6. KEY PLANNING CONSIDERATIONS
This section aims to rationalise the proposed development against integral The level of assessment requirement for centre uses (impact) and highly
planning outcomes and demonstrate how key aspects of the development prescriptive Performance Outcomes (including maximum GFA that does not
contribute to a desirable and effective planning outcome. reflect a Major Activity Centre, or Council’s own economic needs assessment)
are key areas that should be reviewed in accordance with the Ministerial
6.1.1. OTHER MATTERS Condition to meet the economic needs of the Noosa local government area and
The Minister approved the Noosa Plan 2020 on 18 February 2020 subject to the vision of a major regional activity centre in the SEQ Regional Plan.
several ministerial conditions including a specific condition on the Noosa
Extensive engagement has been undertaken with Noosa Council to ensure
Business Centre (NBC) as was outlined in Section 4.2 of this report.
Stockwell's development intent for the Noosa Business Centre reflects and
Commence a process to review the provisions of the Noosa Within twelve months delivers on Council’s aspirations for the Major centre, including among other
Business Centre to provide more detailed planning guidance from the date of
things:
and outcomes sought for the Noosa Business Centre adoption of the
reflective of its role as a Major Centre for Noosa. This proposed planning A village mixed-use precinct with an integrated approach to housing,
process should include a review of the levels of assessment scheme. commercial, retail and entertainment, public space, high street, and
and regulation that will inform an amendment to the
planning scheme to integrate the outcomes of this process. linkages/connection to the existing Noosa Civic centre.
Enhancement of the existing Noosa Civic Centre including covered
The Noosa Plan 2020 was adopted by Council on 17 September 2020. It is noted
walkways and enhanced landscaping.
that Noosa Shire Council did not commence the review process within the 12-
month timeframe as per the ministerial condition. 6.1.2. REGIONAL PLAN
However, in the absence fulfilling the condition to better reflect NBC’s role as a Element 3 of the Shaping SEQ: Regional Plan (see Figure 9) relates to regional
Major Activity Centre under Shaping SEQ Regional Plan and as a major centre for activity centres network, including strategies set out below. The strategy support
Noosa, this development application is required to be assessed against the designated regional activity centres as locations to encourage a wider range of
relevant provisions of the Noosa Plan 2020. economic uses by leveraging existing assets and infrastructure. These centres
should also make provision for residential development.
Planning Report Page | 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.