Council archive · source document
Supporting Documents 47 Wyuna Dve Noosaville · OPW17/0015
Attached to the e-mail Operational Works Application OPW17/0015.
SPL-1116-035358 SARA reference: SPL-1116-035358 Attachment 1—Conditions to be imposed No. Conditions Condition timing Operational work 7.2.13 — Tidal works - Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Environment and Heritage Protection to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): 1. All works are to be constructed and maintained in a safe condition | at all times in accordance with the following plan: e Site Plan, Pontoon Plan & General Notes, prepared by Aqua Pontoons, dated 13/12/2016, reference AP3150- 01, revision A. 2. The works to which this approval relates are to be for a private At all times purpose only. 3. Any operator and contractor involved in the works to which this During construction approval relates must: (a) be provided a copy of the these referral agency conditions; (b) install all measures, plant and equipment necessary to ensure compliance with the conditions of this approval; (c) maintain such measures, plant and equipment in a proper and efficient condition; and (d) operate such measures, plant and equipment in a proper and efficient manner. 4. For the proposed works only use materials which are free from During construction contaminants as defined under section 11 of the Environmental Protection Act 1994. 5. Should the works become damaged as a result of erosion, At all times flooding or storm tide inundation, the registered landowner(s) of the subject land shall be responsible for the removal of all debris at their own expense. 7.2.15 Tidal works - Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Transport and Main Roads to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): 6. The development must be carried out generally in accordance At all times with the following plan: e Site Plan, Pontoon Plan & General Notes, prepared by Aqua Pontoons, dated 13/12/2016, reference AP3150- 01, revision A. Department of Infrastructure, Local Government and Planning Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Supporting Documents 47 Wyuna Dve Noosaville.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.