PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2022
and acceptable outcomes AO6.2 of the Biodiversity Code and PO7, Overall Outcomes 1 d, e and
2 c of the Reconfiguring a Lot Code.
Bushfire Hazard Overlay
The Lot is mapped as having areas of high potential bushfire intensity (western edge and band
through riparian) and Potential Impact Buffer for the majority of site. The development proposes
the Lot 2 building envelope sits within the area not mapped as having the bushfire hazard overlay
with the Bushfire Hazard Report detailing that a 60m separation will provide a new dwelling within
Lot 2 a setback distance sufficient to achieve less than 10kW/m2 radiant heat impact and will result
in an acceptable level of bushfire risk to the proposed dwelling.
The bushfire management plan however, does not take into account separation distances to the
required revegetation of the riparian buffer (discussed above) to the east of the building envelope.
Instead, the applicant submits that revegetation would introduce a new unit of hazardous
vegetation within the site resulting in an unacceptable bushfire risk to the development.
Based upon this information there is a possibility that the setback requirements to the revegetated
riparian buffer area would result in the building envelope area being relocated to the west of its
current position and within the PMF flood area.
Therefore, without an updated bushfire management plan Council is unable to determine
compliance with the Bushfire Hazard code and in particular PO7 that lot design and building siting
minimises bushfire hazard risk to people and property
3. CONSULTATION
3.1 Referral Agencies
3.2 Internal Council Referrals
The application was forwarded to the following internal Council officers:
Coordinator, Development Engineering
Environment Officer
4. CONCLUSION & REASONS FOR DECISION
The application seeks to subdivide the existing lot into 2 lots however the applicant has not
demonstrated an appropriate lot can be provided. The lot is constrained by flooding, bushfire and
biodiversity protection requirements. Whilst the applicant has provided a Building envelope outside
the PMF, they have failed to demonstrate a suitable access to the rear lot across the waterway in
flood events and that a sufficient bushfire buffer can be provided for the building envelope given
the scheme’s requirement to rehabilitate the riparian buffer and wildlife link.
Despite requests to provide this information so that Council cannot fully consider the facts and
circumstances surrounding these constraints in more detail, the applicant has chosen not to
provide the information needed. Accordingly, the application is recommended for refusal.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 32 of 63
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.