Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

MCU11/0033 Development Application - Part 1 of 2 Cover Letter - IDAS Form 1 and 5 Checklist 1 and Part 2 - 6 Piper St Peregian Beach

of 38

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

    5.10 Will the development be carried out on land to which a property development plan under the Wild RiversAct
    2oo5applies?


        No      •   A development permit is required
                •   Your application must include Environmentally relevant activity-IDA5 forms
                •   This application requires assessment by the Department of Environment and Resource Management (DERM).
                    If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
                    agency and you must give DERM a copy of the application

        Yes



    5.11 Is the development consistent with the property development plan?


        Yes     •   A development permit is required
                •   Your application must include Environmentally relevant activity-/DASform 8
                •   This application requires assessment by the Department of Environment and Resource Management (DERM).
                    If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
                    agency and you must give DERM a copy of the application

        No      •   Prohibited development. A development application cannot be made


Section reference:
•     Sustainable PlanningAct2009, schedule i, items 2, 9, io and ii
•     Sustainable Planning Regulation, schedule 3, part i, table 5, items 4 and 5
•     Sustainable Planning Regulation, schedule 7, table 2, items i and 24




    Part 6-Strategic port land or airport land


    6.1 Does the land use plan for the strategic port land or airport land state that the development is assessable
    development?


         No     •   End of part 6 of this checklist

        Yes     • A development permit is required
                • Your application must include:

                    •   for a material change of use - Material change of use assessable againsta planningscheme-/DASform
                        5
                    •   for building or operational work - Building or operational work assessable against a planningscheme-
                        IDAS Form 6
                    •   for reconfiguring a lot - Reconfiguring a lot-IDASForm7


Section reference:
•     Sustainable PlanningRegulation, schedule 3, part 2, table 5, items 6 and 7




                                                                                                         IDAS checklist i
                                                                                            Version i. o 18 December 2009

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU11_0033 Development Application - Part 1 of 2 Cover Letter - IDAS Form 1 and 5 Checklist 1 and Part 2 - 6 Piper St Peregian Beach.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.