08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published] · 142008.1041

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

SECTION 4 Section 4 must ba completed when the application seeks approval to carry out operational work.

 

PLANNING SCHEME

 

41

\s any of the proposed operaljenal work assessable under a planning scheme?
LIN - Gotoa4.2 Yes ~ (Complete Form 1, Part E) Answer Qs4.1.1 ~ 4.1.7 below.

 

STATE-CONTROLLED ROAD

 

4.11

apf art of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No

it exceed the threshold?

If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
doi
sor O Yes - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency.

CI Yes
If yes, is all of the proposed operational work associated with the following?

(i) A material change of use that is assessable under the planning scheme Ono (1) Yes

(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number of lots ([]No [] Yes
abutting the State-controlled road

If no to either or both (i) or (ji) above - Answer (a) - (c) below

{a) Is >f the proposed operational work associated with access to a State-controlled road?
od oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency,

(b) Is any of the prope xd operational work for filling or excavation?

CINo 1. 88
It yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMA) as Concurrence Agency
(1 Yes - This application must be reterred to DMR as Advice Agency.

(c) Doer -y of the proposed operational work involve the redirection or intensification of site stormwater from the land,
tb oyna Pry a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
a) Yes

IE yes, is the operational work proposed in a future State-controlled road not defined by route?
C No - This application must be referred to the Department of Main Roads {OMA} as Concurrence Agency.
oO Yes - This appiication must be referred to OMR as Advice Agency.

Burt &. LADIO 2, itt 3.1F Reguiawen sofiduie 2. tab’o 3, dat 110}

 

iF Reguiasen, %

 

ACID SULFATE SOILS

 

4.1.2

 

Development Involving Ag Sulfate Soils?
LINo - Go 0 04.1.3

if yes, is the eee level of any point where work is being carried out less than 20m AHD?
LI No Yes

Hf yes, does the proposed operational work involve the following? A

(i) Excavating more than 1,000m? of soil or sediment at or below 5m AHD o 6] Yes

(ii) Filling the premises with 1.000m3 or more of material with an average depth of 0.5m on No [(] Yes
land, soil or sediment at or below 5m AHD

Is any of the cng proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
Ye

S

If yes to either or both (i) or (if) above - This application must to be referred to the Department of Natural Resources and Water (NRW) as
Advice Agency

tate 3, fen t Ske Paareung Poy 2.02" Pannn:

  

IP Brguation, schediue 2 Manes

 

 

 

 

“1 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Covioola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstona, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torras, Townsville, Whitsunday

Page 27

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published].pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.