08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published] · 142008.1041
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
DECLARED FISH HABITAT AREA; WILD RIVER AREA
4.13 | |s any ofthe proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries
94.
No -Gotoasi¢ (1 Yes
If yes, is the operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below) .
(i) The maintenance of existing structures, including for example the following structures, if the structures -[]No (7 Yes
were constructed in compliance with all the requirements, under any Act, relating to a structure of that
type -
+ Boat ramps, boardwalks, drains, fences, jetties, roads. safety signs, swimming enclosures & weirs;
» Existing powerlines or associated powerline infrastructure
: (i) Educational or research purposes | relating to the fish habitat area - ‘or No. ‘a Yes”
(ii) Monitoring the impact of development on the declared fish habitat area ‘a No" ‘Oo Yes
{iv) The construction or placement of structures, including for example, safety signs, swimming enclosures oO No ‘Oo Yes
and aids to navigation, if ~ ,
* The impact on the area is minor; and
+ The structures are constructed in compliance with all the requirements, under any Act, relating toa
structure of that type
: {v) Public benefit works, including, for example, | the consiruction of runnels for mosquito control, the ‘CINo a Yes”
removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is minor i
(a) if yes to one or more of (i) ~ (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
Q Yes ~ A permit for that aspect of the operational work is not required. Go to Q4.14 Ol No - Go to (b)
(b) If no to alt of (i) — (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
O No - (Complete Form 1, Part O:} This application requires assessment by the Department of Primary industries and Fishenes (DPIBF). it DPI8F is not
the Assessment Manager for the application, the agency wil have jurisdiction as Concurrence Agency.
(1 Yes
If yes, is all of the proposed operationat work for specified works under the Wild Rivers Act 2005?
C] Yes - Uniess the application is consistent with any property development plan applying to the land, the Assessment Manager must reluse to
receive it. (Complete Form 1, Part Oz) This appication requires assessment by the Department of Primary industries and Fisheries
(OFI&F) and assessment for the purpases of the Wild Rivers Act 2005. if OPIGF is no! the Assessment Manager for the appication, the
agency has jurisdiction as Concurrence Agency.
(No
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
oO No - Unless the appiicalion is consistent with any property development plan applying io the tand, the Assessment Manager must refuse
fo recewe it (Complete Form 1, Part Q.) This application requires assessment by the Department of Primary industries and
Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purpases of the Wik Rivers
Act 2065. if DPI&F is not the Assessment Manager for the appication, the agency has jurisdiction as Concurrence Agency.
Oo Yes - An application for the operational work will be taken to be not, Droperly made and the assessment manager must refuse to
fecene it.
Page 36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.