Original source · versioned page text
9307-OPW RFI 1 Civil Plans
Original PDF page 4, section 3. The text section number identifies this passage in the reader.
E
S
W PROTECTED AND RETAINED MAY BE RETAINED. COM
P
AND LOCALISED EXCAVATION FOR FOOTINGS OR
SW
SW DEEP SOIL CULTIVATION FOR TREES ETC., WHICH
COM COM U.N.O. ALL EXISTING VERGE SERVICES TO HAVE NOT BEEN MODELLED IN BULK EARTHWORKS
P E P DESIGN: TTM DRAWN: TTM SCALES: AS SHOWN
SWBE PROTECTED AND RETAINED. IF SURFACE HAVE NOT BEEN QUANTIFIED.
MP
W V
COMP CHKD: LS APPRD: TTM DATE: 30.01.2026
DAMAGED OR CO DISTURBED,
SW CONTRACTOR
CO
MP 6. CONTRACTOR IS RESPONSIBLE FOR THE FINAL
COM TO REINSTATE ALL EXISTING SERVICES TO CONFIRMATION OF QUANTITIES BASED ON EXISTING mpn JOB DRAWING No. REV
P E
W RELEVANT AUTHORITY'S SATISFACTION. SITE CONDITIONS AND BULK EARTHWORKS DESIGN. 0 2 4 6 8 10
9307 BE.1.01
SW
COM
P L
W E SCALE 1:200 (A1) 1:400 (A3)
FOR APPROVAL
SW
COM
P
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (9307-OPW RFI 1 Civil Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.