Council archive · source document
Town Planning Report · MCU23/0078
2. SITE ANALYSIS Vegetation
While the edges of the site are cleared adjacent to
roadways and boundaries, the majority of the sites
contain existing vegetation.
2.1. SITE LOCATION & CHARACTERISTICS Waterways / waterbodies No waterways or waterbodies are located on site.
The site is located at 69 Hofmann Drive, 46 Walter Hay Drive and 28 Eenie Creek Each of the lots within the subject site are included on
the Environmental Management Register as a result of
Road, Noosaville, formally described as Lot 1, Lot 3 and Lot 7 on SP322201. Contaminated land the parent parcel (Lot 2 on SP182880) being subject
Notifiable Activity associated with a Service Stations.
The site is comprised of recently created lots within the Noosa Business Centre,
including the existing Noosa Civic Shopping Centre and land to the southeast.
Table C: Site services
The site has frontage to Hofmann Drive to the south and easements connecting
The Unity Water As-Constructed Plans of the surrounding
to Walter Hay Drive to the northeast which will provide safe and legible road and area indicate existing 150mm and 180mm diameter water
pedestrian access to this development site. Water Supply mains through and adjacent to the site. Please refer to
further details in Appendix C – Civil Engineering Site
Table B below further characterises the physical features of the site and Table C Serviceability Report.
The Unity Water As-Constructed Plans of the surrounding
provides an overview of infrastructure servicing the site.
area indicate existing 225mm diameter sewer mains along
Sewerage the southern boundary of the site with associated property
Table B: Site characteristics connections. Please refer to further details in Appendix C
– Civil Engineering Site Serviceability Report.
Numerous existing easements are established over the
land subject to the development, with the below The detailed survey and examination of as-constructed
relevant easements situated in or adjacent to the areas documentation confirms that existing stormwater mains
Easements being developed within each lot: Stormwater and associated and gully pits are established throughout
Lot 1 – Easements AM, AF, CC, ED, WF on SP322201 the site. Please refer to further details in Appendix C – Civil
Engineering Site Serviceability Report
Lot 3 – Easements AK, AL, CB, CD, EB, SB & WB on
SP322201 Energex Asset Plans confirm that underground electrical
infrastructure exists along the internal private access
Noosa Shire Council contour mapping confirms the Electricity, Gas & roadway. Please refer to further details in Appendix C –
subject site has a maximum elevations of approximately Telecommunications Civil Engineering Site Serviceability Report. There is no gas
Topography 10m RL near the eastern boundary and approximately
infrastructure in the vicinity of the development.
5m RL near the southwestern corner, representing a
gradual slope from east to west.
Planning Report Page | 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.