Council archive · source document
40 arakoon cres change · 131999.982857.1
although the proposed development is shown
on the Landslide Hazard Overlay as being in
the moderate, high or very high landslide
hazard area, the landslide risk is low or very
low.
OR
AO22.3
A site-specific geotechnical assessment is
prepared by a registered professional engineer
to certify that:
- the stability of the site, including
associated buildings and
infrastructure, will be maintained and
operational for the life of the
development;
- the site is not subject to the risk of
landslide activity originating from other
land, including land above the site;
and
- development of the site will not
increase the risk of landslide activity
on other land;
AO22.3
A site-specific geotechnical assessment is
prepared by a registered professional engineer
to certify that:
- the stability of the site, including
associated buildings and
infrastructure, will be maintained and
operational for the life of the
development;
- the site is not subject to the risk of
landslide activity originating from other
land, including land above the site;
and
- development of the site will not
increase the risk of landslide activity
on other land;
Editor's Note— PSP8 Natural Hazards provides
further guidance on assessing landslide hazard.
AO22.4
Any specific measures identified in
a site specific geotechnical assessment for
stabilising the site or development are to be
fully implemented.
4.3 Key issues
4.3.1 Building Height in Storeys
The Performance Outcomes (PO7) seek for buildings to not exceed two storeys. The existing
building is three storeys in section and over 8m relative to Natural Ground Level. The relevant
purpose and overall outcome are included below:
a) The distinct look and feel of existing residential neighbourhoods is retained, and development makes a positive
contribution to the streetscape, maintaining the low density and low scale character.
m) Development responds to land constraints including topography, bushfire and flood.
The proposed changes reduce the extent of three storey encroachment by setting back the top floor
and including a large void area above the second floor living area.
Page 12 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
40 arakoon cres change.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.