Council archive · source document
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019) · RAL18/0023
Plans and drawings: the text below has words only, no drawings.
CONCRETE MIXER CLEAN-UP Fully contain concrete waste washed from trucks and mixer units on-site and store where it cannot be washed from the site, harming the environment. EXPOSED AGGREGATE CONCRETE SURFACES ¢ Builders need to demonstrate how they intend to prepare exposed aggregate surfaces without allowing cement residue to flow into stormwater drains or waterways. ¢ Where practicable, wash cement residue onto pervious surfaces or fully contain it within temporary sediment dams created from tightly stacked sand bags. ¢ When suitably dry, shovel cement residue into a waste disposal bin. ¢ — Atno time should cement residue or wastewater run-off enter the roadside gutter. This may make it impractical on some sites for exposed aggregate driveways to be constructed. In such cases, an alternative driveway finish must be used. Storage of materials on hard surfaces Whenever possible, materials should be stockpiled within the sediment control zone and, where necessary, covered with waterproof sheeting to minimise the potential for transport of sediments in stormwater. Materials may be temporarily stored on hard surfaces only where it is necessary to place erodible material on hard surfaces to undertake work and no other reasonable options are available. Don't store stockpiles on hard surfaces without suitable protection Grouped building lots When one builder controls more than one building lot, combined-lot sediment control structures may be placed down-slope if: ¢ the combined sediment control measures provide a level of protection at least equal to that provided by individual lot protection ¢ — The builder accepts responsibility for the ongoing monitoring and maintenance of sediment control devices * suitable drainage and erosion control measures are applied to each building lot ¢ — asuitable sign is placed in a prominent location outside each lot and/or at the entrance of the estate indicating such controls are in place.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.