Skip to the record
Accept no imitations.

Council archive · source document

08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published] · 142008.1041

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS}?

 

3.11B

 

 

Is any part of the premises within a designated region under Schedule 1 of the draft regulatory provisions?
(No -Got00312 (1) Yes

It yes, is the application seeking aporoval for subdivision as defined in Schedule 2 of the draft regulatory provisions?
No -Go0312  [L] Yes - Answer both (a) and (b) below

(a) 1s any part of the premises located within a master planned area and not included in a structure plan, to which section
3.1(4) of the draft regulatory provisions apply?
(J No- Goto) (Yes
if yes, indicate whether or not the following circumstances apply to the subdivision proposal ~ (Tick # applicable)
. The subdivision:

 

 

 

|
-- ——— -—- +. —-—-- - a 4
‘{i) Creates lots with a size greater than the number stated i in section 3.1(2)(a) of the draft O No ‘0 Yes j
| regulatory provisions?

! ti) Creates a residual lot as defined in in Schedule 2 of the draft regulatory provisions ‘(No (Yes '

: (iii) Creates a single additional lot under section 3. 120) of ‘the draft regulatory provisions oO No Yes ;

 

 

 

 

“(iv) Creates a ‘single additional lot for an emergency services facility ‘oO No ‘ Cl Yes

"wy Creates | a single additional lot for water cycle management infrastructure dg No ; Oo Yes
‘a Creates ¢ a 1 single additional lot for a waste management facility , ~~ No oO Yes
“win Creates a single additional lot for telecommunications infrastructure : i CINo Oo Yes *
‘i Gras a single additional fot for electricity infrastructure eo I oO No Lives
; (x) Creates a single additional lot for cemetery or a crematorium ‘ Ono ‘(Yes

(x) ls carried out in association with a development approval for a material change of use of Ono [Yes
premises that has not lapsed, if the development approval was for a development
application that was made before the day the draft regulatory provisions for the
designated region took effect

| .

; ies :

| (xi) 4s carried out in association with a development approval fora material change. of use of Oo No i Cres :

| premises that - . \

: * — was given for development made assessable under the draft regulatory provisions, .

| section 2.1 or 2.2; and '
* has not lapsed

"oxi Creates lots fora purpose o or is being carried outir in association with ‘development ather other a No ‘oO Yes
than those stated in (i) - (xi) above : !
if yes to other development under (xii) above - This application must be referred to the Department of infrastructure and Plannung
{DIP} as Concurrence Agency. Answer (b} on the next page of this Checklist

 

 

32 State Planning Regulatory Provisions (Regional Plans) are the draft regulatory provisions

Page 21

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published].pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.