Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Development Application - Part 1 of 2 - Covering letter, IDAS Forms 1 & 28, DTMR Response Letter and Cardno Letter · OPW12/0241

of 16

Text shows just the words. Original shows the document exactly as it was published.

      f                            I~ g;ated b:~’oP""ent ;s ~s~ent System form
         W..                                                                                                    ~~
      Prescribed tidal work                                             -      IDAS form 28
      (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)


      This form must be completed for development applications for prescribed tidal work.


      You MUST complete ALL questions unless the ’form indicates otherwise. Incomplete forms or forms without all
      necessary information and documentation will result in your application not being a properly made application.


      For all development applications you must:

      .     complete Application details IDAS form 1
                                               -




      .     complete any other forms relevant to your application

            provide any mandatory supporting information identified on the forms as being required to accompany your
            application.

      All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
      Regulation 2009.

      11. What type of approval is sought?
      r8J development permit
      o preliminary approval

      2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)



                                                        Private use      Non-private use   Estimated value of completed works ($)



      0 jetty, pier or wharf                                  D                 D
      0 mooring pile                                          D                 D
      0 deck or boardwalk                                     D                 D
      0 boat ramp or spillway                                 D                 D
      r8J pontoon                                             ~                 D
      0 revetment, sea wall or retaining wall                 D                 D
      0 other please specify below
                  -
                                                              D                 D

      3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of
      the lot are connected to the work and neighbouring lots are not at right angles to the waterway?


      r8J   No           o     Yes


;: 4. Has a
                 registered professional engineer of Queensland’(RPEQ), or an interstate equivalent, certified that the
      works comply with the design and safety provisions of the IDAS code for development applications for

.
      pres ribed tidal works in the Coastal Protection and Manageme t Regulation 2003, schedule 4A? (non-
,.l
      mandatory)

    ’,0     No           r8J   Yes   -
                                         provide details below

Used in these records

About this file

File size
8.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 1 of 2 - Covering letter, IDAS Forms 1 & 28, DTMR Response Letter and Cardno Letter.pdf · 8.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.