PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2022
Page 56 of 63
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 SEPTEMBER 2022
1. MSQ perspective - Presentation by General Manager MSQ
Discussion:
There were rapid changes in weather conditions, from severe to extreme, meaning staff were
stretched, and access to the Brisbane River restricted. At least 300 pontoons were lost, and over
7,000 tonnes of debris removed from across south-east Queensland. There was significant
damage to navigational aids, loss of a ferry, wharves, and a tanker loose in the Port.
Local governments have been requested to provide cost figures to QRA on the recovery efforts
and cleanup. NSC CEO offered to provide NSC costs.
Monitoring polystyrene pollution impacts on the environment and wildlife (including locations and
outcomes) should be included in the costs as the long-term effects are still unknown.
MSQ to undertake a root cause analysis to better understand why so many polystyrene-filled
structures broke away and adopt a preventive response for future flood events. This includes
manufacturing standards for whole of life and installation, the need for inspections and ID
requirements on pontoons and decommissioning standards including recycled materials.
Risk analyses and standards review of pontoon building material is needed in light of increased
extreme weather events. Tracking devices on pontoons will assist with the thousands of pontoons
which are not registered to an owner. Past products standards, particularly regarding tethering,
are not aligned with the increase in severity of climate events.
Minutes - Polystyrene Round Table - 21 July 2022 Page 4
Page 56 of 63See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.