Council archive · source document
08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published] · 142008.1041
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008 character of the locality. For more Information go to schedule 2 table 1 of the IP Regulation - hitp/Awww.Jegisialion.qid.gov.awActs Sls/Acts SL i.han| and the QDC part 20. Assessment period 15 days, No response is 8 deemed refusal eet poene buiidtags maybe occupledfor 144. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes For mora infomation goto oe 2 table 1 of he IP may trigger a referral to the local govemment as the concurrence agency. Regulation - http iAwew legislation.gid.gov.awAcs Sis/Acts SL_Lhim Assessment period 15 days. No response is a deemed rofusal. Design and siting 15. An application may trigger referral to the local government as the concurrence agency if the enemas 9 0 schedule 2 lable 1 of the IP building work does not comply with the performance criteria of parts 11 and 12 of the hip islation. pld.oov.awActs SL: Lhim Queensland Development Code. Assessment period 5 days, No response is adeemad | 16. An application may trigger referral to the local goverment as the concurrence agency if the sofusal building work does not comply with the qualitative statement for building clearance and site cover. 17. An application may trigger referral to the local government as the concurrence agency if the building work does not comply with the qualitative statement for performance criteria 4, 5, 7,8 or 9 of the Queensland Development Code, part 11 or 12. fite safety In particular Budget accommodation 18. An application may trigger referral to the local government as the concurrence agency to hormen information goto schedule 2 table 1 of the IP determine the building will comply with the fire safety standard under the Building Act 1975 Regutation - when the building work has been completed. hitowww legislation. ald.gov.au/Acig Si.s/Acts SL I.ntm Assessment period 15 days. No response is a deemed refusal Higher risk personal appearence services 19. An application may trigger referral to the local government as the concurrence agency to For mor information g0 to schedule 2 table 1 of the IP determine if the building work Regulation - /hwww tenisiation.gkooy.awAcls StsiActs SL thin] * — complies with the performance criteria of the Queensland Development Code, part 15; and and the QDC pan 15. © — the work does not comply with an acceptable solution stated in the part. Assessment period 15 days. No response is a deemed refusal, Bullding work for residential service 20, An application for building work for premises in which residential care service under the Residential Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger referral to the local government as the concurrence agency. Assessment period 15 days. No response is a deemed refusal. Building work for removal or rebuilding 21. An application for the removal and/or rebuilding at another site of a building or other structure, fewemornaten 90 to schedule 2 table 1 of he IP will trigger referral to the local government as the concurrence agency. bitovAwww Jegistation.gld.gov.awA: iLs/Acts SL hho Assessment period 5 days. No response is a deemed refusal. Building work for rainwater tank in designated 22. An application may trigger referral to the local government as the concurrence agency to rainwater tank area wo pgs . A ery For ore information goto le 2 table 1 ofthe IP determine if the building work or structure complies with the relevant performance criteria if - Regulation - ¢ Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of My 7 relevant building work, in a designated rainwater tank area; and © Under ihe Gueensiand Deveiopment Code, part 25, the sainwatar tank dees actinclude.an- acceptable solution for a relevant performance criterion. Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your teliance on this process and the information contained on this form. APPENDIX 1, Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1041 - Op Works - Landscaping, Drainage, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.