Detailed engineering design of the work will be required, before commencing
construction. An RPEQ Engineer experienced in bridge design can design/specify the
columns, new deck joints, deck waterproofing and even protective coatings. The
impressed-current cathodic-protection system will need to be designed by a specialist
engineer: it is common for these to be designed and constructed by specialist contractors
with their own engineers, such as Freyssinet and Savcor.
Construction work should be carried out by a specialist contractor, or by an experienced
bridge contractor with a specialist subcontractor. Conventional building or civil
contractors are not suitable for this type of work.
Page 10 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.