construction phase — stormwater management design objectives for temporary drainage works Temporary drainage works PM ee CC Cem LC! PEL Cer Mrs PPro meld ey murs > Drainage structure 1in 2 year 1in5 year 1in 10 year 3 ARI/39% AEP ARI/18% AEP ARI/10% AEP 2 Where located immediately up-slope of an occupied 1in10 year ARI/10% AEP & property that would be adversely affected by the failure or overtopping of the structure Culvert crossing 1in 1 year ARI/63% AEP Part 3: Construction phase — stormwater management design objectives for emergency spillways on temporary sediment basins Drainage structure PM el CC Cem LC! PU ne Re Puc is cer PMC PPP MUO ry Emergency spillways on temporary sediment basins 1in 10 year 1in 20 year 1in 50 year ARI/10% AEP ARI/5% AEP ARI/2% AEP Note: Refer to IECA 2008 Best Practice Erosion and Sediment Control (as amended) for details on the application of the Construction Phase requirements. Advice should be obtained from a suitably qualified person e.g. Certified Practitioner in Erosion and Sediment Control, or Registered Professional Engineer Queensland, with appropriate knowledge and experience in erosion and sediment control design and implementation. State Planning Policy page 81
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.