Original source · versioned page text
BR210522_SBSMP_Rev6
Very large file (17.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 41, section 1. The text section number identifies this passage in the reader.
NOOSA PLANNING SCHEME – WATER QUALITY AND DRAINAGE CODE
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Developments located on groundwater
recharge or discharge areas are designed and
managed in accordance with a groundwater
recharge and discharge management plan
prepared by a suitably experienced and
qualified groundwater hydrologist. The
groundwater recharge or discharge must
demonstrate that the development does not
affect groundwater balances beyond the
property boundaries.
Editor's Note— PSP6 Engineering Design
Standards - Roads, drainage and earthworks
provides guidance on prepare a groundwater
recharge and discharge plan.
Construction and establishment stormwater management systems Table 9.4.8.3 Criteria for assessment
Construction and establishment of stormwater AO14.1 Suitable Sediment and Erosion Control
management systems An erosion and sediment control plan prepared measures, including adequate dust and
PO14 in accordance with the International Erosion noise suppression and management
Construction methods provide for appropriate Control Association Best Practice Books measures are expected to be in place during
controls to avoid entry and transport of litter, demonstrates that the capture and release of construction.
sediment, and associated prescribed water stormwater achieves the design objectives
contaminants into receiving waters. listed in Table A: Construction phase –
stormwater management design objectives of
Editor's note— Water contaminants are the State Planning Policy (Appendix 2).
prescribed in the Environmental Protection Act
1994. Editor’s note— PSP6 Engineering Design
Standards - Roads, drainage and earthworks
provides guidance on requirements for
preparing an Erosion Management Plan.
AO14.2
BUNNINGS NOOSAVILLE Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.