Development Application - Part 1 of 2 - Covering letter, IDAS Forms 1 & 28, DTMR Response Letter and Cardno Letter · OPW12/0241
SCRC CORRESPONDENCE
Place Barcode here IJ1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 11 1 1 1 @
80474887
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
Part l ofd -
Application number: Or\}’l /d{(J}4/
C:\Documents and Settings\eje\Desktop\Multi Part Record Cover Sheet NEXT PART
(3).doc
/
.JS/~3 10 I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 15 pages
Page 2
’It, f
SPE~I.LIST
SERVICING THE EAST COAST OF AUSTRALIA AND SOUTH PACIFIC REGIONS
30th July 2012
Sunshine Coast Regional Council
Locked Bag 72
Sunshine Coast Mail Centre Qld 4560
ATIENTION:- DENIS WALLACE /
RE: BODY CORPORATE FOR JALYNCA CTS 10090
LOT 0 (87)NOOSA PDE
NOOSA HEADS QLD 4567
Pursuant to the Sustainable Planning Act 2009,we wish to make application
for Prescribed Tidal Works under the legislation that was adopted on 18
December, 2009.
Please find attached:
1. IDAS Forms 1 and 28
2. Two full sets of plans including constructional details
3. Proof of the land owner
4. Concurrence response from Queensland Transport (Regional Harbour
Master)
5. Required Fee for the application.
We look forward to receiving correspondence from Council within the
designated timeframes pursuant to the Sustainable Planning Act 2009.
npevelopnlent Ccunter
pecialist 2
3 1 JU~ 1
1\ /I,..,
IVlal vv ’,-r’/.....Ch.y-~OI"’O
. I .._, .._,
----
MR STEVE BELT
Applications Officer "
THE MARINA SPECIALIST PTY LTD TRADING AS THE JETIY SPECIALIST
2 Industrial Avenue, Caloundra Queensland 4551 Australia
Telephone 07 5492 5925 Freecall 1300 133155 Facsimile 07 5492 6699
-
ABN 32 010 633119
I.Quality
Endorsed
Web Page -
www.thejettyspecialist.com.au Email [email protected]
Company
ISO 9001:2000
UcNo.OEC14$32
S~AuIlf’"
Page 3
, .’
, ~^.
,’"
"j.>"."",. , I ,I J
11’.11, ’Integrated D~ve 6J~’ ~~’~s~essment System form rf m ~ .
,.+=I-,
I
,
~I"’"M-
!,
Application ’Details -’ID,AS form,t
..
(Sustainable Planning Act 2009 version 1,0 effective 18 December 2009)
_."..
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
. complete this form (Application details IDAS form 1)
-
.
complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
;
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
.;.;
Planning Regulation 2009,
Applicant details (note:the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
t be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Name/s (individual or company name in full) IBOdY Corporate Jalynca
for CTS 10090
For companies, contact name IJulie Daddow (WhittlesAustralia)
C/- The Jetty Specialist, 2 Industrial Av, Caloundra Qld
Postal address
4551
Contact phone number 10754925925
Mobile number (non-mandatory)
Fax number (non-mandatory) 10754926699
e-mail address (non-mandatory)
1. What is the nature of development proposed? (tick all applicable boxes)
’0 material change of use of premises
o building work
.,"’[:8J operational work
o reconfiguring a lot
.
. , ",’",
Department of Infrastructure’and P.I~nning .;;,
’Qp{an’,
,
"
,
",
,,’,
@QUeenSland
Government
Page 4
DDD
12. What type of approval is being sought?
IZI development permit
D preliminary approval
D both -
provide details below
3. Is the application for a mobile and temporary
environmentally relevant activity (ERA)?
IZI No
DYes complete table A and then go to question 5
-
4. Location of the premises (complete table B and/or table C as
applicable. Identify each lot in a separate row)
Table B street address/lot for the premises or street address/lot on plan for the land
-
adjoining or adjacent to the
premises
Lot on plan
Street Address
description
Local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Cairns)
Lot No.
No. No. suburb/locality name code and plan no.
1 87 Noosa Pde, Noosa Heads 4567 0 BUP5103 Sunshine Coast
D Street address /Iot on plan
Street address / lot on plan for the land adjoining or adjacent to the premises
[gIwater (appropriate for development in
e.g. jetty, pontoon) -
Table C -
premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
reference area (If applicable)
Easting Northing Latitude Longitude
D GDA94
DWGS84
1
D other
5. Total area of the premises on which the,development is
proposed (indicate hectares or m2)
27m2
6. Current use/s of the premises (e.g.vacant land, house, apartment
building, cane farm, etc.)
11 1 Multi Residential units
7. ProvidE!’ a brief description of thE! proposal (e.g.six unit apartment
building, 30 lot residential subdivision etc.)
Pontoon system including access gangway and restraint piles
Application Details -
IDAS form 1
Version 1.0 18 December 2009
Page 5
ODD
8. Is owner’s consent required for this application? (refer to notes at the end of this form for more information)
fZI No
DYes complete either table D, table E orla’ble F as applicable
-
9. Does the application involve a state resource? (e.githe application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
fZI No DYes complete table G
-
10. Identify if any of the following apply to the premises (tick applicable boxles)
fZI adjacent to a water body, watercourse or aquifer (e.g creek, river, lake-, ,canal) complete table H
-
D on strategic port land under the Transport Infrastructure Act 1994 complete table I
-
fZI in a tidal water area -
complete table J
Table H Name of water body, watercourse or aquifer
11 Canal
Name of local government for the tidal area Port authority f r the tidal area
Table J
(if applicable) (If applicable)
11 Sunshine Coast Regional Council
11. Are there any existing easements on the premises? (e.g.for vehicular access, electricity, overland flow,
water, etc.)
[8J No DYes -
ensure the type, location and dimension of each easement is included in the plans submitted
12. Does the proposal include new building work or operational work on the premises? (including any
services)
D No [8J Yes -
ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
fZI No -
Go to question 15 DYes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
fZI No
DYes provide details below
-
Application Details -
IDAS form 1
Version 1.0 18 December 2009
Page 6
DDD
16. List below all of the forms and supporting information that
accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
1 IDAS FORM 28 mail
"
~.
1’(’:.-
2 ENGINEERED PLANS & CERTIFICATE mail
" "
, ,
3 REGIONAL HARBOUR MASTER REFERRAL RESPONSE mail
117. Applicant’s declaration
fV’I By making this application, I declare that all information in this application is true and correct (note: it is
~ unlawful to
provide false or misleading information).
Notes for completing this form
Question 8:
Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is
required
for an application. Section 260(1 }(e)of the Sustainable Planning Act 2009 provides that if the owner’s consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
Owner’s consent is not required for a mobile and temporary ERA.
Question 9:
Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state
resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
The Building and Construction Industry (Portable Long SeNice Leave)Act 1991 prescribes when the
’
portable
long service leave levy is payable.
The portable long service leave levy amount and other prescribed percentages and rates for
calculating the levy
are prescribed in the Building and Construction Industry (Portable
Long SeNice Leave) Regulation 2002.
Question 14:
The portable long service leave levy need not be paid when the application is made, but the
Building and
Construction Industry (Portable Long SeNice Leave)Act 1991 requires the levy to be paid before a
development
permit is issued.
Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.gleave.gld.gov. au. For further information contact QLeave on 1800803481 or www.gleave.gld.gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP)in
accordance with the proceSsing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009)or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
Application Details -
IDAS form 1
Version 1.018 December 2009
Page 7
’UDO’
OFFICE USE ONLY ,
Date received
I
To
I
Date of
Name
engagement
QLEAVE NOTIFICATION AND PAYMENT
(for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
11
The Sustainable Planning Act 2009
(SPA)is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be
sent to your assessment
manager and any referral
agencies.
Application Details -
IDAS form 1
Version 1.018 December 2009
Page 8
f I~ g;ated b:~’oP""ent ;s ~s~ent System form
W.. ~~
Prescribed tidal work - IDAS form 28
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for prescribed tidal work.
You MUST complete ALL questions unless the ’form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications you must:
. complete Application details IDAS form 1
-
. complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
11. What type of approval is sought?
r8J development permit
o preliminary approval
2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)
Private use Non-private use Estimated value of completed works ($)
0 jetty, pier or wharf D D
0 mooring pile D D
0 deck or boardwalk D D
0 boat ramp or spillway D D
r8J pontoon ~ D
0 revetment, sea wall or retaining wall D D
0 other please specify below
-
D D
3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of
the lot are connected to the work and neighbouring lots are not at right angles to the waterway?
r8J No o Yes
;: 4. Has a
registered professional engineer of Queensland’(RPEQ), or an interstate equivalent, certified that the
works comply with the design and safety provisions of the IDAS code for development applications for
.
pres ribed tidal works in the Coastal Protection and Manageme t Regulation 2003, schedule 4A? (non-
,.l
mandatory)
’,0 No r8J Yes -
provide details below
Page 9
DDD
Engineers name/s IPaul Calver
Organisation name (if applicable) ICardno (Old)P/L
Postal address Locked Bag 4006, FORTITUDE VALLEY OLD 4006
Contact phone number 133699822
Fax number (non-mandatory) 133699722
e-mail address (non-mandatory)
RPEQ number (or equivalent if
interstate) 11667
Reference number of all plans to which this certification relates
IJSP-SJ-25160B/JSP-SJ-25161A1JSP-SJ-25162B
5. Confirm the following mandatory supporting information accompanies this application
Plans certified by a registered professional engineer of Queensland
Confirmation of Method of
(RPEQ)(or an interstate or international equivalent registered with
the appropriate professional body) showing: lodgement lodgement
the location (real property description and boundaries) and dimensions
of the proposed works in relation to the land (including tidal land)that r8J confirmed mail
would abut or adjoin the proposed works
the proposed works in relation to the locations and levels of lowest
astronomical tide, highest astronomical tide, mean high water springs r8J confirmed mail
and the coastal management district
the slope angles of the beds and banks of the tidal area and the finished
levels of the proposed works r8J confirmed mail
Written statements or evidence
a copy of the certificate of title for the land (including tidal
land)that
would abut or adjoin the proposed works r8J confirmed mail
details of how the proposed work addresses the IDAS code for
prescribed tidal work in the Coastal Protection and Management r8J confirmed mail
Regulation 2003, schedule 4A
r8J confirmed
details of the largest vessel, if any, to be moored at the structure mail
D not applicable
evidence that the proposed work will not prejudice the access rights of
adjoining property owners in the form of:
. letters of support from adjoining property owner; or r8J confirmed mail
. plans illustrating a water allocation area.
For applications within a cul~de-sac, a bend in the waterway or
other location where the side boundaries of the lot connect to the
work and neighbouring lots are not at right angles to the waterway
must also provide:
photos of any constructed neighbouring structures or information about Dconfirmed
approved but unconstructed neighbouring structures.
r8J not applicable
Privacy please refer to your assessment manager for further details on the use of information recorded in
-
this form.
Prescribed tidal work -
IDAS form 28
Version 1.0 18 December 2009
Page 10
DDD
OFFICE USE ONLY
Date Received I Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and
Planning. This form and
all other required application materials should be sent to
your assessment manager and any referral agencies.
OS
V~.t
O~
~&
cJ7 ’
~t
.
C
%~ J(f O~
00 ~b <
J?~~
C’~
~o:.
Or~
Prescribed tidal work -IDAS form 28
Version 1.018 December 2009
Page 11
PLANS
PLAN TITLE DATE
JSP-SJ-25160 ISS B SITE PLAN 10/07/2012
JSP-SJ-25161 ISSA ELEVATION 28/06/2012
JSP-SJ-25162 ISS B WATER ALLOCATION PLAN 10/07/2012
JSP-SJ-005 ISS H STANDARD LAND ANCHOR 12/04/2007
JSP-GW-006 ISS E CATWALK 1/10/2007
JSP-SD-102 ISS D 315 PILE BRACKET 6/06/2008
JSP-SD-045 ISSC CONCRETE INSITU PILE 20/04/2006
JSP-SD-100 ISS B PONTOON CONSTRUCTION 7/06/2006
Page 12
Queensland Land Titles Page 1 of 1
CURRENT TITLE SEARCH
ENVIRONMENT AND RESOURCE MANAGEMENT, QUEENSLAND
Request No: 14084460
Search Date: 19/06/2012 14:28 Title Reference: 19205103
Previous Title: 15810148
REGISTERED OWNER
BODY CORPORATE FOR JALYNCA COMMUNITY TITLES SCHEME
10090
QUEENSLAND BODY CORPORATE MANAGEMENT
PO BOX 551
NOOSA HEADS QLD 4567
LAND DESCRIPTION
COMMON PROPERTY OF JALYNCA COMMUNITY TITLES SCHEME 10090
COMMUNITY MANAGEMENT STATEMENT 10090
Local Government: SUNSHINE COAST
EASEMENTS, ENCUMBRANCES AND INTERESTS
1. Rights and interests reserved to the Crown by
Deed of Grant No. 15810148 (ALLOT 245 SEC 23)
2. REQUEST FOR NEW CMS No 704184652 15/07/2000 at 11:55
New COMMUNITY MANAGEMENT STATEMENT 10090
MODULE: STANDARD
ADMINISTRATIVE ADVICES -
NIL
UNREGISTERED DEALINGS -
NIL
CERTIFICATE OF TITLE ISSUED -
No
Caution -
Charges do not necessarily appear in order of priority
** **
End of Current Title Search
COPYRIGHT THE STATE OF QUEENSLAND (ENVIRONMENT AND RESOURCE MANAGEMENT) [2012]
Requested By: D APPLICATIONS ABR
Page 1/1
http://www.abr.com.au/live/qldltlformprocess.php 19/06/2012
Page 13
Queensland
e Government
26 July 2012
Department of
Transport and Main Roads
The Jetty Specialist
2 Industrial Avenue
Caloundra Qld 4551
~ ~( ~TI’\J:E’I
Dear Sir
I ""
J u JUl
"",."
4... :,-
L
BY:--------------..-...
Tidal Works -
Request for comments
Noosa Parade,Noosa Heads Qld 4567,
Pontoon _
Body Corporate for Jalynca CTS 10090,87
(Lot 245 BUP#5103).
to construct a pontoon at the
location
Thank you for your letter 17 July 2012 about your proposal
mentioned above.
the
has no objection to the proposal provided
As a concurrence agency, Maritime Safety Queensland
conditions are complied with.
following navigation and marine safety
to The Jetty Specialist, Drawing
No: JSP-SJ-
1. The contractor must build the pontoon according
2012.
25160, attached to your letter dated 17 July
from
this structure is to come closer than 1.5metres
2. No part of the structure or any ship berthed at
shown on the submitted water allocation plan.
the side boundaries of the allocated water space as
The
and clearly visible to approaching vessels.
3. The pontoon all freestanding piles must be lit
the safe navigation of other
contractor must all lighting so it does not cause a risk to
position
vessels.
above or below
The applicant or his agent is responsible
for the removal of any existing structure
4.
the waterline, and must contain and remove any
debris. pile that needs to be removed must
Any
be totally extracted.
to open
the most direct course from this structure
5. The ship moored at this pontoon must follow
waters and a similar direct course
when returning to this pontoon.
Our ref 215/01633 P14708-MOM P14838-MOM
Roads
Department of Transport and Main
Your ref
Maritime Safety Queensland
Enquiries Geoff Prendergast
Marine Operations (Brisbane)
Telephone +61738603504
MacArthur Avenue East
Facsimile +61 738603571
Pinkenba Queensland 4008
Website www.msq.qld.gov.au
Email [email protected]
Page 14
6. .
The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
clearance at all stages oftide. The ship must comply with any local restrictions placed on channel
depths and draft restrictions.
7. Any ships and equipment you or your agent use must comply with the Transport Operations
(MarineSafety)Act 1994,the Transport Operations (MarineSafety) Regulation 2004 and the
Transport Operations (MarinePollution)Act 1995.
8. Any ships using this structure must comply with the Transport Operations (Marine Safety)Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.
9. Any ship moored at this pontoon must not impede the safe navigation of other ships or restrict
safe access to or from neighbouring structures.
10. Any ship, dry berth or device (including Air Lifting Pontoons)berthed, moored or attached to the
pontoon must not exceed the following sizes:
Wet Berth Dry Berth
Length Overall- 6.25 metres N/A
Beam -
3 metres
11. The contractor must construct the pontoon within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.
The above conditions must be included in your application to the assessment manager.
This agency will also forward a copy of this letter to the Assessment Manager.
~Y,O?2p
Captain Richard C Johnson
Regional Harbour Master (Brisbane)
Page 2 of 2
Page 15
~r"’)Cardno Shaping the Future
Our Ref 87900105.008 (417)
Cardno (Qld)Pty Ltd
Contact Paul Calver ~cg~TIW~ ABN 57 051074992
llil 2 6 JUL 2012 lliJ Level 11
23 July 2012 515 St Paul’s Terrace
BY:-------------------- Fortitude Valley OLD 4006
Australia
The Manager
The Jetty Specialist Pty Ltd Locked Bag 4006
Fortitude Valley OLD 4006
2 Industrial Ave
Australia
CALOUNDRA QLD 4551
Phone: 61 7 3369 9822
Dear Sir,
Fax: 61 733699722
Structural Design Advice www.cardno.com.au
Project: Proposed Pontoon, Piles & Catwalk
Owner: Body Corporate for Jalynca
Address: Lot 245 (87)Noosa Parade, Noosa Heads
We, Cardno (Old) Pty Ltd, advise that the proposal to construct the works described above has been
checked by us. When the works are constructed in accordance with the approved drawings and in the
location shown, the proposed works are structurally adequate for the anticipated usage .in this location
and sh uld comply with the design and safety provisions of the Prescribed Tidal Work Code (Schedule
4A of the Coastal Protection and Management Regulation 2003), based on the design criteria, and
assumptions listed below.
Basis of Design Advice
The works do not impose loads that would significantly affect existing structures.
The works do not adversely affect the stability of the bed and banks in the near vicinity of
the structure.
. Structural design criteria:
Maximum Wave Height 600mm wind wave
600mm boat wake
Wind Classification N3
Max. Current 1.0 m/s parallel to face of pontoon
Scour Reasonable scour effects from flood flows and tidal flows have been
considered
Debris Load To AS 3962
Impact Loads Minor loads without some damage to structure
.
Max Vessel Size berthed 6.25 metres length (wet)& 3.0 m beam (wet)
Relevant Codes AS 1170, AS 3962 and AS 3600, except where varied by the
Prescribed Tidal Work Code
i
t. i ~
!~
’0"’ ’. ’(
~
! CERTIFIED QUALITY i
,
Australia Belgium
. Indonesia
. Kenya. New Zealand
.
Papua New Guinea
. I
"’AHAClEMEHTS’STEU I
I
-IJQ’U’-
United Kingdom United Arab Emirates
. United States
. Operations in 60 countries
. i
1:lb7900-05IsubOOBI417.body corporate for jalyncalwordl417 design advice.doc
.
01/10
Page 16
.
.
~
23 July 2012
2
(.f)CardnCJ Shaping the Future
of the works on site. The Builder shall
This design advice does not cover the construction or installation
and shall advise the Engineer if variation
confirm the adequacy of the site conditions during installation
or studies have been carried
from details shown on the drawings occur. No detailed site investigation
carried out on the basis of limited enquiry only.
out by us or provided to us. The design review has been
dense sand. There is some additional risk of
Pile depths shown are applicable to founding in stiff clay or
actual site conditions be inferior to those
failure should the above design criteria be exceeded, or
encountered during construction
assumed. If ground conditions other than those described above are
or seabed levels encountered are deeper
than those shown on the drawings, further advice should be
sought.
but does not warrant them.
This design advice relies on designs prepared by other consultants,
The structure is to be built in accordance with the following
referenced documentation, using good
building practice.
Referenced documentation
. Drawing No. JSP-SJ-25160 B
. Drawing No. JSP-SJ-25161 A
. Drawing No. JSP-SJ-25162 B
Competent Person Details
Name: Paul Calver BE RPEQ 1667
Name of firm for and on behalf person is signing:
Cardno (Old)pty Ltd
Level 11 Green Square Nth Tower
515 St Paul’s Terrace
Fortitude Valley Old 4006
Postal address:
Locked Bag 4006 Fortitude Valley
OLD 4006 Australia
Phone:(07)3100 2199 Fax: (07)3369 9722
Reference: 8790005-008 (417)
~AJ-~
Paul Calver (RPEQ 1667)
Senior Engineer
forCardno
01/10
I:lb7900-OSlsubOO81417-body corporate for jalyncalword\417 design advice.doc
-
Used in these records
Development Application - Part 1 of 2 - Covering letter, IDAS Forms 1 & 28, DTMR Response Letter and Cardno LetterRelated documentApplication case desk ↗
About this file
- File size
- 8.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.