INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS}?

2.11B | is any part of the premises within a designated region under Schedule 1 of the draft regulatory provisions?
(CINo-Gowaz12 (Yes

If yes, are the premises within one or more of the following areas?

 

* Amaster planned area in the Urban Footprint [No [] Yes - (answer (a) to (c) below)
«The Regional Landscape and Rural Production Area. = No] Yes - cAnswer (a) betowy

¢ The Rural Living Area [No (1 Yes - Answer (e) below)

© The Investigation Area CINo CO) Yes - Answer (f and (9) pet)

For the part of the premises within a master planned area (Questions (a) - {c})

: (a) Does the application involve an activity as defined under section 2.2(1) of the draft regulatory provisions?
No oO Yes ~ The dratt regulatory provisions for the designated region make this usa assessable under the planning scheme,
{Ensure Question 2.1 in this checklist is answered yes. This requires Questions 2.1.1 - 2.1.13 to be answered aiso},
This application must be referred to the Department of infrastructure and Planning (DIP) as Concurrence Agency,

 

(b} Does the application involve residential development involving a rural residential purpose as defined in Schedule 2 of
the draft regulatory provisions?

No oO Yes — The draft regulatory provisions for the designated region make this use assessable under the planning scheme.
(Ensure Question 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also).
This Application must be referred to the Department of infrastructure and Planning (DIP) as Concurrence Agency.

: (c) Does the application involve an urban activity as defined in Schedule 2 of the draft regulatory provisions?
: (CJ No -Endofja)-ic) (1) Yes

if yes, are the premises included in a structure plan as defined under IPA, Schedule 10

Yes
: if yes, does the IPA, section 3.1.6 apply to the application?
: oO No - End of (c} Oo Yes - The draft regulatary provisions for the designated region make this use assessable under the
planning scheme. (Ensure Question 2.1 in this checklist is answered ‘yes’, This requires
f Questions 2.1.1 ~ 2.1.13 to be answered also). This application must be referred to the
i Department of Infrastructure and Planning (DIP) as Concurrence Agency.
! [No

Itno, does the following apply?

:() | Impact assessment is required under the planning s scheme _

:(li) The premises exceed the number stated in section 2.1(b)(ii) of the draft
: regulatory provisions cet bene
The gross floor area, as defined in Schedule 2 of the draft regulatory provisions,
on the premises will exceed the number stated in section 2.1(b)(iii) of the draft
regulatory provisions

 
    

  

 

 

If yes to any one of (i) - {iii) above - The draft regulatory provisions for the designated region make this use assessable under
the planning scheme. (Ensure Question 2.1 in this checklist is answered yes’. This
requires Questions 2.1.1 - 2.1.13 0 08 answered also). [his application must be reterred
to the Deparment of infrastructure and Plannit DIP) as Concur

; For the part of the premises within the Regional Landscape and Rural Production (RLRP) Area (Question (a))
i (d) Does the application invoive an urban activity as defined in Schedule 2 of the draft regulatory provisions?

 

     

i 0 Yes
; If yes, is every urban activity in the application excluded from being assessable under section 2.4(2) of the draft
: regulatory provisions?
oO Yes - End of a} J No - The draft regulatory provisions for the designated region make this use assessable under the planning :
scheme. (Ensure Question 2.1 in this checklist is answered ‘yes’, This requires Questions 2.1.1 ~ 2.1.13!
to be answered also}. This application must be referred to the Department of Infrastructure and Planning
{DIP) as Concurrence Agency.
[LINo

If no, does the application involve residential development involving a rural residential purpose as defined in
Schedule 2 of the draft requlatory provisions?

(71 No - Eng of a? OD Yes

 

 

 

 

 

 

22 State Planning Regulatory Provisions (Regional Ptans) are the draft regutatory provisions

Page 12

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published].pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.