Council archive · source document
Supporting Documents 47 Wyuna Dve Noosaville · OPW17/0015
Attached to the e-mail Operational Works Application OPW17/0015.
Department of Environment and Heritage Protection Notice Sustainable Planning Act 2009 Land Act 1994 Decision — owner’s consent This notice is issued by the Administering Authority pursuant to sections 261,263 and 271 of the Sustainable Planning Act 2009 to provided owner's consent as delegated under the Land Act (Ministerial) Delegation. Our reference CR2372 Ms J M Marr C/- Aqua Pontoons PO Box 1090 PARADISE POINT QLD 4216 [email protected] Dear Mel Re: Request for granting of owner’s consent for proposed application for tidal works on State land below high water mark The Department of Environment and Heritage Protection, under the Land Act (Ministerial) Delegation has assessed your application received on 20 December 2016 and wishes to advise you of the decision as specified below: Property owner: JACQUELINE MELANIE MARR Activity: Prescribed Tidal Works Activity description: Pontoon and gangway Drawing No. AP3150-01 Revision A Dated 13/12/16 Plan / Drawing number: Drawing No. AP3150-02 Revision A Dated 13/12/16 Drawing No. AP3150-03 Revision A Dated 13/12/16 Drawing No. AP3150-04 Revision 0 Dated 16/11/16 47 Wyuna Drive, Noosaville Qld 4566 Description of subject land: Lot 23 on N10575 Owner's consent has been granted. The application may proceed. Decision Standard conditions may apply Decision Number SPOC08895617 crea ee Cota yee ae Page 1 of 2 + 141204 » EM500 - Version 4 ABN 46 640 294 485 ene
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
Notice Decision — owner’s consent Owner's consent can be used to support a development application until 3 January 2018. Should the development application not be lodged with the assessment manager prior to this date, you will be required to lodge a further request for owner's consent. THIS DECISION IS CURRENT FOR 12 MONTHS Although owner’s consent to the development application has been provided and no tenure under the Land Act 1994 is required, works can only commence when the development application has been approved by the assessment manager, and in accordance with the conditions of that approval. The provision of owner's consent over State land means that the State has no objection to the lodgement of the application for a development approval. It does not: e imply approval of the development application; or e authorise a right to use and occupy land. The State may act at a later date as assessment manager, concurrence/referral agency, or technical agency in the assessment of the development application — providing owner's consent will not influence any statutory role the State may have in this assessment. If the development application involves a State resource in addition to State land, then the allocation or entitlement to use the State resource is a separate process and should be obtained prior to development commencing. You will also need to comply with all other legislative and regulatory requirements which may include approvals that are not part of the assessment of the development application under the Sustainable Planning Act 2009 (SPA) e.g. a marine park permit if in a marine park. A copy of this notice is to be attached to your IDAS Form 1 as the required evidence of owner's consent. If you require more information please contact Anna Simonutti on the telephone number listed below. Yours sincerely Signature Delegate Enquiries: Dean Raihman Anna Simonutti Manager Environmental Support Officer Department of Environment and Heritage Industry Sector Regulation and Support Protection Department of Environment and Heritage 3/1/17 Protection P 07 3330 5737 Level 8, 400 George Street, Brisbane. Q 4000 GPO Box 2454 Brisbane Q 4001 ‘Page 2 of 2 * 141204 * EM500 « Version 4 Department of Environment and Heritage Protection
Page 3
SARA reference: SPL-1116-035358 Date: 20 December 2016 Melissa Dyer Aqua Pontoons Pty Ltd 12 Fernleigh Court CURRUMBIN QLD 4223 [email protected] Dear Melissa Dyer Queensland Government Department of Infrastructure, Local Government and Planning Concurrence agency response before application is made—with conditions 47 Wyuna Drive, Noosaville (Lot 23 N10575) (Related to section 271 and given under section 285 of the Sustainable Planning Act 2009) Reference is made to your correspondence dated 28 November 2016 requesting the Department of Infrastructure, Local Government and Planning provide a referral agency response for the proposed development before the development application is made to the assessment manager. Applicant details Applicant name: Applicant contact details: Site details Aqua Pontoons Pty Ltd Melissa Dyer 12 Fernleigh Court CURRUMBIN QLD 4223 [email protected] Street address: Real property description: Site area: Local government area: Application details 47 Wyuna Drive, Noosaville 23 N10575 612m? Noosa Shire Council Proposed development: Page 1 Development Permit for Operational Work - Tidal works (Pontoon System) SEQ North Region Level 8, Mike Ahern Building 12 First Avenue PO Box 1129 Maroochydore QLD 4558
Page 4
SPL-1116-035358 Aspects of development and type of approval being sought Development type: Operational work Approval type: Development permit Referral triggers The development application would be referred to the department under the following provisions of the Sustainable Planning Regulation 2009: Referral trigger: Schedule 7, Table 2, Item 13 — Tidal works (Coastal protection) Schedule 7, Table 2, Item 15 — Tidal works (Maritime safety) (Fast track) Documents supplied to support request Plan / Report title Author Reference no. Version and date Site Plan, Pontoon Plan & Aqua Pontoons AP3150-01 Revision A, dated General Notes 13/12/2016 Conditions Under section 287(1)(a) of the Sustainable Planning Act 2009, the department requires that the conditions set out in Attachment 1 attach to any development approval. Reasons for decision to impose conditions Under section 289(1) of the Sustainable Planning Act 2009, the department is required to set out the reasons for the decision to impose conditions. These reasons are set out in Attachment 2. Pursuant to section 272(3) of the Sustainable Planning Act 2009, you will not be required to refer your application to the department if you submit this response in its entirety when making the application to the assessment manager, and the following conditions are satisfied: e Any changes to the proposal before the application is made to the assessment manager do not result in a substantially different development to that which was presented to the department with the request for a referral agency response e The development application must be made to the assessment manager within 12 months of the date of this referral agency response. If you require any further information, please contact Tom Kasauskas, Senior Planning Officer, on 5352 9717 or via email [email protected] who will be pleased to assist. Yours sincerely Department of Infrastructure, Local Government and Planning Page 2
Page 5
SPL-1116-035358 Garth Nolan Manager (Planning) enc: Attachment 1—Conditions to be imposed Attachment 2—Reasons for decision to impose conditions Attachment 3—Approved plans and specifications Department of Infrastructure, Local Government and Planning Page 3
Page 6
SPL-1116-035358 SARA reference: SPL-1116-035358 Attachment 1—Conditions to be imposed No. Conditions Condition timing Operational work 7.2.13 — Tidal works - Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Environment and Heritage Protection to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): 1. All works are to be constructed and maintained in a safe condition | at all times in accordance with the following plan: e Site Plan, Pontoon Plan & General Notes, prepared by Aqua Pontoons, dated 13/12/2016, reference AP3150- 01, revision A. 2. The works to which this approval relates are to be for a private At all times purpose only. 3. Any operator and contractor involved in the works to which this During construction approval relates must: (a) be provided a copy of the these referral agency conditions; (b) install all measures, plant and equipment necessary to ensure compliance with the conditions of this approval; (c) maintain such measures, plant and equipment in a proper and efficient condition; and (d) operate such measures, plant and equipment in a proper and efficient manner. 4. For the proposed works only use materials which are free from During construction contaminants as defined under section 11 of the Environmental Protection Act 1994. 5. Should the works become damaged as a result of erosion, At all times flooding or storm tide inundation, the registered landowner(s) of the subject land shall be responsible for the removal of all debris at their own expense. 7.2.15 Tidal works - Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Transport and Main Roads to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): 6. The development must be carried out generally in accordance At all times with the following plan: e Site Plan, Pontoon Plan & General Notes, prepared by Aqua Pontoons, dated 13/12/2016, reference AP3150- 01, revision A. Department of Infrastructure, Local Government and Planning Page 4
Page 7
SPL-1116-035358 No. Conditions Condition timing The structure must be lit/marked in accordance with the following specifications, such that it does not cause a risk to the safe navigation of other ships: e section 3 of AS4282-1997 Control of the obtrusive effects of outdoor lighting At all times The construction, operation or maintenance of the structure, and any ship berthed, moored or attached to the structure, must not: © encroach into, pass over or under a navigation corridor; or e be located in a high risk maritime zone At all times Any debris or similar obstruction generated whilst undertaking the work must be removed from the waterway and suitably disposed of at the applicant's expense. While works are occurring 10. All piles and/or structures to be demolished, both above and below the waterline must be completely extracted/removed. Prior to the completion of the works Department of Infrastructure, Local Government and Planning Page 5
Page 8
SPL-1116-035358 SARA reference: SPL-1116-035358 Attachment 2—Reasons for decision to impose conditions The reasons for this decision are: e Development works must comply with the approved plans to avoid unacceptable impact on coastal values and physical coastal processes. RPEQ signoff indicates the development is appropriately designed and is structurally sound. e Ensures that the coastal resource (State land) is appropriately administered under the Coastal Protection and Management Act 1995 and the Land Act 1994 e Ensures impacts on coastal values (water quality) are avoided or minimised. e Ensures importation of materials does not result in adverse impacts on coastal values. Chemical and other contaminants have the potential to have an unacceptable impact on coastal values. e Damaged structures can impact on coastal resources and public safety e Toensure the development is carried out generally in accordance with the plans of development submitted with the application e Toensure that at all times, all lights on or above the development site do not interfere with safe navigation in surrounding waterways. e Toensure the development does not encroach on the navigation corridor to ensure the safe passage of vessels. e Toensure that debris from the development does not create a hazard to navigation. e Toensure that there is no residual material that could create a hazard to navigation. Findings on material questions of fact ° The combined extent of the proposed pontoon and the maximum beam of any moored vessel does not encroach into the navigation corridor in this location. e The proposed structure is situated more than 1.5 metres from the side boundaries of the water allocation. Evidence or other material on which the findings were based e Development application e State Development Assessment Provisions published by the Department of Infrastructure, Local Government and Planning e Sustainable Planning Act 2009 e Sustainable Planning Regulation 2009 Department of Infrastructure, Local Government and Planning Page 6
Page 9
SPL-1116-035358
SARA reference: SPL-1116-035358
Attachment 3—Approved plans and specifications
SH Ova] oy
asta
MOEIZL/EL
ase
Lo-0SiEd¥
pa nwavot |
JVEANSOON
JAE YNTAM LT scawer
we INTSNOIYT sw
Ee
Sain HEINDS BWV 1d NODINDS NV Id ZLIS 2a 9
AYMONYS 2 HGOLNOd GISOdOUd saxsvs
SuG LOE MEL
neworsuooyuodeabe mam
imma zeaty] SNOGLNOd VAUY
aiaanaae nose | eva [aay] #9 NOLLINULSNOD IMBYW ¥ NECN
| es 20s = orem
ROBIE ADELOS
FUPLEIAMLS MIN ONTTELSNI OL BORE aie
GFAONTY 34 OL S8NL MILLS INU SIXZ
SION
sudan
ADS Het
Suv TMG? ft
SSION TRaaNGo
3 SE501N BI NO 3
: &@ 107 3 2107
& 5
SHUM SIU PMS
SOD NaN
NRLSIXS
Att SS
Page 7
Department of Infrastructure, Local Government and Planning
Page 10
CURRENT TITLE SEARCH DEPT OF NATURAL RESOURCES AND MINES, QUEENSLAND Request No: 24700352 Search Date: 16/11/2016 00:27 REGISTERED OWNER Dealing No: 717407261 26/07/2016 JACQUELINE MELANIE MARR ESTATE AND LAND Estate in Fee Simple LOT 23 CROWN PLAN N10575 Local Government: NOOSA EASEMENTS, ENCUMBRANCES AND INTERESTS Title Reference: Date Created: 1. Rights and interests reserved to the Crown by Deed of Grant No. 15962107 (ALLOT 23 SEC 1) ADMINISTRATIVE ADVICES - NIL UNREGISTERED DEALINGS - NIL CERTIFICATE OF TITLE ISSUED - No ** End of Current Title Search ** 15962107 02/04/1980 COPYRIGHT THE STATE OF QUEENSLAND (DEPT OF NATURAL RESOURCES AND MINES) [2016 Requested By: D-ENQ CITEC CONFIRM Page 1/1
Page 11
FOR OPENING NOTIFICATIONS SEE BACK
[oor nal Farm ve |
TRAVERSES ETC.
0575 V0 Page 1 of 2 Not To Scale
DRAWING _OF PLAN MUST BE RESTRICTED TO THE SPACE INSIDE THE BLUE LINES
rs OF | OPE eae a ee ‘
| ot \" 66028 yn | ae = ;
Oy | Ozzeosee | wT | Ie Hide. oa + es
or (S0o9i2| wd | 22 mM wl] gis \
ou (blobSt| id?) 22 SBI GEOFEED VR Pap Tow S70U09 THUG TY _ 8 8 : a
01 | Ob 0betd| WdT . qwiay Pee S See t
or (26ol62 | dt Be QoL
| o1 | ,0%be0z01) HaT as 8 Sas wn
or | g0o09e| WT g & = §
or 190008 | Wid? $ SS BS Se in
aS
Wess se
. WEES — 880% NIN vy ail ie
: 2 ¢ : 2 S&L > 8 Z.
9 Gene L Oll “40d s SoH
, RWS8e ss
x Ssq su
SSpo:
VT Ara
©
| [ SIZ SK { i 8
loll 25 gq, OSE Se >
S261 £82 9
Se p—S uz g ; x
x u
: >C} 2 TTR
{850902 Oe Wj Fs 8
B63;
Soe0e a 2 g
= G
fe. = »
28S f nis ows
128 ue
£4 x
whge [SE mel;
622. = as
Hoge f = BS we, GHEY ‘ x
469,. [52 wos2hS, 601 ‘YOd 1
s2S029)77 [2 Foe 3 gl
a4 Ri
ganze | ,0e2e00s) \92-52| oe tar— 8 2 So
GIGLI | £0.68 [bee : a <<
g19-51\ 610M \22-12 a H 8 a
$88-9) Pehl! \02-61 = ay g
ge2-5) | 90008 | a-d! Z
g9e-91 | 29068 | StS! 5
eae} | O%LGob6! | 1-2 & |e
220-89 | OG QoL? | 1-2 S y &
9 | kodd | £-9 SNS) [8
eor-it |, 86200882 | 2-9 a 3
250-9 | 022060! | 21-$ nas Se s} [8 Q
aeege!| g0oke! | 9 ORS, ERs] ye Ww
ge | Mocae | 6-2 . a 5 x
60-191 | ,19,0loel | £2 wang, x 5 ui
92 (ble69! | 8-1 = sraareceeaaci 5 3 WW
£018 | ,LE6bSEE| 2-1 Oe 28> 7 \ ig ve c
‘ re $
751g | _oMigwae | 307 "90,8, 4 acl 5 Z ‘ 5
SWOILIFNNOD ake tN aK : us 3
- ay : EK =
L | 2 z 9) &
Bite VSI sil |E
261 NE ti x a
5 ay NG as igs 9
a
Lx] [J | is 7
=
3 ws 2 : S| ls 3
= use 2) S| |e 9
5 helt &
3 yg 10 ary |§ 6
“ws 1D
¥ ‘4S 10 E E
§ Blea] 8 :
anvug | __isig | onevae Eyl |E ly
SHAW JONTHIITY ys * [2 |
SENFT SATE SHL SGISNT SOVaS SHI OL GsL5Ie1S3e 38 IsAw Nvia JO SNIMVEC
Page 12
THE BLUE LINES
DRAWING OF PLAN MUST BE RESTRICTED TO THE SPACE iNSIOE
OPENING NOTIFICATIONS SEE BACK 7 a
‘POR. WO] TENURE J
0009"
| R.1392 Res. for Park GGI98I1.2. 2477
“R1393 7 . " ‘
R.1394 a
Allot | of Sec.
. 31°
« 6@* *
DIANINVATAAAAARAANIMA AAA
2p S98 0 G ED H C9 O to OD & [9 994 OH HY
Reh ehhh ssid 5
i
(oy
NI
FEO FIZ PO
AUMUND pally topypalY=S~S~ S585 Hs = im
z FBO. 415>
Ss
4% =
GINA N79 FHL JOIN BOWES FHL OL GUMYLSIY 3G ISAM NV Id 40 ONIM VEO
. " @ Pi
% *
mr, sat . é
ae "
For Additional Plan &
Document Notings
Refer to CISP
MERIDIAN
sity thet tthe company ewe pry fle, AMG. P LAN OF
jend comprised in this plan (either personally or by ee ww
ey eet tinea.” of [lire pi PARISH. _
{ai Ghose work wine “company accept responsibil),
Se eas we nee an County . nit
se the Seayors Reglaions Y9T8 and rat ine old al
Se D wae. LADistrict _
ier ‘DAS. REF ‘DRAWN | REGISTERED | CNAATED MAP REE.
pranN1057.5Sh.2
CROWN COPYRIGHT RESERVED . DEPARTMENT OF MAPPING AND SURVEYING , QUEENSLAND.
Page 13
TO WHOM IT MAY CONCERN AUTHORITY TO LODGE MARINE BERTHING APPLICATIONS As the registered owner/s of the property described below, I/we hereby authorise Aqua Pontoons Pty Ltd to lodge any applications associated with the required approvals for a marine structure adjacent to the specified land and to make any required enquiries in regard to such applications on my/our behalf. Address of Property: seqicig nea tonieus 47 Wyuna Drive, Noosaville, QLD, 4566................... cee Lot Number: ...... Beak cimues Plan Number: ......... NST Se eeeilacarees Registered Owners: NAME IN FULL SIGNATURE DATE a ve line Mace BAW WOK ent) Adib \ Authority to Act ~ (Private) 2012
Used in these records
Supporting Documents 47 Wyuna Dve Noosaville.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.