2015-03-31 I&S Committee - Item 5 - Attachment 1 - Munna Pt Bridge Repairs Level 3 Bridge Report

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Detailed engineering design of the work will be required, before commencing
construction. An RPEQ Engineer experienced in bridge design can design/specify the
columns, new deck joints, deck waterproofing and even protective coatings. The
impressed-current cathodic-protection system will need to be designed by a specialist
engineer: it is common for these to be designed and constructed by specialist contractors
with their own engineers, such as Freyssinet and Savcor.

Construction work should be carried out by a specialist contractor, or by an experienced
bridge contractor with a specialist subcontractor. Conventional building or civil
contractors are not suitable for this type of work.




                                      Page 10 of 31
Log in to download the original file

2015-03-31 I&S Committee - Item 5 - Attachment 1 - Munna Pt Bridge Repairs Level 3 Bridge Report(PDF, 7MB).pdf · 7.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.