Stormwater Management Plan · MCU15/0122
Attached to the e-mail MCU15/0122 Development Application - Stormwater Management Plan Email 3 of 5..
Plans and drawings: the text below has words only, no drawings.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
15099 - SBSMP/2
Page 2
Table of Contents
1 INTRODUCTION .......................................................................................... 3
2 Existing site conditions ................................................................................. 4
2.1 The Site ............................................................................................. 4
2.2 Surrounding Area ................................................................................... 4
3 PROPOSED DEVELOPMENT .............................................................................. 5
4 EXISTING STORMWATER DRAINAGE SYSTEM .......................................................... 6
4.1 Existing Infrastructure ............................................................................ 6
4.2 Existing Drainage Patterns ........................................................................ 7
4.3 Legal Point of Discharge .......................................................................... 7
5 STORMWATER QUANTITY ............................................................................... 8
5.1 Design Storms....................................................................................... 8
5.2 Rainfall Intensity ................................................................................... 8
5.3 Times of Concentration ........................................................................... 8
5.4 Runoff Coefficients ................................................................................ 8
5.5 Peak Flows .......................................................................................... 9
5.6 On-Site Detention Analysis ....................................................................... 9
5.7 Comparison of Peak Flows at the Legal Point of Discharge ................................. 14
6 STORMWATER QUALITY ................................................................................ 15
6.1 Construction Phase ............................................................................... 15
6.2 Operational Phase ................................................................................ 17
7 FLOODING ............................................................................................... 23
8 CONCLUSION ............................................................................................ 24
Appendix A DETAILED SITE SURVEY ....................................................................... 25
Appendix B PROPOSED DEVELOPMENT PLANS ............................................................ 26
Appendix C CONCEPT DRAINAGE PLANS .................................................................. 27
Appendix D XP-RAFTS PRE-DEVELOPMENT HYDROGRAPHS ............................................. 28
Appendix E XP-RAFTS POST-DEVELOPMENT MITIGATED HYDROGRAPHS.............................. 29
Appendix F RATIONAL METHOD CALCULATIONS ......................................................... 30
Appendix G NOOSAVILLE FLOOD OVERLAY MAPPING .................................................... 31
Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.