                                                                                          15099 - SBSMP/2
                                                                                                     Page 18




6.2.2 Proposed Treatment Train
Given the current review being undertaken within Noosa Council regarding the acceptance of
various stormwater quality treatment technologies, two separate options have been provided
for stormwater quality treatment for the proposed development. The provision of two separate
options at this conceptual stage ensures that the development can be provided with a
stormwater quality treatment system that meets Council’s future requirements whilst
optimising broader development outcomes.
Option 1
The proposed treatment train has been modelled using the following methodology:
    1. Roofwater runoff is captured and directed to the proposed underground on-site
       detention system. Outflow from the detention system is directed to a proposed
       bioretention basin (Bio-retention Basin 1) to be located at the basement level within the
       south-western portion of the site.
    2. Surface runoff within the upper level car parking and access area will sheet flow into
       two proposed bio-retention basins to be located along the eastern boundary of the site.
    3. Surface runoff from the exposed ramp and basement level areas along the western site
       boundary will be collected by various pits containing litter baskets. Additionally, a small
       swale along the southern site boundary is proposed to capture minor quantities of runoff
       from the southern portion of the site and convey the flows into Bio-retention Basin 1

Refer to Table 6.4 for details of the treatment train assets.

                                      Table 6.4 - Proposed Treatment Assets

            Treatment         Treatment
                                                                    Description
              Level             Asset

             Primary/                               3m wide grassed swale along southern site
                            Grassed Swale
            Secondary                               boundary.
                                                    5 x Enviropod 200 Series Litter Baskets within
             Primary        Litter Baskets
                                                       the gully pits on the basement level.
                                                Bio-retention Basin 1
                                                    - 70m2 Filter Media Area.
                                                    - 400mm depth of filter media;
                                                    - 200mm extended detention depth

                                                Bio-retention Basin 2
           Secondary/       Bio-Retention           - 20m2 Filter Media Area
            Tertiary            Basins              - 400mm depth of filter media;
                                                    - 200mm extended detention depth

                                                Bio-retention Basin 3
                                                    - 20m2 Filter Media Area
                                                    - 400mm depth of filter media;
                                                    - 200mm extended detention depth




Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville

Used in these records

About this file

File size
7.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan.pdf · 7.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.