Supporting Documents 47 Wyuna Dve Noosaville · OPW17/0015

Attached to the e-mail Operational Works Application OPW17/0015.

of 13

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

SPL-1116-035358

SARA reference: SPL-1116-035358

Attachment 1—Conditions to be imposed

 

 

No. Conditions Condition timing

 

 

Operational work

 

7.2.13 — Tidal works - Pursuant to section 255D of the Sustainable Planning Act 2009, the chief
executive administering the Act nominates the Director-General of the Department of Environment
and Heritage Protection to be the assessing authority for the development to which this
development approval relates for the administration and enforcement of any matter relating to the
following condition(s):

 

1. All works are to be constructed and maintained in a safe condition | at all times
in accordance with the following plan:

e Site Plan, Pontoon Plan & General Notes, prepared by
Aqua Pontoons, dated 13/12/2016, reference AP3150-
01, revision A.

 

2. The works to which this approval relates are to be for a private At all times
purpose only.

 

3. Any operator and contractor involved in the works to which this During construction
approval relates must:

(a) be provided a copy of the these referral agency conditions;

(b) install all measures, plant and equipment necessary to ensure
compliance with the conditions of this approval;

(c) maintain such measures, plant and equipment in a proper and
efficient condition; and

(d) operate such measures, plant and equipment in a proper
and efficient manner.

 

 

4. For the proposed works only use materials which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.

 

5. Should the works become damaged as a result of erosion, At all times
flooding or storm tide inundation, the registered landowner(s) of
the subject land shall be responsible for the removal of all debris
at their own expense.

 

 

7.2.15 Tidal works - Pursuant to section 255D of the Sustainable Planning Act 2009, the chief
executive administering the Act nominates the Director-General of the Department of Transport and
Main Roads to be the assessing authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following condition(s):

 

6. The development must be carried out generally in accordance At all times
with the following plan:
e Site Plan, Pontoon Plan & General Notes, prepared by
Aqua Pontoons, dated 13/12/2016, reference AP3150-
01, revision A.

 

 

 

 

Department of Infrastructure, Local Government and Planning Page 4

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Supporting Documents 47 Wyuna Dve Noosaville.pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.