A6769-24-D08 [B] Rapid Infiltration Device Site Layout - & Catchment Plan · OPW25/0042.02
Plans and drawings: the text below has words only, no drawings.
BIO BASIN
~~s—
~
A I
7 of /
Y :
y a /
( ©
/ / |
s RIP 2 Te = “eG
/ 1x 1800dia CATO 4 CA TO 1.-. CATO -/RIP 3A
/ 2400 DEEP ROOF TO HE = pe Oy,
| 2 1 RIP 4B | RIP 4A - RIP 4 % (2x 1800dia
' WITH 6m2 RIP 2 q l = I 32400 DEEP
| {BIO BASIN |_| 622m4 - \\ = 1427? 1
| UY Lie aye po ge £4
: ee 5 = 2 8 _ dA
i +e 7 § = S —
l 3 — 8 COs oe Se
\ : 4 —
| ; ‘So RIP 4B is_e_|s ip lee IR RIP 3B
| \ i , RiP 4 y
HY 1x 180d g i
\A ( N AF 2400 DEEP 1x 1800dia 2x 1800dia
VA . ; 2400 DEEP
(A abe bs eee
~ Feet bs Reh 2 Sy
AX a \Yy
L * [S. STS STS, i\
‘ aI :
7 je n y
CWE as oO Lhe
M “SS PAIN S
\ APPROXIMATE LOCATION OF \ .
PROTOTYPE RAPIC <
XU INFILTRATION CULVERT TESTS =
( . (4TH DECEMBER 2024)
\.
\ Sy S E
——s —
_— RIC 4
—_— 14x 1500w x 1200h x 2400 fT) x
a LONG RCBC CULVERTS [7-RIP 5 \
—_ _— j',’ Ax 1800dia
— ‘| 2400 DEEP
— q WITH 6m2
RIP 6
1x 1800dia +
2400 DEEP
WITH 6m2
BIO BASIN
) 10 20 30 40 50 Meters
SCALE 1:500 (A1), 1:1000 (A3)
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION’ AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. | Design: PBL Brah 101 pty itd ta Alta Project PROJECT: DRAWING TITLE:
Drawn: PBL ABN. 91 my se PROPOSED HOTEL RAPID INFILTRATION DEVICE SITE LAYOUT
Date: AUG 2022 26 Memorial Avenue, Cotton Tree & CATCHMENT PLAN
PO Box 559, Cotton Tree, QLD, 4558 Revision neat
Checked _afl4 Tel (07) 5475 4125 Fax (07) 8479 1607) at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWING No: 46769-24-D08 B 8 of
jecked: |= : Email: [email protected] a ; - ; ;
ENGINEERING : DESIGN : MANAGEMENT 9 © This plan js Copyright, Other than for the purposes of and subject to the conditions preserited ander the
8 | zaora0es | Revise STORMWATER ALIGNMENT pa | sc Web: http://www.alta.net au oprright det, no port of Ht ay in any form or by any means (clecnonk, mechanical, mlezo copying, photo~
$ [pms scum as sidecren pai Daun an if for CALILE MALOUF INVESTMENTS Coe ee en a Te,
REV | DATE DESCRIPTION py | CHKD RPEQ- 4784 ‘Al SHEET SIZE FILENAME | 26768-24-D06 RAPID INFILTRATION SITE LAYOUT dg - DATE: 28'126-50tpm - XREF'S:XASE, X-SURVEY, XARCH 3 ground, XSURVEY claned tees, RCH 2 lower ground; XARCH | basement; XARCH 4 level; XSTRUCT; H-Agpoved SH; H-Chacked SH Council Ref: Tedrected te ALTA Projrta occ AU ieiectoal property remains within AUT Project. lt enquties should
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
A6769-24-D08 [B] RAPID INFILTRATION DEVICE SITE LAYOUT - & CATCHMENT PLAN.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.