Council archive · source document
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019) · RAL18/0023
Plans and drawings: the text below has words only, no drawings.
3.0 PROPOSED DEVELOPMENT The proposed development consists of 25 lots. An internal road services the proposed lots. The proposed development will comprise the construction and/or installation of the following components for land use purposes: · site earthworks and buildings (future) · access driveway and car parks · stormwater drains · other ancillary services · landscaping. Once the development has been completed, all disturbed portions of the site will be rehabilitated or covered by some form of protection against soil erosion and the transportation of suspended solids from the site. These improvements will include structures, paved areas and landscaping. Site Based Stormwater Management Plan Page 3 of 22 1856-SBSMP-01_Version 5.0 (December 2019)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Stormwater Management Plan 1856-SBSMP-01 v5 (December 2019).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.