Development Application - Part 1 of 2 - Covering letter, IDAS Forms 1 & 28, DTMR Response Letter and Cardno Letter · OPW12/0241

of 16

Text shows just the words. Original shows the document exactly as it was published.

                                                                                      SCRC CORRESPONDENCE



                                      Place Barcode here                            IJ1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 11 1 1 1 @
                                                                                                80474887

        THIS IS THE NEXT PART OF A
      MULTIPLE PART RECORD

                         Part                  l     ofd      -




    Application number:                                    Or\}’l /d{(J}4/
          C:\Documents and Settings\eje\Desktop\Multi Part Record Cover Sheet NEXT PART
                                                                                          (3).doc




/




                                                                                                       .JS/~3                     10      I
Full text of the other 15 pages

Page 2

                                                                                                                ’It,       f




                                 SPE~I.LIST
                      SERVICING THE EAST COAST OF AUSTRALIA AND SOUTH PACIFIC REGIONS




         30th July 2012

         Sunshine Coast Regional Council
         Locked Bag 72
         Sunshine Coast Mail Centre Qld 4560



         ATIENTION:- DENIS WALLACE                                                            /


         RE:          BODY CORPORATE FOR JALYNCA CTS 10090
                      LOT 0 (87)NOOSA PDE
                      NOOSA HEADS                   QLD          4567

         Pursuant to the Sustainable Planning Act 2009,we wish to make application
         for Prescribed Tidal Works under the legislation that was adopted on 18
         December, 2009.

         Please find attached:


                 1.   IDAS Forms 1 and 28
                 2.   Two full sets of plans including constructional details
                3. Proof of the land owner
                4. Concurrence response from Queensland Transport (Regional Harbour
                      Master)
                5.    Required Fee for the application.


         We look forward to receiving correspondence from Council within the
         designated timeframes pursuant to the Sustainable Planning Act 2009.


                             npevelopnlent Ccunter
                            pecialist                                   2
                                                   3 1 JU~ 1

                                       1\ /I,..,
                                       IVlal vv    ’,-r’/.....Ch.y-~OI"’O
                                                           . I   .._,       .._,



                                                        ----




         MR STEVE BELT
         Applications Officer                                                                                             "




THE MARINA SPECIALIST PTY LTD TRADING AS THE JETIY SPECIALIST
2 Industrial Avenue, Caloundra Queensland 4551 Australia

Telephone 07 5492 5925        Freecall 1300 133155             Facsimile 07 5492 6699
                                                                                        -
                                                                                            ABN 32 010 633119
                                                                                                                       I.Quality
                                                                                                                       Endorsed
Web Page   -

               www.thejettyspecialist.com.au         Email [email protected]
                                                                                                                       Company
                                                                                                                     ISO 9001:2000
                                                                                                                   UcNo.OEC14$32
                                                                                                                   S~AuIlf’"

Page 3

                                                          ,         .’
                                                                   ,        ~^.
                         ,’"
                                                         "j.>"."",.                                 ,                         I     ,I J
                    11’.11,                 ’Integrated D~ve   6J~’ ~~’~s~essment System form                        rf m ~                 .




                                                                                                                                  ,.+=I-,
                               I

                                                                   ,
                                                                                                                    ~I"’"M-
    !,
           Application ’Details -’ID,AS form,t
                                       ..




           (Sustainable Planning Act 2009 version 1,0 effective 18 December 2009)

                                                                                _."..
           You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
           necessary information and documentation will result in your application not being a properly made application.

           For all development applications, you must:

           .            complete this form (Application details IDAS form 1)
                                                               -




           .
                        complete any other forms relevant to your application

                        provide any mandatory supporting information identified on the forms as being required to accompany your
                    ;
                        application.
           All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
    .;.;
           Planning Regulation 2009,

           Applicant details (note:the applicant is the person responsible for making the application and need not be the
           owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is

           correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
t          be issued to the applicant.)


           Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
           applicant" button below.


           Name/s (individual or company name in full)                   IBOdY Corporate Jalynca
                                                                                            for         CTS 10090


           For companies, contact name                                   IJulie Daddow (WhittlesAustralia)
                                                                         C/- The Jetty Specialist, 2 Industrial Av, Caloundra Qld
           Postal address
                                                                         4551


           Contact phone number                                          10754925925
           Mobile number (non-mandatory)


           Fax number (non-mandatory)                                    10754926699
           e-mail address (non-mandatory)




           1. What is the nature of development proposed? (tick all applicable boxes)



         ’0 material change of use of premises
           o building work
    .,"’[:8J operational work
           o reconfiguring a lot




    .
     .      ,                                    ",’",

            Department of Infrastructure’and P.I~nning                   .;;,
                                                                                 ’Qp{an’,
            ,

                "



                                             ,
                                                                   ",
                                                                                              ,,’,
                                                                                                              @QUeenSland
                                                                                                                      Government

Page 4

 DDD
12. What type of approval is being sought?
 IZI development permit
 D preliminary approval
 D     both     -
                    provide details below



 3. Is the application for a mobile and temporary
                                                              environmentally relevant activity (ERA)?

 IZI   No

 DYes complete table A and then go to question 5
                -




4. Location of the premises (complete table B and/or table C as
                                                                               applicable. Identify each lot in a separate row)

Table B         street address/lot for the premises or street address/lot on plan for the land
            -

                                                                                                    adjoining or adjacent to the
premises

                                                                                     Lot on plan
                     Street Address
                                                                                     description
                                                                                                           Local government area
                     Unit   Street       Street name and official       Post               Plan type          (e.g. Logan,Cairns)
                                                                                Lot No.
                     No.     No.          suburb/locality name          code              and plan no.


            1               87       Noosa Pde, Noosa Heads         4567        0         BUP5103         Sunshine Coast

D Street address /Iot on plan
   Street address / lot on plan for the land adjoining or adjacent to the premises
[gIwater                                                                                      (appropriate for development in
            e.g. jetty, pontoon)                 -




Table C     -
                premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)


                    Coordinates (note: place each set of
                    coordinates in a separate row)                         Zone                                Local government
                                                                                              Datum
                                                                         reference                             area   (If applicable)
                      Easting        Northing   Latitude    Longitude

                                                                                          D GDA94
                                                                                          DWGS84
            1
                                                                                          D other


5. Total area of the premises on which the,development is
                                                                         proposed (indicate hectares or m2)
27m2

6. Current use/s of the premises (e.g.vacant land, house, apartment
                                                                                    building, cane farm, etc.)


        11 1        Multi Residential units




7. ProvidE!’ a brief description of thE! proposal (e.g.six unit apartment
                                                                                    building, 30 lot residential subdivision etc.)

Pontoon system including access gangway and restraint piles




                                                                                                    Application Details   -
                                                                                                                              IDAS form 1
                                                                                                         Version 1.0 18 December 2009

Page 5

ODD
8. Is owner’s consent required for this application? (refer to notes at the end of this form for more information)



fZI No
DYes complete either table D, table E orla’ble F as applicable
              -




9. Does the application involve a state resource? (e.githe application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)



fZI No                                    DYes complete table G
                                                  -




10. Identify if any of the following apply to the premises (tick applicable boxles)



fZI      adjacent to a water body, watercourse or aquifer (e.g creek, river, lake-, ,canal) complete table H
                                                                                                -




D        on   strategic port land under the Transport Infrastructure Act 1994 complete table I
                                                                                   -




fZI      in a tidal water area      -

                                        complete table J

Table H           Name of water body, watercourse or aquifer


         11       Canal



                  Name of local government for the tidal area              Port authority f r the tidal area
Table J
                  (if applicable)                                          (If applicable)

         11       Sunshine Coast Regional Council



11. Are there any existing easements on the premises? (e.g.for vehicular access, electricity, overland flow,
      water, etc.)


[8J No DYes           -
                          ensure the type, location and dimension of each easement is included in the      plans submitted

12. Does the proposal include new building work or operational work on the premises? (including any
      services)

D No [8J Yes          -
                          ensure the nature, location and dimensions of   proposed works are included in plans submitted

13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
      end of this form for more information)


fZI No    -
              Go to question 15                       DYes


15. Has the local government agreed to apply a superseded planning scheme to this application under
      section 96 of the Sustainable Planning Act 2009?



fZI    No

DYes provide details below
              -




                                                                                                    Application Details   -
                                                                                                                              IDAS form 1
                                                                                                      Version 1.0 18 December 2009

Page 6

DDD
16. List below all of the forms and supporting information that
                                                                     accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

                                                                                                  Method of lodgement to
                               Description of attachment or title of attachment
                                                                                                    assessment manager


             1     IDAS FORM 28                                                                    mail
                                 "




                                                      ~.
                                            1’(’:.-
            2      ENGINEERED PLANS & CERTIFICATE                                                  mail

                   "       "




                   ,   ,




            3      REGIONAL HARBOUR MASTER REFERRAL RESPONSE                                       mail




117. Applicant’s declaration
 fV’I By making this application, I declare that all information in this application is true and correct (note: it is
 ~ unlawful to
                provide false or misleading information).

 Notes for completing this form


Question 8:
    Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is
                                                                                                              required
    for an application. Section 260(1 }(e)of the Sustainable Planning Act 2009 provides that if the owner’s consent is
    required under section 263, then an application must contain, or be accompanied by, the written consent of the
    owner, or include a declaration by the applicant that the owner has given written consent to the making of the
    application.
    Owner’s consent is not required for a mobile and temporary ERA.


Question 9:
    Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state
                                                                                                             resource, a
    regulation may require the application to be supported by certain evidence prescribed under the regulation.
    Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
    required to be given, and the evidence required, to support the application.

Question 13:
    The Building and Construction Industry (Portable Long SeNice Leave)Act 1991 prescribes when the
                                                                                 ’
                                                                                                        portable
    long service leave levy is payable.
    The portable long service leave levy amount and other prescribed percentages and rates for
                                                                                               calculating the levy
    are prescribed in the Building and Construction Industry (Portable
                                                                       Long SeNice Leave) Regulation 2002.

Question 14:
    The portable long service leave levy need not be paid when the application is made, but the
                                                                                                       Building and
    Construction Industry (Portable Long SeNice Leave)Act 1991 requires the levy to be paid before a
                                                                                                              development
    permit is issued.
    Building and Construction Industry Notification and Payment Forms are available from any Queensland post
    office or agency, on request from QLeave, or can be completed on the QLeave website at
   www.gleave.gld.gov. au. For further information contact QLeave on 1800803481 or www.gleave.gld.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP)in
accordance with the proceSsing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009)or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.




                                                                                            Application Details   -
                                                                                                                      IDAS form 1
                                                                                               Version 1.018 December 2009

Page 7

’UDO’
 OFFICE USE ONLY      ,




 Date received
                 I

To
     I
Date of
                     Name
engagement




QLEAVE NOTIFICATION AND PAYMENT
                                            (for completion by assessment manager or private certifier if applicable)


                                                                                Date receipted
                                        QLeave Project   Amount                 form sighted by Name of officer who
              Description of the work                               Date paid
                                        Number           paid ($)               assessment       sighted the form
                                                                                manager


         11
The Sustainable Planning Act 2009
                                     (SPA)is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be
                                                            sent to your assessment
                                                                                    manager and any referral
agencies.




                                                                                      Application Details   -
                                                                                                                IDAS form 1
                                                                                        Version 1.018 December 2009

Page 8

      f                            I~ g;ated b:~’oP""ent ;s ~s~ent System form
         W..                                                                                                    ~~
      Prescribed tidal work                                             -      IDAS form 28
      (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)


      This form must be completed for development applications for prescribed tidal work.


      You MUST complete ALL questions unless the ’form indicates otherwise. Incomplete forms or forms without all
      necessary information and documentation will result in your application not being a properly made application.


      For all development applications you must:

      .     complete Application details IDAS form 1
                                               -




      .     complete any other forms relevant to your application

            provide any mandatory supporting information identified on the forms as being required to accompany your
            application.

      All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
      Regulation 2009.

      11. What type of approval is sought?
      r8J development permit
      o preliminary approval

      2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)



                                                        Private use      Non-private use   Estimated value of completed works ($)



      0 jetty, pier or wharf                                  D                 D
      0 mooring pile                                          D                 D
      0 deck or boardwalk                                     D                 D
      0 boat ramp or spillway                                 D                 D
      r8J pontoon                                             ~                 D
      0 revetment, sea wall or retaining wall                 D                 D
      0 other please specify below
                  -
                                                              D                 D

      3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of
      the lot are connected to the work and neighbouring lots are not at right angles to the waterway?


      r8J   No           o     Yes


;: 4. Has a
                 registered professional engineer of Queensland’(RPEQ), or an interstate equivalent, certified that the
      works comply with the design and safety provisions of the IDAS code for development applications for

.
      pres ribed tidal works in the Coastal Protection and Manageme t Regulation 2003, schedule 4A? (non-
,.l
      mandatory)

    ’,0     No           r8J   Yes   -
                                         provide details below

Page 9

DDD
 Engineers name/s                            IPaul Calver
Organisation name (if applicable)            ICardno (Old)P/L
Postal address                                Locked Bag 4006, FORTITUDE VALLEY OLD 4006


Contact phone number                         133699822
Fax number (non-mandatory)                   133699722
e-mail address (non-mandatory)

RPEQ number (or equivalent if
interstate)                                  11667
Reference number of all plans to which this certification relates
                                                                             IJSP-SJ-25160B/JSP-SJ-25161A1JSP-SJ-25162B
5. Confirm the following mandatory supporting information accompanies this application


Plans certified by a registered professional engineer of Queensland
                                                                                 Confirmation of             Method of
(RPEQ)(or an interstate or international equivalent registered with
the appropriate professional body) showing:                                         lodgement                lodgement

the location (real property description and boundaries) and dimensions
of the proposed works in relation to the land (including tidal land)that       r8J confirmed          mail
would abut or adjoin the proposed works

the proposed works in relation to the locations and levels of lowest
astronomical tide, highest astronomical tide, mean high water springs          r8J confirmed          mail
and the coastal management district

the slope angles of the beds and banks of the tidal area and the finished
levels of the proposed works                                                   r8J confirmed          mail

Written statements or evidence

a copy of the certificate of title for the land (including tidal
                                                                 land)that
would abut or adjoin the proposed works                                        r8J confirmed          mail


details of how the proposed work addresses the IDAS code for
prescribed tidal work in the Coastal Protection and Management                 r8J confirmed          mail
Regulation 2003, schedule 4A

                                                                              r8J confirmed
details of the largest vessel, if any, to be moored at the structure                                  mail
                                                                               D not applicable
evidence that the proposed work will not prejudice the access rights of
adjoining property owners in the form of:
        .     letters of support from adjoining property owner; or            r8J confirmed           mail


        .     plans illustrating a water allocation area.

For applications within a cul~de-sac, a bend in the waterway or
other location where the side boundaries of the lot connect to the
work and neighbouring lots are not at right angles to the waterway
must also provide:


photos of any constructed neighbouring structures or information about        Dconfirmed
approved but unconstructed neighbouring structures.
                                                                              r8J not applicable

Privacy please refer to your assessment manager for further details on the use of information recorded in
         -




this form.




                                                                                         Prescribed tidal work   -
                                                                                                                     IDAS form 28
                                                                                               Version 1.0 18 December 2009

Page 10

DDD
OFFICE USE ONLY



Date Received   I                               Reference Numbers


The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and
                                                                                              Planning. This form and
all other required application materials should be sent to
                                                              your assessment manager and any referral agencies.




                                          OS
                                            V~.t
                                                   O~
                                                      ~&
                                                cJ7       ’
                                                              ~t
                                                      .




                                                                   C
                                       %~           J(f            O~
                                            00            ~b   <
                                                                       J?~~
                                             C’~
                                                  ~o:.
                                                      Or~




                                                                                      Prescribed tidal work -IDAS form 28
                                                                                           Version 1.018 December 2009

Page 11

                                  PLANS


        PLAN                   TITLE              DATE


JSP-SJ-25160    ISS B   SITE PLAN               10/07/2012

JSP-SJ-25161    ISSA    ELEVATION               28/06/2012

JSP-SJ-25162    ISS B   WATER ALLOCATION PLAN   10/07/2012

JSP-SJ-005   ISS H      STANDARD LAND ANCHOR    12/04/2007

JSP-GW-006     ISS E    CATWALK                 1/10/2007

JSP-SD-102     ISS D    315 PILE BRACKET        6/06/2008

JSP-SD-045   ISSC       CONCRETE INSITU PILE    20/04/2006

JSP-SD-100   ISS B      PONTOON CONSTRUCTION    7/06/2006

Page 12

Queensland Land Titles                                                                             Page 1 of 1



                                  CURRENT        TITLE   SEARCH
                        ENVIRONMENT AND           RESOURCE MANAGEMENT, QUEENSLAND
 Request     No:      14084460
Search Date:          19/06/2012 14:28                                      Title Reference: 19205103




Previous Title: 15810148


REGISTERED OWNER


BODY CORPORATE          FOR JALYNCA COMMUNITY TITLES               SCHEME
10090
 QUEENSLAND BODY CORPORATE MANAGEMENT
 PO BOX      551
 NOOSA    HEADS       QLD 4567


LAND   DESCRIPTION


COMMON      PROPERTY OF JALYNCA           COMMUNITY TITLES SCHEME           10090
COMMUNITY MANAGEMENT             STATEMENT        10090
                   Local Government: SUNSHINE COAST


EASEMENTS, ENCUMBRANCES AND INTERESTS

       1.   Rights and interests             reserved to the Crown          by
            Deed      of Grant No.       15810148        (ALLOT 245 SEC 23)

       2.   REQUEST      FOR NEW       CMS No     704184652       15/07/2000     at   11:55
            New    COMMUNITY MANAGEMENT               STATEMENT    10090
            MODULE: STANDARD


ADMINISTRATIVE ADVICES             -

                                       NIL
UNREGISTERED          DEALINGS     -
                                       NIL




CERTIFICATE OF TITLE             ISSUED      -

                                                 No




Caution     -


                Charges do       not   necessarily        appear   in order of        priority

                                  **                                             **
                                        End of Current       Title   Search


COPYRIGHT       THE    STATE OF QUEENSLAND             (ENVIRONMENT AND RESOURCE MANAGEMENT)       [2012]
Requested By:          D APPLICATIONS        ABR




                                                                                                 Page 1/1




http://www.abr.com.au/live/qldltlformprocess.php                                                    19/06/2012

Page 13

                                                                                          Queensland
                                                                          e                  Government


26 July 2012
                                                                                             Department of
                                                                                             Transport and Main Roads
The Jetty Specialist

2 Industrial Avenue
 Caloundra Qld 4551

                                                                         ~ ~(       ~TI’\J:E’I
 Dear Sir
                                                                        I     ""
                                                                              J u   JUl
                                                                                             "",."
                                                                                             4... :,-
                                                                                                        L

                                                            BY:--------------..-...
 Tidal Works      -
                   Request for comments
                                                        Noosa Parade,Noosa Heads Qld 4567,
 Pontoon    _

                Body Corporate for Jalynca CTS 10090,87
 (Lot 245 BUP#5103).

                                                                       to construct a pontoon at the
                                                                                                            location
 Thank you for your letter 17 July 2012 about your proposal
 mentioned above.

                                                                                                                       the
                                                               has no objection to the proposal provided
 As a concurrence agency, Maritime Safety Queensland
                                              conditions are complied with.
 following navigation and marine safety

                                                             to The Jetty Specialist, Drawing
                                                                                                        No: JSP-SJ-
  1.    The contractor must build the pontoon according
                                                      2012.
         25160, attached to your letter dated 17 July

                                                                                                                       from
                                                          this structure is to come closer than 1.5metres
  2.    No part of the structure or any ship berthed at
                                                                shown on the submitted water allocation plan.
         the side boundaries of the allocated water space as

                                                                                                     The
                                                       and clearly visible to approaching vessels.
  3.    The pontoon all freestanding piles must be lit
                                                                             the safe navigation of other
         contractor must         all lighting so it does not cause a risk to
                           position
         vessels.

                                                                                              above or below
        The applicant or his agent is responsible
                                                    for the removal of any existing structure
  4.

        the waterline, and must contain and remove any
                                                            debris.      pile that needs to be removed must
                                                                        Any

        be totally extracted.

                                                                                                               to open
                                                          the most direct course from this structure
   5.   The ship moored at this pontoon must follow

         waters and a similar direct course
                                              when returning to this pontoon.




                                                          Our ref       215/01633 P14708-MOM P14838-MOM
                                   Roads
Department of Transport and Main
                                                          Your ref
Maritime Safety Queensland
                                                           Enquiries Geoff Prendergast
Marine Operations (Brisbane)
                                                           Telephone +61738603504
MacArthur Avenue East
                                                           Facsimile    +61 738603571
Pinkenba Queensland 4008
                                                           Website      www.msq.qld.gov.au
                                                           Email        [email protected]

Page 14

6.   .
      The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel

         clearance at all stages oftide. The ship must comply with any local restrictions placed on channel

         depths and draft restrictions.

7.    Any ships and equipment you or your agent use must comply with the Transport Operations
       (MarineSafety)Act 1994,the Transport Operations (MarineSafety) Regulation 2004 and the
         Transport Operations (MarinePollution)Act 1995.

8.    Any ships using this structure must comply with the Transport Operations (Marine Safety)Act
         1994 and the Transport Operations (Marine Safety) Regulation 2004.



9.    Any ship moored at this pontoon must not impede the safe navigation of other ships or restrict
         safe access to or from neighbouring structures.


10.      Any ship, dry berth or device (including Air Lifting Pontoons)berthed, moored or attached to the
         pontoon must not exceed the following sizes:


              Wet Berth                                                      Dry Berth
         Length Overall- 6.25     metres                                       N/A

         Beam   -
                           3      metres




11. The contractor must construct the pontoon within two years from the date of approval. If

         construction is not completed, you will need additional or amended comments from the Regional
         Harbour Master.


Maritime Safety Queensland does not need to be further consulted if all of the above conditions are

met.



The above conditions must be included in your application to the assessment manager.



This agency will also forward a copy of this letter to the Assessment Manager.




~Y,O?2p
Captain Richard C Johnson
Regional Harbour Master (Brisbane)




                                                                                                   Page 2 of 2

Page 15

                                                                                              ~r"’)Cardno  Shaping the Future



Our Ref      87900105.008 (417)

                                                                                                           Cardno (Qld)Pty Ltd

Contact      Paul Calver                                   ~cg~TIW~                                        ABN 57 051074992




                                                       llil 2 6 JUL 2012 lliJ                              Level 11
23 July 2012                                                                                               515 St Paul’s Terrace

                                                         BY:--------------------                           Fortitude Valley OLD 4006
                                                                                                           Australia

The Manager
The Jetty Specialist Pty Ltd                                                                               Locked Bag 4006
                                                                                                           Fortitude Valley OLD 4006
2 Industrial Ave
                                                                                                           Australia
CALOUNDRA QLD 4551

                                                                                                           Phone: 61 7 3369 9822
Dear Sir,
                                                                                                           Fax:        61 733699722


Structural Design Advice                                                                                   www.cardno.com.au




Project:                 Proposed Pontoon, Piles & Catwalk
Owner:                   Body Corporate for Jalynca
Address:                 Lot 245 (87)Noosa Parade, Noosa Heads



We, Cardno (Old) Pty Ltd, advise that the proposal to construct the works described above has been
checked by us. When the works are constructed in accordance with the approved drawings and in the
location shown, the proposed works are structurally adequate for the anticipated usage .in this location
and sh uld comply with the design and safety provisions of the Prescribed Tidal Work Code (Schedule
4A of the Coastal Protection and                           Management Regulation 2003), based on the design criteria, and
assumptions listed below.

Basis of Design Advice


                   The works do not impose loads that would significantly affect existing structures.
                   The works do not adversely affect the stability of the bed and banks in the near vicinity of
                   the structure.
             .     Structural design criteria:


Maximum Wave Height                                     600mm wind wave
                                                        600mm boat wake
Wind Classification                                     N3
Max. Current                                            1.0 m/s parallel to face of pontoon
Scour                                                   Reasonable scour effects from flood flows and tidal flows have been
                                                        considered
Debris Load                                             To AS 3962
Impact Loads                                            Minor loads without some damage to structure
                                                                                                   .




Max Vessel Size berthed                                 6.25 metres length (wet)& 3.0 m beam (wet)
Relevant Codes                                          AS 1170, AS 3962 and AS         3600, except where varied         by        the
                                                        Prescribed Tidal Work Code




                                                                                                                                                             i

                                                                                                                               t.   i ~
                                                                                                                                    !~
                                                                                                                                        ’0"’ ’. ’(
                                                                                                                                        ~




                                                                                                                                    ! CERTIFIED QUALITY i
                                                                                                                                                             ,




Australia  Belgium
            .         Indonesia
                        .         Kenya.   New Zealand
                                                  .
                                                          Papua New Guinea
                                                                     .                                                              I
                                                                                                                                        "’AHAClEMEHTS’STEU   I
                                                                                                                                                             I
                                                                                                                                        -IJQ’U’-

United Kingdom   United Arab Emirates
                  .                     United States
                                              .        Operations in 60 countries
                                                                 .                                                                  i

1:lb7900-05IsubOOBI417.body corporate for jalyncalwordl417 design advice.doc
                                                         .
                                                                                                                                    01/10

Page 16

              .
          .
~




    23 July 2012
                                                                                     2
                                                                                                        (.f)CardnCJ  Shaping the Future


                                                                        of the works on site. The Builder shall
    This design advice does not cover the construction or installation
                                                                     and  shall advise the Engineer if variation
    confirm the adequacy of the site conditions during installation
                                                                                  or studies have been carried
    from details shown on the drawings occur. No detailed site investigation
                                                               carried out on  the basis of limited enquiry only.
    out by us or provided to us. The design review has been
                                                                  dense  sand.  There  is some additional risk of
    Pile depths shown are applicable to founding in stiff clay or
                                                                   actual site  conditions  be inferior to those
    failure should the above design criteria be exceeded, or
                                                                              encountered during construction
    assumed. If ground conditions other than those described above are
    or seabed levels encountered are deeper
                                               than those shown on the drawings, further advice should be

    sought.
                                                                                                 but does not warrant them.
    This design advice relies on designs prepared by other consultants,


    The structure is to be built in accordance with the following
                                                                  referenced documentation, using                                good
    building practice.


    Referenced documentation


                  .    Drawing No. JSP-SJ-25160 B
                  .    Drawing No. JSP-SJ-25161 A
                  .    Drawing No. JSP-SJ-25162 B

     Competent Person Details

     Name: Paul Calver BE RPEQ 1667


     Name of firm for and on behalf person is signing:


                  Cardno (Old)pty Ltd
                  Level 11 Green Square Nth Tower
                  515 St Paul’s Terrace
                  Fortitude Valley Old 4006


     Postal address:


                  Locked Bag 4006 Fortitude Valley
                  OLD 4006 Australia


     Phone:(07)3100 2199                                            Fax:         (07)3369 9722

     Reference:                8790005-008 (417)



      ~AJ-~
      Paul Calver (RPEQ 1667)
      Senior Engineer
      forCardno




                                                                                                                                      01/10
      I:lb7900-OSlsubOO81417-body corporate for jalyncalword\417 design advice.doc
                                                               -

Used in these records

About this file

File size
8.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 1 of 2 - Covering letter, IDAS Forms 1 & 28, DTMR Response Letter and Cardno Letter.pdf · 8.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.