ORDINARY MEETING MINUTES 21 JANUARY 2021
B. Approve the Community Engagement and Communications Plan, as provided in
Attachment 5; and
C. Note that updates have been made to the coastal hazard mapping of erosion for
beachfront areas between Peregian Beach and Sunshine Beach and that this
updated mapping has been made available to the public through Council’s online
mapping via Council’s website.
Carried unanimously.
Crs Lorentson and Stockwell returned to the meeting.
4 MCU20/0097 APPLICATION FOR A DEVELOPMENT PERMIT FOR MATERIAL
CHANGE OF USE FOR SHORT TERM ACCOMMODATION AT 1/27 HILL STREET,
SUNSHINE BEACH
Council Resolution
Moved: Cr Wilkie
Seconded: Cr Stockwell
That Council note the report by the Coordinator Planning to the General Committee
Meeting dated 18 January 2021 regarding Application No. MCU20/0097 for a
Development Permit for Material Change of Use - Short-term accommodation situated
at 1/27 Hill St, Sunshine Beach and:
A. Approve the application in accordance with the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be
complied with prior to the use commencing, and then compliance maintained
at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are
listed in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
18-076 - 04 4 Proposed Ground Floor Plan prepared by ICON 03.05.2019
Building Design as annotated by Council
18-076 - 05 4 Proposed First Floor Plan prepared by ICON 03.05.2019
Building Design as annotated by Council
18-076 - 06 4 Elevations prepared by ICON Building Design 03.05.2019
as annotated by Council
18-076 - 07 4 Elevations prepared by ICON Building Design 03.05.2019
as annotated by Council
Currency
3. This development approval lapses if the use has not happened by 21
January 2027, unless an application to extend the currency period is
approved by Council.
Nature and Extent of Approved Use
4. The total number of bedrooms on the site must not exceed 2.
5. No more than 4 guests may occupy the premises at any time.
Page 8 of 16