Original source · versioned page text
2021-06-17 OM Agenda - Item 2 - Attachment 1 - Draft Noosa Bushland Reserve Strategic Management Plan 2021-2026
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnRef# Plan Actions Strategic Responsibilities Additional resources Status
Link required
investment.
1.9 Investigate and identify reserves to be used as receiving sites to NBCP Council As part of staff duties Not
offset Council tree removal and habitat breeding area disturbance. KCP Commenced
2.0 Current reserve signage is audited. Interpretive, educational and Signage Council As part of a New Initiative Not
advisory sign project developed. A signage theme is developed Policy Commenced
that reflects Noosa Council’s brand and ethos.
2.1 NSC proactively undertakes community awareness raising via ES Council, Community Grant funding to community Not
developing an informative website, brochures, factsheets and Groups groups to deliver an Commenced
guided walks. In particular regarding: extension service.
Invasive weeds and appropriate removal techniques; As per staff duties and
Flora and fauna values of the reserve network; volunteer contributions,
Specific reserve asset information.
2.2 Conduct regular arborist inspections as part of a Hazardous Tree NC Tree Council As part of staff duties Underway
Management program at key sites where property or life risk Management
exists. Maintain a register that records location, species, and tree on Public Land
condition at each inspection. Policy 2018
2.3 Protect Non-Aboriginal and Aboriginal heritage objects and places Cultural Council ongoing Not
from activities within bushland reserves, including assessing in Heritage Duty Commenced
association with Historians (Non-Aboriginal Heritage) and of Care.
Traditional Custodians (Kabi Kabi Traditional owners) ES
2.4 Refine the current vegetation (Regional Ecosystem) mapping ES Council As part of staff duties Not
within the reserve network and forward this information to Qld Commenced
Herbarium
ES – Noosa Shire Council Environment Strategy
KCP – Koala Conservation Plan 2016
BP – Noosa Local Government Area Biosecurity Plan 2019
FMP – Noosa Shire Fire Management Plan 2014/15
CCAP – Climate Change Adaptation Plan
BLCG - Bushland Care Group Guidelines
Noosa Bushland Reserves Strategic Management Plan 2021 – 2026 Page 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.