Town Planning Report · MCU23/0078
parking where the reporting demonstrates compliance with PO1 from Council’s All bin storage areas have been positioned away from key thoroughfares and
Driveway and Parking Code as follows: public open space areas and are to be screened where appropriate to preserve
The assessment demonstrates that the plausible peak hour demand for the amenity.
proposed development is 913 spaces when considering the parking demand Swept path assessments provided in the Traffic Impact Statement (Appendix E)
profiles for the differing tenancies types within the development; have demonstrated that all service vehicles are able to access the proposed
Visitors to the site are likely to visit multiple land uses during their trip, and servicing areas and loading facilities with suitable clearances.
residential tenants who live within the precinct will likely visit the shopping
BICYCLE PARKING AND END OF TRIP FACILITIES
centre by foot; and
Council’s strategic intent for transport aims to encourage active and public The development proposes to incorporate 110 bicycle spaces and significant
transport moved, where a relaxation in car parking supply will help promote purpose-built end of trip facilities (including showers and lockers) which will be
such a mode shift. located in the southern end of Lot 3. These facilities will be accessed both
Please refer to the enclosed Traffic Impact Statement prepared by SLR internally to the retail and via the Main Street.
Consulting – Appendix E for more details.
3.2.6. STORMWATER MANAGEMENT
REFUSE STORAGE & COLLECTION
A site based Stormwater Management plan has been prepared in support of
The proposed development incorporates waste storage areas at ground level
the proposal which demonstrates that the proposed development can be
adjacent to 3 of the four vehicular entrances to the site and internal service bays
developed in accordance with Engineering Best Management Practice, Noosa
as follows:
Shire Council guidelines, QUDM 2017 and the State Planning Policy 2017.
Bin Storage at the rear of the Supermarket serviced by the adjacent
designated servicing area at the southern end of Lot 3; The proposed development achieves seeks to achieve new stormwater
Bin Storage near the northern carpark entrance to Lot 3; connections to the existing stormwater piped network located along the
Bin Storage areas near the sercie bays below the cinema tenancy in Lot 3; private access roadway (Main Street) and the adjoining environmental zone
and and natural drainage channel.
Bin Storage area near the northern entrance to Lot 7;
Planning Report Page | 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Report.pdfRelated documentApplication case desk ↗