Council archive · source document
08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published] · 142008.1041
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
SEQ REGIONAL PLAN
341A
ls any part of the premises within the South East Queensland (SEQ) Regional Plan area?
(No -Goa3118 (] Yes
If yes, is the application seeking approval for subdivision? ‘?
CINo -Gota312 (7 Yes - Answer both (a) and (b) below
{a) 1s any part of the premises located within a Major Development Area and not included in a structure plan as defined under
the SEQ Regional Plan Regulatory Provisions?
LINo- Gow C1 Yes
‘The subdivision:
) Creates lots with a size greater than qOOhectares ‘oO No Oves '
i) “Creates a residual lot 0 gO No (1 Yes ‘
Gi) Creates the same number or fewer lots than the number of lots being subdivided , oO No [1 Yes ,
Ww) Creates a single additional fot when an existing tot is severed by a road that was , oa No [1] Yes
gazetted before 2 March 2006
“W) Creates a single additional lot for an emergency services facility ~ : oO No oO Yes
a Creates a ‘single additional lot for a water cycle management i infrastructure a oO No o Yes .
| (vil) Creates a single additional lot for waste management facility LINo © C1 Yes :
re Creates a single additional lot for telecommunications infrastructure ~~ a No “By Yes ,
_ (ix) Creates a single additional lot for electricity infrastructure . [ino [1 Yes ,
_{x) Creates a single additional lot for cemetery or a crematorium . CINo .( Yes
‘(xi) ls carried out in association with ‘a development approval for a material change of use of ‘oO No |] Yes
premises that has not lapsed, if the development approval was for a development
application that was made before 31 October 2006
(xi) Is carried out in association with a ‘development approval for a 3 material change of u useof [No [Yes :
premises that -
« — was given for development made assessable under SEQ Regional Plan Regulatory
Provisions, section 2.1 or 2.2; and
+ has not lapsed
(xi) Creates iots for a purpose or is being carried out in association with development other other oO No O Yes
than those stated in (i) - (xii) above
If yes to other development under (xiii) above - This application must be referred to the Department of infrastructure and Planning
{DIP} as Concurrence Agency. Answer {b) on the next page of this Checklist
31 For the purposes of the SEQ Regional Plan, subdivision means - (a) creating a lot by subdividing another lot; or (b) dividing land into parts by agreement (other than a lease for a
term, including renewal options, not exceeding 10 years) rendering different parts of a lot immediately available for separate disposition or separate occupation)
Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.