MCU16.0099.01, RAL19.0036 & OPW 19.0282.01 - Response to Information Request (final) 10.03.2020 · MCU16/0099.01
Aurecon Australasia Pty Ltd T +61 7 3173 8000
ABN 54 005 139 873 F +61 7 3173 8001
Ground Floor, 25 King Street E [email protected]
Bowen Hills QLD 4006 W aurecongroup.com
Locked Bag 331
Brisbane QLD 4001
Australia
Memorandum
To Adam Pfitzner From Con Sweeney
Matthew Dunworth, Mitti Goon,
Copy Reference 247473-CROIBH
Tom Montgomery
Pages
Date 2020-02-19 (including this page)
8 + Appendices
Subject Cooroibah waterway crossing – access construction trafficability
A site investigation of the waterway crossing located on Lot 46 at 23 Jirrima Crescent in Cooroibah
included geotechnical testing at the concrete crossings edges, and assessment of the trafficability of
the concrete crossing. Discussions with the land owner about the crossing construction as well as
visual inspection notes have been detailed.
1 History of water crossing
The following information on the history of the waterway crossing was obtained from the land owner’s
recollection 20-25 years ago, when the crossing was first constructed:
◼ Initially around $900 worth of rock was dumped into the waterway to form a crossing. All rock
eventually sunk into the waterway.
◼ The land owner was a concrete truck driver who would intermittently place leftover concrete over
the waterway. Over time, the concrete gradually formed the existing crossing.
◼ The concrete strength may vary between 20MPa to 40MPa.
◼ It has been confirmed that there is no steel reinforcement in the concrete crossing.
◼ The concrete thickness varies between 200 - 400mm and potentially 450mm in the middle of the
crossing. The concrete thins out towards the vehicle access edges on the eastern and western
sides.
◼ Concrete lines the dam edge 1-2 m into the water on the southern side of the crossing (opposite to
the property fence).
◼ It has been advised that RFSQ (Rural Fire Service Queensland) have previously used the crossing
to access properties on the western side of the crossing in emergencies.
2 Visual inspection of concrete crossing
The following observations were made upon visual inspection of the extent of the concrete crossing:
◼ Crossing dimensions: 26m (East to West) x 13.5m (North to South). The crossing dimensions are
marked on the image of the crossing in Figure 1.
Project 239146 File Pavement repair design fee proposal: Curlew street 2020-02-192020-02-19 Revision A Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU16.0099.01, RAL19.0036 & OPW 19.0282.01 - Response to Information Request (final) 10.03.2020.pdfRelated documentApplication case desk ↗