Council archive · source document
08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published] · 142008.1041
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
SEQ REGIONAL PLAN
2.114 | Is any part of the premises within the South East Queensland (SEQ) Regional Plan area?
LINo -Gotaeie (] Yes
If yes. are the premises within one or more of the following areas?
¢ AMajor Development Area in the Urban Footprint CI No [2] Yes - (answer (a1 10 (c} below)
* The Regional Landscape and Rural Production Area CI No [1] Yes - (Answer (a) below)
¢ The Rural Living Area CINo 1 Yes - (answer (e) below)
« The Investigation Area CI No (2) Yes - (answer (fi and (g) betow)
For the part of the premises within the Major Development Area (Questions (a) ~ (c))
(a) Does the application involve intensive animal husbandry as defined under the SEQ Regional Plan Regulatory Provisions?
No oO Yes ~ The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this
checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 ta be answered also). This application must be
referred to the Department of infrastructure and Planning (DIP) as Concurrence Agency.
(b) Does the application involve residential development involving a rural residential purpose as defined under the SEQ
Regional Plan Regulatory Provisions?
(C1 No (1 Yes ~ The SEQ Regional Plan makes this use assessable under the planning schema. (Ensure Questions 2.1 in this
checklist is answered yes’. This requires Questions 2.1.1 ~ 2.1.13 fo be answered also), This application must be
referred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.
: {c) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?
CI No -éndot(ay- (©) Yes
If yes, are the premises included in a structure plan as defined under the SEQ Regional Plan Regulatory Provisions?
(Yes
If yes, does the IPA, section 3.1.6 apply to the application?
oO No - End of (c} oO Yes - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure
Questions 2.1 in this checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be
answered also). This application must be referred to the Cepartment of infrastructure and
Planning (DIP) as Concurrence Agency.
CO No
Ifo, does the following apply? ae
(i). Impact assessment i is required under the planning scheme _TINo (C1 Yes
oo cate eee ane eee, {:
iC] No iC Yes
! __— {Ne | Yes
v) The gross floor area, as defined under the SEQ Regional Plan Regulatory Lino iC] Yes;
Provisions, on the premises wil
{f yes to any one of (i) - (iv) above - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure
Questions 2.1 in this checklist is answered yes’. This requires Questions 2.1.1 ~ 2.1.13 to
be answered also). This application must be referred to the Department of Infrastructure
! and Planning (DIP) as Concurrence Agency.
For the part of the premises within the Regional Landscape and Rural Production (RLAP) Area (Question (a)
{d) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?
: Yes
If yes. is every urban activity in the application excluded from being assessable for the purposes of the SEQ Regional
Plan in the RLRP Area?
(1 Yes - End of (a) (ZI No - The SEG Regional Plan makes this use assessable under the planning scheme. (Ensure Question 2.1
in this checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also). This application
must be referred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.
[No
If no, does the application involve residential development involving a rural residential purpose as defined under
the SEQ Regional Plan Regulatory Provisions?
LINo - End of (a) LJ] Yes
If yes, are the premises located in the Mt Lindesay/North Beaudesert Study area?
Cj No - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Question 2.1 in this checklist is answered
yes’. This requires Questions 2.1.1 — 2.1.13 to be answered also). This application must be referred to the Department of
Infrastructure and Planning (DIP) as Concurrence Agency.
(E] Yes - Go to ine first question on the next page of this Checklist
Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file