Attachment 4
Engineering Report


[OCR of page images]
Attachment 4

 

[_ngineering Keport
Full text of the other 58 pages

Page 2

                   PRELIMINARY
                ENGINEERING REPORT
                           Proposed Development
                                     at
                      27 Attunga Heights, Noosa Heads
                             Lot 27 on RP 89506

                                            for
                                        David Neate
                              C5756/17/ENG REVISION A
                                            January 2017
                                               JW/jl

    Prepared by             WALSH PROFESSIONAL ENGINEERS ABN 39 611 482 716
                             - Civil Engineering
                             - Project Management

                            Suite 15 – 72 Wises Road, Maroochydore Qld 4558
                            P. O. Box 5512
                            Maroochydore BC Qld 4558
                            Telephone:      (07) 5443 4443
                            Facsimile:      (07) 5443 5855
                            e-mail:         [email protected]

    The content of this document is provided in strict commercial confidence. The content of this
    document shall not be disclosed to any third party, without the express written authority of
    Walsh Professional Engineers.



                                              Document Control

       Revision                                                C5756/15/ENG-REV A - Authorised for Issue
                           Author          Signature
No.          Date                                           Reviewer         Signature     Document Status
Orig      Nov 2015       Justin Walsh                      Justin Walsh                             P

  A        Jan 2017      Justin Walsh                      Justin Walsh

R - Revision               F – Final                    A - Approval                 P - Preliminary

Page 3

                                                - CONTENTS -

1.0   INTRODUCTION ....................................................................................... 1
2.0   SITE DESCRIPTION .................................................................................. 1
3.0   PROPOSED DEVELOPMENT APPLICATION .................................... 2
4.0   ACCESS ....................................................................................................... 2
5.0   PEDESTRIAN CONNECTIVITY............................................................. 2
6.0   STORMWATER MANAGEMENT.......................................................... 2
 6.1   Stormwater Connection .............................................................................. 2
 6.2   Legal Point of Discharge............................................................................. 3
 6.3   Stormwater Quantity Management ........................................................... 3
 6.3.1 Time of Concentration – Pre/Post Developed ......................................... 3
 6.3.2 Pre/Post Developed Discharge ................................................................. 3
 6.3.3 Catchment Details ....................................................................................... 4
 6.4   Stormwater Quality Management ............................................................. 5
7.0   SEWERAGE RETICULATION ................................................................ 6
8.0   WATER SUPPLY ........................................................................................ 7
9.0   ELECTRICITY AND TELECOMMUNICATIONS ............................... 7
10.0 GEOTECHNICAL ...................................................................................... 7
11.0 EARTHWORKS ......................................................................................... 8
12.0 CONCLUSION ........................................................................................... 8




APPENDICES

APPENDIX A -                 Locality Plan

APPENDIX B -                 Development Layout Plan

APPENDIX C -                 Preliminary Engineering Drawings

APPENDIX D -                 Dial Before You Dig (DBYD) Search

APPENDIX E -                 Stormwater Attenuation Spreadsheets

Page 4

1.0    INTRODUCTION

       Walsh Professional Engineers was commissioned by Innovative Planning
       Solutions, on behalf of David Neate, to prepare a Preliminary Engineering Report
       to support a Development Application to the Noosa Shire Council.

       This report addresses the engineering issues associated with the civil design and
       construction of the proposed development.

       The individual areas of civil design and construction addressed include:
           Access
           Pedestrian Connectivity
           Stormwater Management
           Sewerage Reticulation
           Water Supply
           Electricity and Telecommunications
           Geotechnical
           Earthworks

       This report concludes that there are no major engineering constraints or
       impediments to the proposed development that cannot be overcome with sound
       engineering design.

2.0    SITE DESCRIPTION

       The subject site is located at 27 Attunga Heights, Noosa Heads and is legally
       described as Lot 27 on RP 89506. The land has an area of 1.802ha and contains an
       existing residential dwelling and associated infrastructure (to be removed). To
       the south the site has a frontage of approximately 18.3 metres to the residential
       street of Attunga Heights Road. The remaining perimeter is bordered by existing
       tourist development, to the west (Picture Point Crescent), east (Alma Way) and
       to the north (Halse Lane).

       The subject site generally slopes east north east from a ridge that runs along the
       western boundary and Attunga Heights towards Alma Way. Slope varies from
       20% up to 60%. Elevations range from approximately RL 58m AHD at the
       Attunga Heights Access point to approximately RL 8m at the existing gully
       located towards the north-east corner.

       There is an existing drainage gully which flows in a northerly direction, snaking
       along the eastern boundary. The existing gully has an upstream external
       catchment.

       A site locality plan and aerial photograph are included within Appendix A.
______________________________________________________________________________
C5756/17/Engineering Report - 27 Attunga Heights, Noosa Heads          1
January 2017   JW/jl

Page 5

3.0    PROPOSED DEVELOPMENT APPLICATION

       The application is a Development Permit for a Reconfiguration of a Lot – 1 into 4
       lots and a Material Change of Use – 3 detached houses plus 12 dwelling units.

4.0    ACCESS

       Access to the proposed development will primarily (Apartments 1 to 12 and the
       proposed residential allotment) be taken from the end of the existing Attunga
       Heights cul-de-sac head via a new 5.5m wide concrete driveway. Although the
       driveway will be privately owned (body corporate), longitudinal grades have
       been designed to accord with the requirements of the Noosa Shire Council
       Planning Scheme Policy No. 5 for an ‘Access Road’ classification, thereby
       providing suitable access and egress for Council’s waste collection vehicles. A
       ‘tee head’ turnaround in accordance with Queensland Streets is proposed at the
       end of the entry driveway to enable vehicles to perform a three point turn as
       required.

       Access for Lots 3 and 4 will be taken from the existing Alma Way road
       construction located within the Peppers Noosa Resort & Villas development.
       Existing access easements (and rights) exist to facilitate this arrangement.

       The proposed access driveway locations and preliminary longitudinal and cross
       sections are shown on the Preliminary Engineering Drawings contained within
       Appendix C.

5.0    PEDESTRIAN CONNECTIVITY

       Pedestrian connectivity is readily available to Noosa Heads. There is an existing
       gravel walking track that commences at Attunga Heights Road and extends
       down Picture Point Crescent onto Noosa Drive. The proposed development will
       maintain direct access to this walking track.

6.0    STORMWATER MANAGEMENT

       6.1     Stormwater Connection

       The existing Gully that snakes the eastern boundary, flowing in a northerly
       direction, currently receives runoff from the site via sheet flow. There is no
       stormwater infrastructure available within the site to allow direct connection to
       council piped network.
______________________________________________________________________________
C5756/17/Engineering Report - 27 Attunga Heights, Noosa Heads                   2
January 2017   JW/jl

Page 6

       6.2     Legal Point of Discharge

       This existing natural drainage gully is considered to represent the legal point of
       discharge for the proposed development.

       6.3     Stormwater Quantity Management

       The site will be subject to limited development works and is expected to contain
       ≤ 25% total impervious area in the post developed case (up from 0%) which will
       result in a slight increase to peak discharge of stormwater runoff leaving the site.

       Non-worsening of peak discharge will be achieved by providing a combined
       rainwater attenuation/reuse tank for each proposed new lot with connection to
       be made to roof areas only. Stormwater runoff generated over the proposed
       access driveway will discharge unattenuated to the existing discharge point.
       Roof water runoff will effectively be ‘over-attenuated’ to compensate for those
       areas of the site not subject to detention measures.

       Balance areas of the site not subject to development works have not been
       considered in attenuation calculations.

               6.3.1 Time of Concentration – Pre/Post Developed

               Stormwater runoff from the pre-developed site is generally directed to the
               central gully as sheet and channel flow. This flow regime will be
               maintained in the developed case.

               A pre-developed TOC of 10mins has been adopted for each sub-catchment
               within the site. Given the steep topography of the site, this is considered a
               conservative estimate.

               A post developed TOC of 6 minutes (5 minute standard inlet time + 1
               minute piped flow) has been adopted for all sub-catchments for the
               developed case.
               6.3.2 Pre/Post Developed Discharge

               A Microsoft Excel spreadsheet has been prepared for each sub-catchment
               which quantifies pre-developed and post-developed (detained) runoff
               volumes. Refer to Appendix E for screenshots detailing inputs and results
               of the proposed attenuation measures.



______________________________________________________________________________
C5756/17/Engineering Report - 27 Attunga Heights, Noosa Heads          3
January 2017   JW/jl

Page 7

               6.3.3 Catchment Details

               Please refer to Table 6.3.3a for details of the post developed catchments
               considered in stormwater quantity calculations. A total of seventeen (17)
               sub-catchments were analysed in order to determine a single suitably
               sized tank/orifice-outlet configuration. A 5.0kL tank combined with a
               50mm low flow orifice was found to adequately control discharge for all
               townhouse sub-catchments examined.

               A 5.0kL tank combined with a 55mm low flow orifice was found to
               adequately control discharge for the proposed residential lot.

               Table 6.3.3a Catchment and Tank Details

         Town     Roof Area Road Area    Total    Tank Vol   Orifice   Stage
         House      (m²)       (m²)     Area (m²)   (KL)    Dia (mm) Depth (mm)
            1            175    134.25     309.25       5.0        50       1913
            2            165    134.25     299.25       5.0        50       1754
            3            165    134.25     299.25       5.0        50       1754
            4            165    134.25     299.25       5.0        50       1754
            5            175    134.25     309.25       5.0        50       1913
            6            175    134.25     309.25       5.0        50       1913
            7            175    134.25     309.25       5.0        50       1913
            8            175    134.25     309.25       5.0        50       1913
            9            175    134.25     309.25       5.0        50       1913
           10            175    134.25     309.25       5.0        50       1913
           11            160    134.25     294.25       5.0        50       1675
           12            160    134.25     294.25       5.0        50       1675
           13            160     67.00     227.00       5.0        50       1675
           14            160     67.00     227.00       5.0        50       1675
           15            160     63.50     223.50       5.0        50       1675
           16            160     63.50     223.50       5.0        50       1675
        Res Lot         200*      0.00       200*       5.0        55       1927
       *Assumed roof area. To be confirmed when development plans are made
       available.

               Please note that roof/driveway catchment details are based on
               preliminary architectural plans and may be subject to refinement at the
               OPW design stage.




______________________________________________________________________________
C5756/17/Engineering Report - 27 Attunga Heights, Noosa Heads          4
January 2017   JW/jl

Page 8

               Flows up to and including the major Q100 storm event will be conveyed
               to and attenuated by the proposed attenuation tanks. Inspection of Excel
               screenshots (Appendix E) demonstrates that attenuation of stormwater
               runoff to pre-developed levels is achievable for all proposed sub-
               catchments.

               A total attenuation volume of 5kL will be required under covenant for
               each proposed townhouse/residential dwelling with a further 3kL of
               storage to be made available for indoor non-potable and outdoor
               irrigation reuse (8kL total) with low flow pipes sized to provide non-
               worsening of peak discharge volumes for a range of storm events.

               Please refer to the attached engineering drawings in Appendix C for
               locations and details of proposed attenuation measures.

       6.4     Stormwater Quality Management

       The site currently consists of 100% pervious land with significant tree/shrub
       cover. The proposed development will result in ≤ 25% of the site area becoming
       impervious, typically made up of roof and hardstand/road areas.

       For the purposes of stormwater quality management, the following design
       standards have been considered;

                      Table 3.4 – Desired Standard of Service – Stormwater Management
                       – Noosa Priority Infrastructure Plan
                      Table 14-61 – Water Sensitive Design Code – The Noosa Plan
                      Table 2 – Implementation Guideline No. 7 - South East Queensland
                       Regional Plan.

       The proposed development will result in ≤ 25% of the site being covered by
       impervious surfaces. In accordance with Item 3 – Table 2 – Design Objectives for
       Urban Stormwater Management – Implementation Guideline No. 7 - SEQ Regional
       Plan the development is exempt from pollutant load reduction targets provided;

              Stormwater from all impervious areas is captured and managed prior to
                discharge
              Management of captured stormwater includes reuse of stormwater and
                /or infiltration of stormwater to native soils.




______________________________________________________________________________
C5756/17/Engineering Report - 27 Attunga Heights, Noosa Heads          5
January 2017   JW/jl

Page 9

       In order to comply with the above conditions, it is proposed to direct all roof
       runoff to rainwater attenuation/reuse tanks. A 5kL rainwater detention tank will
       be provided for each new dwelling (covenant requirement) for stormwater
       attenuation as per the previous section, with a second tank with capacity of 3kL
       provided for indoor non-potable and outdoor irrigation reuse.

       Access driveway runoff will be directed to Rapid Infiltration Pits (RIP’s) for
       minor event treatment, with major event overflow discharging via a stabilised
       level spreader into the existing gully within the site.

       Please refer to the attached preliminary engineering drawings for details and
       locations of the proposed RIP’s.

       An 1800mm diameter x 1700mm RIP is proposed to accept discharge from each
       access driveway sub-catchment. Where required, pits will be linked by overflow
       pipework which will discharge major storm event runoff to the existing
       waterway via a stabilised level spreader.

       Please refer to the attached engineering drawings in Appendix C for locations of
       the rainwater tanks and rapid infiltration pits.

       This approach is considered to satisfy the requirements of the above listed State
       and Council guidelines.

7.0    SEWERAGE RETICULATION

       Proposed units 1-12 will be connected to reticulated sewer via an internal gravity
       sewer network than will connect to the existing manhole SM2668739 in Picture
       Point Crescent with an Invert level of 19.35m AHD (from UW records).

       Proposed Lot 2 can readily connect to existing manhole SM2670601 located just
       outside of north-east boundary. Similarly, proposed Lot 3 can be serviced by the
       existing manhole SM2670583 located in Alma Way.

       It is proposed that Lot 4 be serviced by a privately owned packaged pump
       station with macerator, which will lift effluent to the existing manhole in Alma
       Way, SM2670588. Adjacent gravity reticulation is approximately 3-5m above
       expected lot finished floor levels.



______________________________________________________________________________
C5756/17/Engineering Report - 27 Attunga Heights, Noosa Heads          6
January 2017   JW/jl

Page 10

8.0    WATER SUPPLY

       Mains water supply is readily available for all proposed units and the residential
       allotments.

       An internal 100mm main (including fire service) will be provided internally for
       units 1-12 with connection for the main taken from Attunga Heights. The internal
       main will have a single body corporate meter for the 100mm connection with
       internal metering undertaken for each unit.

       Proposed Lot 2 will be serviced by a single water service from Attunga Heights.

       Lots 3 and 4 can be readily serviced from existing water mains located in Alma
       Way.

       A preliminary layout of the proposed water reticulation is shown within
       Appendix C, Preliminary Engineering Drawings.



9.0    ELECTRICITY AND TELECOMMUNICATIONS

       Electrical and communications supply is readily available in Attunga Heights
       from existing overhead supply for proposed Lot 2 and units 1-12.

       Lots 3 and 4 can be connected to existing underground power and
       communications located in Alma Way.



10.0   GEOTECHNICAL

       A comprehensive geotechnical report has been prepared for the subject site by
       Golders Associates to support the Reconfiguration of a Lot Application and is
       included in the Town Planning Application. The report discusses surface and
       subsurface conditions, and foundation conditions, footing systems, earthworks,
       drainage issues and slope stability. The recommendations contained within the
       report should be implemented throughout design and construction of both the
       proposed development and subsequent design and construction of residential
       dwellings.




______________________________________________________________________________
C5756/17/Engineering Report - 27 Attunga Heights, Noosa Heads          7
January 2017   JW/jl

Page 11

11.0   EARTHWORKS

       Proposed earthworks are generally limited to that required for the construction
       of the proposed access driveway (and associated drainage structures) and
       proposed construction of infrastructure (sewer, water, electrical &
       telecommunications). Due to the site slope, a detailed geotechnical report has
       been prepared by Golder and Associates and should be referred to for site
       specific recommendations and limitations.


12.0   CONCLUSION

       The proposed development at 27 Attunga Heights Noosa Heads can be readily
       serviced by existing infrastructure available at or near the subject site.

       There are no constraints or impediments to the proposed residential
       development that cannot be overcome by sound engineering design and best
       practice construction methods.




______________________________________________________________________________
C5756/17/Engineering Report - 27 Attunga Heights, Noosa Heads          8
January 2017   JW/jl

Page 12

Appendix

A

Locality Plan

 

Page 13

 

 

(ob :c5756 ~~ DRAWING SCHEDULE )
(ORG No -) (DESCRIPTION )

5756/15/P20] { LOCALITY PLAN

(5756/15/P21 | | DEVELOPMENT LAYOUT PLAN

5756/15/P22 | | PRELIMINARY ROADWORKS & DRAINAGE LAYOUT

(5756/15/P23 || PRELIMINARY SEWER & WATER LAYOUT

C5756/15/P24 | | PRELIMINARY ENTRY DRIVEWAY LONGITUDINAL SECTION
(5756/15/P25 || PRELIMINARY ENTRY DRIVEWAY CROSS SECTIONS - SHEET 1 OF 3
C5756/15/P26 | | PRELIMINARY ENTRY DRIVEWAY CROSS SECTIONS - SHEET 2 OF 3
C5756/15/P27 || PRELIMINARY ENTRY DRIVEWAY CROSS SECTIONS - SHEET 3 OF 3
C5756/15/P28 } |_ PRELIMINARY DRIVEWAY 2 LONGITUDINAL & CROSS SECTIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pa AT ae
meen ael Wee

PROPERTY DESCRIPTION

Lot 27 on RP89506
27 Attunga Heights, Noosa Heads ya
; eet = Ht
Parish of Weyba
County of March 0 50 100 150 200 = 250m

L.G.A. = Noosa Shire Council bee Rt tt

SCALE 1:2500 A1, 1:5000 A3

 

 

 

 

 

 

 

 
 
 

 

NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. | Design: PROJECT DRAWING TITLE:
Drawn: A.C.N. 611 482 716 LOCALITY PLAN
PRELIMINARY Date: ‘ sir Wises Road, Maroochydore, QLD PROPOSED DEVELOPMENT (COURTESY OF INNOVATIVE PLANNING SOLUTIONS)
NOT FOR CONSTRUCTION }ox 5512, Maroochydore BC, Rowsiom sat
Tel (07) 5443 4443 Fax (07) 5443 5855 DRAWING No:
chested Ts (07 tes aaa Faxon 643855 | at 27 ATTUNGA HEIGHTS, NOOSA HEADS 5756/15/20 ae
Oe PROFESSIONAL ENGINEERS wet: http:/vww.WalshEng.net.au for DAVID NEATE © us en Coppi. Other Hen for the pouposes of wad sje tothe cones pressed onder he
a | 19017017 | MINOR LAYOUT CHANGES & TITLEBLOCK AMENDED FROMTATE PE.TOWALSHP.. | AL aw DIRECTOR APPROVAL Datum AHD compe, seorin'aF otherns wit
Rev | DATE DESCRIPTION By | CHKO RPEQ- 4665 ‘At SHEET SIZE FILENAME C5756-15°20<0g -OATE: 19/117- 1230p ~ XREFS [_ Council Ref Busineers. All enquiries should be di

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 14

Appendix

 

Development
Layout Plan

 

Page 15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCALE 1:500 At, 1:1000 A3
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. | Design: - PROJECT: DEVEL OPMENT LAYOUT PLAN
Drawn: AL AC.N. 611 482 716
PRELIMINARY ] __ Date: ocr 201s 15/72 Wises Road, Maroochydore, aLD | PROPOSED DEVELOPMENT
NOT FOR CONSTRUCTION Fro on Baas tas eae On) 5a on Revision heat
e ax :

checked Te (0754 as Fax 07 8443 5885 } at 27 ATTUNGA HEIGHTS, NOOSA HEADS DRAWNS NO: C5756/15/P21 A ftw
eels PROFESSIONAL ENGINEERS wet: http:/vww.WalshEng.net.au for DAVID NEATE © Ths len Coppi. Other then for the purposes of aad sje to the cations presi ander Ce
A |rornorr] woRLAYOUT CHANGES eTTERLOcKAMENDED RONTATERE,TOWNLSHPE,| AL ow “TTY DIRECTOR APPROVAL Datum AD or ccpyites recording of othres) be repotced sored aa seta sete ok anomie? whee fh prey

Rev | DATE DESCRIPTION py | cHKD RPEQ- 4665 At SHEET SIZE FLENANE CHTSEIS°2t On “DATE” TOIMT- tpn - AREFS:X 796 GASE PRELMINEW [_Councit Ref: Rieter. il exquties shoul te dyertt fo Takh Potsnal Riggers bt Wabh Professional

 

 

 

 

 

 

 

 

 

Page 16

Appendix

C

 

Preliminary
Engineering Drawings

 

Page 17

 
  
  
  
 
  
 
  
 
 
   

     

   

r-PaaS
‘PROPOSED
LOoT3

 

 
 
 
 

“PROPOSED ~*=
~ TURNAROUND ~

  

TP 146.354

  

900sq TYPE D GALVANISED

 

 

  

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LEGEND:

PROPOSED STORMWATER GULLY PIT
PROPOSED STORMWATER PIPE

e PROPOSED RAPID INFILTRATION PIT
° PROPOSED STORMWATER MANHOLE
o PROPOSED RAINWATER HARVESTING

(RE-USE) & DETENTION TANK

 

 

NOTE:

REFER TO TATE PROFESSIONAL ENGINEERS REPORT
C5756/15/ENG FOR DETAILS OF HYDRAULIC MODELLING
AND SIZE REQUIREMENTS OF RAPID INFILTRATION PITS
AND ATTENUATION/RE-USE TANKS.

 

 

   
  
 
 
 
 

PROPOSED

. ACCESS TO 2,
RESIDENTIAL

ALLOTMENT.

      
  
   
 

 

 

 

 

 

 

 

 

 

 

GRATE FIX WITH 2/M12 S/S
BOLTS.
SURFACE LEVEL VARIES REFER TABLE
¥v
ELE eee
i i
ay CONVERTOR SLAB & RISER
TO MANUFACTURERS SPEC.
? L
HDPE ROOFWATER INLET PIPE TO RAPID INFILTRATION PIT DIMENSIONS
HYDRAULIC CONSULTANTS DETAILS.
CMT TYPE PIT DIA (mm) | PIT DEPTH (mm)
DIAMETER AS SPECIFIED DRIVEWAY 1800 1700
IN TABLE

a

a

ke

By

a

| REMOVABLE BIDIMA14

Z| | GEOFABRIC FILTER, WEIGHT

= WITH ROCK SPALLS.

th

a
3
s
3
8
8

= ZO
CLEAN COARSE SAND FILTER 75mm BASALT ROCKSPALLS
WRAPPED IN BIDIM 14 0 10 2 30 40 50m
GEOFABRIC
RAPID INFILTRATION PIT DETAIL SCALE 1:500 At, 1:1000 A3
NTS.
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. Design: - PROJECT: DRAWING TITLE:
Drawn: AL ACN. 611 482 716 PRELIMINARY ROADWORKS & DRAINAGE LAYOUT
PRELIMINARY Date: ocr 2015 15/72 Wises Road, Maroochydore, aLD | PROPOSED DEVELOPMENT
perroreasraco FO Eo Se oma ft rsa wa
el ax :
Checked Enaveeqnees@Wesntrenetan | at 27 ATTUNGA HEIGHTS, NOOSA HEADS DRAWINGNO:  ©5756/15/P22 A lao
lt PROFESSIONAL ENGINEERS web:hi/iwwatsnengnetau | to DAVID) NEATE pn Carga a foe pens of an le Me us greed mire
A | 19101017 | MINOR LAYOUT CHANGES & TITLEBLOCK AMENDED FROM TATE PLE.TOWALSHPE,| AL aw DIRECTOR APPROVAL Datum AHD Ol copying, recording or otherwise) be reproduced, stored in a retvieva) system or transmitted without the prior
Rev | DATE DESCRIPTION sy | cHKD RPEQ- 4665 "AI SHEET SIZE FLENAME C5166 1S?220nG DATE? TOIT: lpn » XReFe XSTSOGASE-PRELIM NEW [_ Council Ref Engineer A cuguen should be divested oy Mak. Frosssoual Bighseers ms Tb Taek Profesional

 

 

 

 

 

 

 

 

 

 

 

Page 18

LEGEND:

--O-s— —-
=<
—e-s—
—

 

 

 

 

EXISTING UNITYWATER SEWER
PROPOSED UNITYWATER SEWER
PROPOSED BODY CORPORATE SEWER
PROPOSED PRIVATE RISING MAIN
EXISTING UNITYWATER WATER
PROPOSED UNITYWATER WATER
PROPOSED BODY CORPORATE WATER

 

——S ==

PROVIDE PRIVATELY OWNED PACKAGE
——__PUMP STATION WITH RISING MAIN TO. ~
EXISTING MANHOLE SM2670588. 2

PROVIDE SEWER CONNECTION
TO SERVICE APARTMENTS 1-12.

 

 

 

 

 

  

a
PROVIDE WATER
CONNECTION TO
‘SERVICE LOT 4.

PROPOSED |
Lora ©
1,592m?

Ww
~—\. PROVIDE 150mm DIA SEWER MAIN
EXTENSION FROM EXISTING MANHOLE
$M2668739. EXISTING SL 20.65, IL 19.35. —= yy
SS ~

SS

   
  
 
 
 

 
 
 
 
 
 
  

   

__— PROVIDE NEW 150mm DIA SEWER LINE

 
 
 
  
 
  
   

& MANHOLE FROM EXISTING MANHOLE ~
$M2670583. EXISTING SL 23.22, IL 22.45.

 
     
  
  

 

—

PEPPERS NOOSA RESORT & VILLAS

PROVIDE SEWER
CONNECTION TO
SERVICE LOT 3.

 

PROVIDE WATER poof
CONNECTION TO
SERVICE LOT 3.

 

  
 
 
 
   

 
   
  
 
  
  
 

PROVIDE SEWER
CONNECTION TO
SERVICE LOT 2.

 

==

=

PROVIDE NEW 100mm DIA STUB CONNECTION os
TO EXISTING SM2670601, IL 36.04.
EXISTING MANHOLE SL 36.97, IL 35.99.

 

PROVIDE WATER CONNECTION
* TO SERVICE PROPOSED
* RESIDENTIAL ALLOTMENT.

PROVIDE GROUP TITLE WATER METER
TO SERVICE APARTMENTS 1-12.

  
  

  

   

  

30 40

|

SCALE 1:500 A1, 1:1000 A3.

 

NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES.

 

A__| tgl0v2017 | WINOR LAYOUT CHANGES & TITLEBLOCK AMENDED FROM TATE PE, TOWALSHP., | AL

 

Rev | DATE

 

 

 

DESCRIPTION BY

 

 

CHKD

 

PRELIMINARY

NOT FOR CONSTRUCTION

DIRECTOR APPROVAL
RPEQ- 4665

Design:
Drawn:
Date:

Checked

AL
OCT 2015

WALSH

PROFESSIONAL ENGINEERS

 

Datum _AHD

ACN. 611 482 716
15/72 Wises Road, Maroochydore, QLD
PO Box 5512, Maroochydore BC, 4558
Tel (07) 5443 4443 Fax (07) 5443 5855
Email: [email protected]
Web: http://www. WalshEng.net.au

 

 

A‘ SHEET SIZE

FILENAME : C5756-1523.dug DATE: 19/1/17- 1:20pm - XREFS: X5756-BASE-PRELIM NEW

 

 

PROJECT:

PROPOSED DEVELOPMENT
at 27 ATTUNGA HEIGHTS, NOOSA HEADS
for DAVID NEATE

DRAWING TITLE:
PRELIMINARY SEWER & WATER LAYOUT

 

Sheet
4 of 9

Revision

C5756/15/P23 A

DRAWING No:

 

 

 

© This plon is Copyright. Other than for the purposes of and subject to the conditions prescribed under the
Copynight Act, no part of it may in any form or by any means (electronic, mechanical, micro copying, photo
copsing, recording or otherwise) be reproduced, stored in a retrieval system of transmitted without the prior

 

[_ Council Ref

 

mitten permission of Walsh onal Engineers. All 1 property remains within Walsh Professional
Engineers, All enquiries should be directed to Takh Professional Bugineers,

 

 

Page 19

CREST 0.683, 60.904
I'P.5.000, 60.955

 

 

 

 

 
  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N
Bol \\ 2
gs \ 8
s® g
Ss S
38 =
s a
8
\ 5
\ g
ig. g
sce
ees
tos \
3
RES
eee
s.
Box fe
8
\
g 3
2 8
* =
gl g
9 8
, 8 3
\ 5 3
nm 8
$
\g
° aS
8 |8e -
+ sE8
S ies
8 SES
# [gbs/e PR.
“Fs|88o N
= s3a
Bes
ees
e8
VC LENGTH C10 ISS \VCI7.5 vg10 | ve10
VC RADIUS R62 R100 | Rijoo Rb7 | R133,
GRADE 1.400% |-15.d00% _ | -20.00% -12|509% -1,009%_|-12.400% _-§.000%
DATUM R.L.30.0 \ iS CS
nlels! 2! clslslalelsislels 2
CUT(-)/FILL(+) 3/8) a8/8| 8) §/8)8) 3) sss) &) slsjslsiajsjaje,2) ks) BIS
sleisis[e} al] alata, “| sieiel sl sieleleielelele| + 7 sls
DESIGN SURFACE /|8/€/5/S/2| 8] S/8/5) 8] s/ Sis} 8} Bi8/S[Ss/FisjAiZ|s 8 s\<
S/S) S/S} &) AG) 8) S| Bays SF SSNgafeyeja/ se 8 gle
LEVELS S\S3| SSB) Bl Ble SB) S| SSS] FS) SISISIS(S/S/s/S/ 3 8 5/5
els|eleicl si! clels) gs! elele) ef ceeisisiglels 2 ele
NATURAL SURFACE /8)2/=/8/5) 8) ls/=| 8) 82/8) &) SIR/E/S|2/8/8/5/8) 8) BIS
LEVELS S\S| SSB) 8) Biss) S| SISiS| FS) SISiSiSisis|sis| 8 8/8
els) ef slzlslelslelelele 2 ele
glelx| gs! elelel gs) ssl} 8} sesisisisie|gis g s\s
CHAINAGE g/s| 8/8/5} 8) 8/8)8) 8) Beis) =) Seesisisisisjs) sg} SIE
S\Ni lsis| sf alsin} cs} al 8/8} & 8/8/5/S/S/8/8/8\ 8 8 IS
sla/ S{Ria} S| Bis/s) 8] SySiei S| SeiejFisieieie)e & QS
RAS R-A7.S R-20 R20 RA00R-50 R50
HC DATA ~ r 0 2 0 60 80 toom HORIZONTAL SCALE
4:1000 At, 1:2000 A3
Horiz. 1:1000 fore ff |
Vert. 1:100 VERTICAL SCALE
Q 2 4 8 8 10m 4:10 A1, 1.200 A3
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. Design: - PROJECT: DRAWING TITLE:
Drawn: AL AC.N. 611 482 716 PRELIMINARY ENTRY DRIVEWAY LONGITUDINAL SECTION

t012017

TITLEBLOGK AMENDED FROM TATE PE, TO WALSH PE,

AL

 

 

REV

 

DATE

 

DESCRIPTION

 

BY

 

 

PRELIMINARY

NOT FOR CONSTRUCTION

DIRECTOR APPROVAL
RPEQ- 4665

Date: OCT 2015

WALSH

Checked

 

Datum _AHD

15/72 Wises Road, Maroochydore, QLD
PO Box 5512, Maroochydore BC, 4558
Tel (07) 5443 4443 Fax (07) 5443 5855,

Email: Engineers@WalshEng .net.au

PROFESSIONAL ENGINEERS web: hitp:/vww.WalshEng.net.au

PROPOSED DEVELOPMENT

for DAVID NEATE

 

 

‘At SHEET SIZE FILENAME : C5756-1524. dug -OATE: 19/117 12:10pm - XREFS

 

 

 

at 27 ATTUNGA HEIGHTS, NOOSA HEADS

 

 

 

 

DRAWING N Revision Sheet
Jo:
C5756/15/P24 A 5 of 8
© This plan i Copyright. Other then for the purposes of and subject fo fhe conditions prescribed under Ae
copyright Act, no fart-of 1 may in any form or by any means (electron, mechanical, nero copying, photo~

    

copsing, recording or otherwise) be reproduced, stored in a retrieval system of transmitted without the prior
written permission of Walsh Professional Engineers, all intellectual property remains within Walsh Professional
Engineers, All enquiries should be directed to Takh Professional Bugineers,

 

Council Ref:

 

 

Page 20

we 2 PROPOSED VEHICLE AND PEDESTRIAN
| & BARRIER AS NECESSARY.

PROPOSED RETAINING WALL TO STRUCTURAL
ENGINEERS DETAILS, TYPICAL. DETAILED
DESIGN PROVIDED AT OPW DESIGN STAGE.

 

 

  

 

 

Grade Level 53.245

  

 

 

 

 

 

 

ae go RL.41.00
Ta Grade Level 49.405
40 R.L-50.00
Grade Level 55.659
67.263 _~— R.L.41.00
Grade Level 50.997
zd R.L.55.00
Grade Level 58.705
|
13.656 R.L.$7.00
Grade Level 59.657
&
Sa 0 20 40 60 80 10.0m
vs
&
ane a SCALE 1:100 A1, 1:200 A3 ~~

 

 

 

NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. Design: - PROJECT: DRAWING TITLE:

 

 

Drawn: A.C.N. 611 482 716 PRELIMINARY ENTRY DRIVEWAY CROSS SECTIONS
PRELIMINARY | oes: corzns Wa [ S Hi A ort 402 6. rcochydore, ato | PROPOSED DEVELOPMENT PRELIMINARY
NOT FOR CONSTRUCTION PO Box 5512, Maroochydore BC, 4558 Revision Sheet
T(r sts aes rrr | at ATTUNGA HEIGHTS, NOOSA HEADS

Checked Email: Engineers@WalshEng net au DRAWING No: _€5756/15/P25 A | bof 8

 

 

 

ceteeeeeees PROFESSIONAL ENGINEERS. wet: hito:www WalshEng.net.au © This plan i Copsnight. Other than for the purposes of and subject to the conditions prescribed unde

| oir] smsstoccmeneo rourarene romans a lo Pee siccibaneeiggi — for DAVID NEATE Tne gs aa it a has 2 tay ach [Sea estat ad toe

  
 

 

  

 

 

copying, recording or othervise) be reproduced, stored in a retvieval system or trausmitted without the prior

ten permission of Walsh Professional Engineers, all iutellectusl property remains within Walsh Professional
REV | DATE DESCRIPTION By | CHKD RPEQ- 4665 ‘At SHEET SIZE FILENAME : C5756-15-25-927 dug DATE: 19/17 - 12139 - XREF's Council Ref: Engineers. All enquiries should be diected fo Tabh Frofessfouel Euineers

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 21

PROPOSED RETAINING WALL TO STRUCTURAL
ENGINEERS DETAILS, TYPICAL. DETAILED
DESIGN PROVIDED AT OPW DESIGN STAGE.

106.554

 

 

   

 

 

 

PROPOSED VEHICLE AND PEDESTRIAN
BARRIER AS NECESSARY.

PROPOSED RETAINING WALL TO STRUCTURAL

ENGINEERS DETAILS, TYPICAL. DETAILED
ee DESIGN PROVIDED AT OPW DESIGN STAGE.

 

 

Grade Level 44.405

Grade Level 46.086

 

Grade Level 46.905

 

 

Grade Level 47.831

137.627

 

0 20 40 6.0 8.0 10.0m

|

SCALE 1:100 A1, 1:200 A3.

 

 

Grade Level 42.202

Grade Level 42.423

 

 

 

Grade Level 43.060

 

NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES.

 

t9012017

TITLEBLOGK AMENDED FROM TATE PE, TO WALSH PE, AL Ww

 

 

REV

 

DATE

 

DESCRIPTION BY

 

 

 

PRELIMINARY

NOT FOR CONSTRUCTION

DIRECTOR APPROVAL
RPEQ- 4665

 

PROJECT:

PROPOSED DEVELOPMENT

for DAVID NEATE

 

Design: -
Drawn: AL ACN. 611 482 716
Date: ocr 2018 15/72 Wises Road, Maroochydore, QLD
PO Box 5512, Maroochydore BC, 4558
Tel (07) 5443 4443 Fax (07) 5443 5855
Checked: Email: Engineers@WalshEng net.au
oe PROFESSIONAL ENGINEERS wet: hito:/www.WalshEng.net.au
Datum AHD
FLENANE CHTSOISPOSPZT On -ONTE” TOTNT-Tebon - REFS

 

A‘ SHEET SIZE

 

 

DRAWING TITLE:
PRELIMINARY ENTRY DRIVEWAY CROSS SECTIONS

 

at ATTUNGA HEIGHTS, NOOSA HEADS

SHEET 2 OF 3
; Revision Sheet
DRAWING No: €5756/15/P26 A | To 8

 

 

 

Council Ref:

© This plon is Copyright. Other than for the purposes of and subject to the conditions prescribed under the

Copynight Act, no part of it may in any form or by any means (electronic, mechanical, micro copying, photo

copsing, recording or otherwise) be reproduced, stored in a retrieval system of transmitted without the prior

written permission of Walsh Professional Engineers, all intellectual property remains within Walsh Professional
neers, All enquiries should be directed to Takh Professional Bugineers,

 

 

 

Page 22

 

 

  

160.773 _ _§
Grade Level 41.122

  
  

220 _ LUO
Grade Level 37.030

PROPOSED VEHICLE AND PEDESTRIAN

RARER AS NECESSARY.

PROPOSED RETAINING WALL TO STRUCTURAL .

ENGINEERS DETAILS, TYPICAL. DETAILED
Be DESIGN PROVIDED AT OPW DESIGN STAGE. ~A

PROPOSED RETAINING WALL TO STRUCTURAL
ENGINEERS DETAILS, TYPICAL. DETAILED
DESIGN PROVIDED AT OPW DESIGN STAGE.

   

 

 

 
 

PROPOSED ‘TEE HEAD'
TURN-A-ROUND AREA.

   

 

     

  

 

 

 

 

 

 

 

 

 

 

 

 

 

160 __
200 __
Grade Level 38.030
146.354 ORS NA
wo 180 _
~AL 0 20 40 6.0 80 10.0m
~ SCALE 1:100 At, 1:200 A3 és
wo R184.00 169499 RBBB
Grade Level 41.905 Grade Level 40.919
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. | Design: - PROJECT: DRAWING TITLE:
Drawn: AL ACN. 611 482 716 PRELIMINARY ENTRY DRIVEWAY CROSS SECTIONS
PRELIMINARY Date: OcT 2015 15/72 Wises Road, Maroochydore, aLD | PROPOSED DEVELOPMENT SHEET 3 OF 3
NOT FOR CONSTRUCTION PO Box 5512, Maroochydore BC, 4558 Revision Sheet
checked ee es atonaseertae. | at ATTUNGA HEIGHTS, NOOSA HEADS DRAWINGNO: 65756/15/P27 A bof 8
OONOO eae ee eens PROFESSIONAL ENGINEERS. (wet: http:/www.WalshEng.net.au for DAVID NEATE © Ms pn Gopi Other Hen for the pupowes of ud eajet fo fhe onions presi onder fe
| reoieotr| smes.ocx aienoeo FON TATERETOWALSHPE a fo Po ciReCTOR MPPROVAL 7 Datum AnD or cops. rcrdng or other) be rpotied: stoped mn Tear) sen oneed tnt er
REV _| DATE DESCRIPTION By | cHKo RPEQ- 4665 ‘Al SHEET SIZE FILENAME OSTSEISP2SPOT aug. DATES TON Tel6on - REFS Coundll Ref: Rieter. il exquties shoul te dyertt fo Takh Potsnal Riggers bt Wabh Professional

 

 

 

 

 

 

 

 

 

Page 23

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Grade Level 57.244

 

 

 

 

  
 
  

   

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

2
§
s
y Grade Level 56.994
/
3/2
go} 8
gg
28
qo ~~ > @
ma 3 é
- af 2.4m Pye
ae aR PAR °
00
Grade Level 56.74.
VC LENGTH
A
> ® PROPOSED VEHICLE AND PEDESTRIAN
GRADE 5.000% a) " BARRIER AS NECESSARY.
DATUM R.L.40.0 — PROPOSED RETAINING WALL TO STRUCTURAL,
3 8| 8 ENGINEERS DETAILS, TYPICAL. DETAILED
2 8 ,
CUT(-)/FILL(+) 8 3| 3 DESIGN PROVIDED AT OPW DESIGN STAGE.
DESIGN SURFACE 8 3 8
LEVELS 8 85
NATURAL SURFACE § & =
LEVELS 8 BL
2 8/8
CHAINAGE 8 s| 3 5.5m TYPICAL,
s| s
s &| &
HC DATA -
Horiz. 1:1000 TT
Vert. 1:100
HORIZONTAL SCALE
0 20 40 60 80 100m 4900 at, 1:2000 a3 0 20 40 6.0 8.0 10.0m
VERTICAL SCALE SCALE 1:100 A‘, 1:200 A3 oot
° 2 ‘ 8 8 1m 4100 At, 1:200 A3
§ R.L-50.00
Grade Level 56.244
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. f Design: - PROJECT: DRAWING TITLE:
Drawn: AL ACN. 611 482 716 PRELIMINARY DRIVEWAY 2 LONG. & CROSS SECTIONS
PRELIMINARY Date: ocr 2015 15/72 Wises Road, Maroochydore, aLD | PROPOSED DEVELOPMENT
reece. PO ox 2. rondo Se reso]
e ‘ax :
pct To (7 44s 444 aor 448 5855 | at 27 ATTUNGA HEIGHTS, NOOSA HEADS DRAWNGNE:65756/15/P28 a leas
anne PROFESSIONAL ENGINEERS web: hitp:/vww.WalshEng.net.au for DAVID NEATE ha Caporale We Gag peed wer
| reoietr| smestock atenoeo Fou TATERE TOWALSHPE a fo Po ciReCTOR MPPROVAL 7 Datum AnD or Coppin recordag of other) be teprodced, seeds renal stem oy rangnited une the peer
Rev | DATE DESCRIPTION sy | cHKD RPEQ- 4665 "Ai SHEET SIZE FLENAME C5156 15 P28.00y DATE: TANT TtTpm ” XREFS Council Ref: Engineer A cuguen should be divested oy Mak. Frosssoual Bighseers ms Tb Taek Profesional

 

 

 

 

 

 

 

 

 

 

 

 

Page 24

Appendix

Dial Before You Dig
(D.B.Y.D) Search

 

Page 25

Head Office:

@ Ground Floor, 33 King Street
Caboolture QLD 4510

Mailing Address:

Unitywater PO Box 953, Caboolture QLD 4510
Serving you today, 1300 0 UNITY (1300 086 489)
investing in tomorrow. www.unitywater.com

ABN: 89 791 717 472

Company: Tate Professional Engineers Ptyu Ltd
Address: PO BOX 1092 Mooloolaba QLD 4557

Date: 20/10/2015

Water/Sewer Infrastructure Plan - Detailed

Request Details
Your Reference _| C5756
Enquiry date 20/10/2015

 

 

 

 

 

Lot Number 27
Plan Number RP89506
Address 27 Attunga Hts, NOOSA HEADS, QLD 4567

 

 

Sequence No 1208624271

 

 

 

Thank you for your recent enquiry.
Please find attached the plan for the above Lot and Plan as requested.

If you have further questions, please call the Customer Service Centre on 1300 0 UNITY (1300
086 489). Alternatively, queries can also be emailed to [email protected] faithfully

E—

Matthew Bower
Manager, Asset Management

Page 1 of 1

Unitywater is a statutory authority that services the Moreton Bay, Sunshine Coast and Caz = Unitywater has certification to
ES ISO 9001 Quality Management and

= ISO 14001 Environmental Management.

   
 

Noosa local authority areas on behalf of its citizens. It is governed by an independent
board. Councils do not have control or direction over day to day operations.

Page 26

Head Office:

@ Ground Floor, 33 King Street
Caboolture QLD 4510

. Mailing Address:
Unitywater PO Box 953, Caboolture QLD 4510
Serving you today, 1300 0 UNITY (1300 086 489)
investing in tomorrow. www.unitywater.com

ABN: 89 791 717 472

Detailed Infrastructure Plan Guide

Unitywater’s Detailed Infrastructure Plans are now presented as two related documents. This
approach replaces the previous single map from the 1/7/2014. The change makes Unitywater
consistent with previous Council approaches, and also with other water utilities in the area. It
also enables the capability to provide more information than was typically clearly shown on the
previous approach, and will assist in reducing costs to customers.

The first document, the map, shows the infrastructure location and identifies each asset with a
unique identifier. The second document, containing tables of information, shows the attribute
values for each unique identifier.

The Unitywater officer preparing your map has identified the infrastructure that is relevant to
the request. This is identified by the yellow outline on the map. The detail of infrastructure that
falls within this outline is included in the second document containing the attribute values.
When you want to find the details for a particular asset, identify the unique number of the asset
on the map (within the yellow outline), and locate the relevant information in the table on the
second document.

 

 

 

Example of Map Document Example of Attribute Data
ff © Pac
wean " °
| Unitywater DIPS Asset Report
“— Date:23/06/2014

free
| Water Pressure Mains

 

 

 

 

 

If you have further questions, please call the Customer Service Centre on 1300 0 UNITY (1300
086 489). Alternatively, queries can also be emailed to [email protected] faithfully

E—

Matthew Bower
Manager, Asset Management
Page 1 of 1

= Unitywater has certification to
ISO 9001 Quality Management and
= ISO 14001 Environmental Management.

Unitywater is a statutory authority that services the Moreton Bay, Sunshine Coast and
Noosa local authority areas on behalf of its citizens. It is governed by an independent
board. Councils do not have control or direction over day to day operations.

  
 

 

Page 27

DETAILED INFRASTRUCTURE MAP

Lot Number: 27

Plan Number: RP89506
Printed On: = 20/10/2015
Sequence No: 2512053235

Emergency Situations
Cail Unitywater:
1300 086 489

This information on this plan is valid
for 30 days from "Printed On" date.

Legend
|] extent of Unitywater Area Sewer Service

 

Water —> Sewer sGravity Main

Water Pump Station Sewer Pressure Main

 

 

 

 

Water Service Sewer StoragePipe
Water Valve scmm Sewer Pipe (Abandoned)

Water Hydrant Recycled Water
Tapping Device (&] Recycled Water Pump Station’

Water Main Recycled Water Hydrant

e
—— Trunk Main »« Recycled Water Valve
a

—— Reticulation Main Recycled Water Fitting

i—— Water Service Recycled Water Main

p= Water Pipe (Abandoned) Recycled Water Service

Recycled Water
Sewer Pump Station ===" pipe (Abandoned)

Sewer

Sewer Valve

Sewer Connection Point

 

 

Sewer Manhole

 

Map Tile:

Scale: 1:1026

(If printed at 100%
on A3 size paper)

Unitywater

Geospatial Information Systems
Ground Floor, 33 King St
Caboolture QLD 4510
Inquiries: 1300 0 Unity (1300 086 489)
Email: [email protected]

Disclaimer
‘These Maps are supplied under the following conditions:~

Mapping details are supplied from information contained in Unitywater's
records which may have been furnished to Unitywater by other persons.
Unitywater gives no warranty or guarantee of any kind, expressed,
implied, or statutory, to the correctness or accuracy of the map details
or the degree of compliance with any standards in this matter. Persons
making decisions with financial or legal implications must not rely upon
the map details shown on this plan for the purpose of determining
whether any particular facts or circumstances exist and Unitywater
(and its officers and agents) expressly disclaim responsibility for any
loss or damage suffered as a result of placing reliance upon this information.

178P198103

MONS PARK Capper

s0ra7 247.
41/47 387

. :
‘914? 13/47
WAT 12087

4RP123865
1

‘ =, ORESCENT
ect

O8UP104990

OSUP 103167

osP1s140¢

oe yet045

4402'5

Dy 101025

710318

. 10103/5

, 10405
101045

5 1910815
21005

“yoteers

21025

“Yoto7is Py
21005

 

Page 28

DETAILED INFRASTRUCTURE MAP

LotNumber: 27

Plan Number: RP89506
Printed On: = 20/10/2015
Sequence No: 2512053235

Emergency Situations
Call Unitywater:
1300 086 489

This information on this plan is valid

for 30 days from "Printed On" date.
Legend

| Extent of Unitywater Area Sewer Service

Water ——> Sewer sGravity Main

 

[2] Water Pump Station — Sewer Pressure Main
Water Service Sewer StoragePipe
Water Valve succte Sewer Pipe (Abandoned)

Water Hydrant Recycled Water

Tapping Device [5] Recycled Water Pump Station’
Water Main @ = Recycled Water Hydrant
—— Trunk Main >< Recycled Water Valve

 

a Retieutation Main II Recycled Water Fitting

Water Service — Recycled Water Main

~—~—= Water Pipe (Abandoned) Recycled Water Service

por Recycled Water
Sewer Pump Station 78 Dine (Abandoned)

‘Sewer Valve

 

 

al
@ Sewer Connection Point
e

Sewer Manhole

Map Tile: 3
Scale: = 1:500
(lf printed at 100%
on A3 size paper)

Unitywater

Geospatial Information Systems
Ground Floor, 33 King St
Caboolture QLD 4510
Inquiries: 1300 0 Unity (1300 086 489)
Email: [email protected]

Disclaimer
These Maps are supplied under the following conditions:-

Mapping details are supplied from information contained in Unitywater's
records which may have been furnished to Unitywater by other persons.
Unitywater gives no warranty or guarantee of any kind, expressed,

implied, or statutory, to the correctness or accuracy of the map details

or the degree of compliance with any standards in this matter. Persons
making decisions with financial or legal implications must not rely upon
the map details shown on this plan for the purpose of determining
whether any particular facts or circumstances exist and Unitywater

(and its officers and agents) expressly disclaim responsibility for any
loss or damage suffered as a result of placing reliance upon this information,

417SP 108103

$Mm2668791

1RP220514

5798
an000BUP3140

135,
RR 2135

$32806764

oo000BU

BAT 11147
40/47 2147

12/47 8/47.
9147 13/47

2RP220814

$S2809669

WPM2039847_ e

igTURE POINT CRESCENT
PI

O9000RUP 194990

 

Page 29

DETAILED INFRASTRUCTURE MAP
Lot Number: 27
Plan Number: RP89506
Printed On: = 20/10/2015
Sequence No: 2512053235

NOOSA PARADE

DePLeseNOS

Emergency Situations
Call Unitywater:
1300 086 489

$$2610187

This information on this plan is valid
for 30 days from "Printed On" date.

Legend
[OU] extent of Unitywater Area Sewer Service
Water ——> Sewer sGravily Main

[2] Water Pump Station ‘Sewer Pressure Main

SPM2626690,

Water Service Sewer StoragePipe

Water Valve === Sewer Pipe (Abandoned)

 

~

@ = Water Hydrant Recycled Water

Hm Tapping Device K] Recycled Water Pump Station
Water Main
—— Trunk Main

 

 

 

Recycled Water Hydrant

Reticulation Main

e

7SPI
>< Recycled Water Valve 117SP 108103,
a

Recycled Water Fitting

arts Recycled Water Main

—~ — — Water Pipe (Abandoned) Recycled Water Service
Recycled Water
Sewer Pump Station “= Pipe (Abandoned)

Sewer

Sewer Valve
Sewer Connection Point

Sewer Manhole

 

 

Map Tile: 1
Scale: —1:500
(If printed at 100%
on A3 size paper)

Unitywater

Geospatial Information Systems
Ground Floor, 33 King St
Caboolture QLD 4510
Inquiries: 1300 0 Unity (1300 086 489) SM266973S
Email: [email protected]

$82808530
Disclaimer
These Maps are supplied under the following conditions:-

Mapping details are supplied from information contained in Unitywater's

records which may have been furnished to Unitywater by other persons. oBUP9758
Unitywater gives no warranty or guarantee of any kind, expressed,

implied, or statutory, to the correctness or accuracy of the map details

or the degree of compliance with any standards in this matter. Persons

making decisions with financial or legal implications must not rely upon

the map details shown on this plan for the purpose of determining

whether any particular facts or circumstances exist and Unitywater ovasosUR9758

{and its officers and agents) expressly disclaim responsibility for any

loss or damage suffered as 6 result of placing reliance upon this information.

 

Page 30

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

© Page 3 of 3
Unitywater DIPS Asset Report

Date:20/10/2015 Time:3:18 PM
2668741 Manhole 11.28 10.66 11.28
2668742 Manhole 5.8 3.06 5.8
2668743 Manhole 2.62 1.52 2.62
2668744 Manhole 2.62 1.27 2.62
2668790 Manhole No Info 45.81 No Info
2670584 Manhole 23.09 22.33 23.09
2670585 Manhole 24.22 22.07 24.22
2670586 Manhole 23.59 21.88 23.59
2670587 Manhole 22.82 21.67 22.82
2670588 Manhole 22.68 21.52 22.68
2670589 Manhole 23.73 21.37 23.73
2670590 Manhole 24.24 21.18 24.24
2670591 Manhole 23.76 21.01 23.76
2670592 Manhole 23.48 20.93 23.48
2670593 Manhole 20.41 19.07 20.41
2670613 Manhole 21.82 20.07 21.82
Sewer Services....
Asset Sub Type |Connection |OB Surface Invert level |HBC 10 Distance
Number Type Distance level Length
2808517 Service UNK No Info No Info No Info No Info No Info
2808518 Service UNK No Info No Info No Info No Info No Info
2808519 Service UNK No Info No Info No Info No Info No Info
2808520 Service UNK No Info No Info No Info No Info No Info
2808530 Service UNK No Info 21.5 20.01 No Info 8
2809598 _|Service UNK No Info 24.42 23.04 No Info 18.4
2809599 _|Service UNK No Info 24.03 23.38 No Info 11.77
2809611 Service UNK No Info 24.01 23.3 No Info 11.21
2809614 _|Service UNK No Info 23.03 22.33 No Info 0.85
2809615 _|Service UNK No Info 24.31 23.28 No Info 0.61
2809616 _|Service UNK No Info 24 22.5 No Info 0.82
2809617 Service UNK No Info 24.3 22.94 No Info 0.45
2809669 Service UNK No Info No Info No Info No Info 1
2809963 Service UNK No Info No Info No Info No Info 14.47
No Sewer Connection Points found...
This document may not, in whole or part, be copied, photocopied, reproduced or Page 3 of 3

translated without prior consent from the CEO, Unitywater.

Printed copies are uncontrolled.

 

Page 31

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

© Page 2 of 3
Unitywater DIPS Asset Report

Date:20/10/2015 Time:3:18 PM
2538495 elec PVC-U 150 3.6 22 21.95
2538496 Retiulation PVC-U 150 2.8 21.74 21.73
2538497 Retiuato PVC-U 150 3 21.61 21.61
2538498 Retiulaton PVC-U 150 2.1 23.2 23.19
2538499 Retculaton PVC-U 150 3.5 22.46 22.45
2538501 Retulation PVC-U 150 17.7 22.45 22.34
2538502 Retiulaton PVC-U 150 31.7 22.33 22.11
2538503 Retiulaton PVC-U 150 29.8 21.37 21.22
2538504 Reticuli PVC-U 150 24.7 21.18 21.02
2538505 Reticulaton PVC-U 150 7.8 21.01 20.95
2538506 Retiulaton PVC-U 150 35.6 20.93 19.09
2538507 Reticulaton PVC-U 150 41.1 19.07 14.9
2538511 Retiulaton PVC-U 150 29.5 21.52 21.38
2538512 Reticuli PVC-U 150 16.7 21.67 21.55
2538513 Retiulaton PVC-U 150 31.7 21.88 21.69
2538514 Retiulaton PVC-U 150 26.9 22.07 21.9
2538912 Retulation PVC-U 150 3.5 22.59 22.58
2538913 Reticuli PVC-U 150 2.3 21.43 21.42
2538929 Retulaton PVC-U 150 13.4 23.27 20.22
2538930 Retuaton PVC-U 150 11.2 20.07 19.09
2538931 Reticulation PVC-U 150 19.9 23.4 20.15

Main

Sewer Man Holes....
Asset Number SubType SL IL Roof Level
2668739 Manhole 20.65 19.35 20.65
2668740 Manhole 13.08 12.46 13.08
This document may not, in whole or part, be copied, photocopied, reproduced or Page 2 of 3

translated without prior consent from the CEO, Unitywater.
Printed copies are uncontrolied.

 

Page 32

e
Unitywater

Serving you today,
investing in tomorrow.

Company: Tate Professional Engineers Ptyu Ltd
Address: PO BOX 1092 Mooloolaba QLD 4557

Date: 20/10/2015

Water/Sewer Infrastructure Plan - Detailed

Request Details

Head Office:

Ground Floor, 33 King Street
Caboolture QLD 4510

Mailing Address:

PO Box 953, Caboolture QLD 4510
1300 0 UNITY (1300 086 489)
www.unitywater.com

ABN: 89 791 717 472

 

 

 

 

 

Your Reference | C5756

Enquiry date 20/10/2015

Lot Number 27

Plan Number RP89506

Address 27 Attunga Hts, NOOSA HEADS, QLD 4567

 

 

Sequence No

 

2512053235

 

 

Thank you for your recent enquiry.

Please find attached the plan for the above Lot and Plan as requested.

If you have further questions, please call the Customer Service Centre on 1300 0 UNITY (1300
086 489). Alternatively, queries can also be emailed to [email protected] faithfully

£-

Matthew Bower

Manager, Asset Management

Unitywater is a statutory authority that services the Moreton Bay, Sunshine Coast and
Noosa local authority areas on behalf of its citizens. It is governed by an independent
board. Councils do not have control or direction over day to day operations.

  
 

Page 1 of 1

= Unitywater has certification to
© 9001 Quality Management and
= ISO 14001 Environmental Management.

 

Page 33

Head Office:

@ Ground Floor, 33 King Street
Caboolture QLD 4510

. Mailing Address:
Unitywater PO Box 953, Caboolture QLD 4510
Serving you today, 1300 0 UNITY (1300 086 489)
investing in tomorrow. www.unitywater.com

ABN: 89 791 717 472

Detailed Infrastructure Plan Guide

Unitywater’s Detailed Infrastructure Plans are now presented as two related documents. This
approach replaces the previous single map from the 1/7/2014. The change makes Unitywater
consistent with previous Council approaches, and also with other water utilities in the area. It
also enables the capability to provide more information than was typically clearly shown on the
previous approach, and will assist in reducing costs to customers.

The first document, the map, shows the infrastructure location and identifies each asset with a
unique identifier. The second document, containing tables of information, shows the attribute
values for each unique identifier.

The Unitywater officer preparing your map has identified the infrastructure that is relevant to
the request. This is identified by the yellow outline on the map. The detail of infrastructure that
falls within this outline is included in the second document containing the attribute values.
When you want to find the details for a particular asset, identify the unique number of the asset
on the map (within the yellow outline), and locate the relevant information in the table on the
second document.

 

 

Example of Map Document Example of Attribute Data
f © Pay
| Unitywaler DIPS Asset Report
sarin Date:23/06/2014

 

Water Pressure Mains
Sub’

   

 

 

 

 

 

If you have further questions, please call the Customer Service Centre on 1300 0 UNITY (1300
086 489). Alternatively, queries can also be emailed to [email protected] faithfully

E—

Matthew Bower
Manager, Asset Management
Page 1 of 1

Unitywater is a statutory authority that services the Moreton Bay, Sunshine Coast and | S

Noosa loca! authority areas on behalf of its citizens. It is governed by an independent
board. Councils do not have control or direction over day to day operations.

Unitywater has certification to
ISO 9001 Quality Management and
= 1SO 14001 Environmental Management.

ha

urGn

Page 34

DETAILED INFRASTRUCTURE MAP

Lot Number: 27

Plan Number: RP89506
Printed On: = 20/10/2015
Sequence No: 1208624271

Emergency Situations
Call Unitywater:
1300 086 489

This information on this plan is valid
for 30 days from "Printed On" date.
Legend
[CUT extent of Unitywater Area Sewer Service

Water —— > Sewer sGravity Main

 

 

 

 

 

Water Pump Station —— Sewer Pressure Main
Water Service —— Sewer StoragePipe
Water Valve ~<a Sewer Pipe (Abandoned)

Water Hydrant Recycled Water
Tapping Device 2] Recycled Water Pump Station

 

 

 

 

Water Main Recycled Water Hydrant

°
Trunk Main »4 Recycled Water Valve
Reticulation Main Recycled Water Fitting

Westen Semvics Recycled Water Main

pone Water Pipe (Abandoned) __ pecycled Water Service

Sewer _ Recycled Water
Sewer Pump Station ‘=== Pipe (Abandoned)

Sewer Valve
Sewer Connection Point

Sewer Manhole

 

 

 

Map Tile:

Scale: 1:1026

(If printed at 100%
on A3 size paper)

Unitywater

Geospatial Information Systems
Ground Floor, 33 King St
Caboolture QLD 4510
Inquiries: 1300 0 Unity (1300 086 489)
Email: [email protected]

Disclaimer
‘These Maps are supplied under the following conditions:-

Mapping details are supplied from information contained in Unitywater's
records which may have been furnished to Unitywater by other persons.
Unitywater gives no warranty or guarantee of any kind, expressed,

implied, or statutory, to the correctness or accuracy of the map details

of the degree of compliance with any standards in this matter. Persons
making decisions with financial or legal implications must not rely upon
the map details shown on this plan for the purpose of determining
whether any particular facts or circumstances exist and Unitywater

(and its officers and agents) expressly disclaim responsibility for any
loss or damage suffered as a result of placing reliance upon this information.

3/35 135
US 235
oBUr

asp

Pans
333/33 1133
2/53

36/37 - 49.35/37 7 49
3937 - 49 38/39). 49

osp147914
37-43

100/37 - 49

4RP 123865,
45

port CRESCENT

pcr

OBUP104990.

13/39 12/30
10/30 11/30

Ly
52) 5126 1/26
4/26 6126

3
Sh241124
aiz4 22 23
S 24) j2RP89506

14120 40/20
12/209120 21
‘ARP89SOS
22
1eRP9506

17RPB9506
2

iot0ais

101085

4010715

 

Page 35

DETAILED INFRASTRUCTURE MAP

Lot Number: 27

Plan Number: RP89506
Printed On: = 20/10/2015
Sequence No: 1208624271

Emergency Situations
Call Unitywater:
1300 086 489

This information on this plan is valid
for 30 days from "Printed On" date.

Legend
[J extent of Unitywater Area

Water ——> Sewer sGravity Main
[=] Water Pump Station

Sewer Service

 

——— Sewer Pressure Main

Water Service Sewer StoragePipe

Water Valve ~o=== Sewer Pipe (Abandoned)

Water Hydrant Recycled Water

Tapping Device (1 Recycled Water Pump Station
Water Main @ = Recycled Water Hydrant

i—— Trunk Main > Recycled Water Valve

Reticulation Main I Recycled Water Fitting

—— Water
rt Service —— Recycled Water Main

== Weter Pipe (Abandoned) __ Recycled Water Service

Sewer Recycled Water
Sewer Pump Station ===" Pipe (Abandoned)

Sewer Valve
Sewer Connection Point

Sewer Manhole

 

 

 

Map Tile: 1
Scale: 1:500
(If printed at 100%
on A3 size paper)

Unitywater

Geospatial Information Systems
Ground Floor, 33 King St
Caboolture QLD 4510
Inquiries: 1300 0 Unity (1300 086 489)
Email: [email protected]

Disclaimer
‘These Maps are supplied under the following conditions:

Mapping details are supplied from information contained in Unitywater's
records which may have been furnished to Unitywater by other persons.
Unitywater gives no warranty or guarantee of any kind, expressed,
implied, or statutory, to the correctness or accuracy of the map details
or the degree of compliance with any standards in this matter, Persons
making decisions with financial or legal implications must not rely upon
the map details shown on this plan for the purpose of determining
whether any particular facts or circumstances exist and Unitywater
{and its officers and agents) expressly disclaim responsibility for any
loss or damage suffered as a result of placing reliance upon this information.

4RP 123865
45
2RP220514

‘$S2809669

WPM20398479.

SM2668791

picTURE POINT CRESCENT

G0000BUP 104990 /

covdoBUPS140
1/35
Ws ass

6/25 2199
41295123
000008UP2399

34
3131 YB
op000BUF 196002 a
SM2668735:

J

oBuPra6one34

51331133
4133

! $82806764
/OBUP3140

24196 20/36
48/36 19/36

48P 145620
4133

433
3/33 Y38, .

O0oGOBUP 101

582608461 W338,
4 2a

®

 

Page 36

DETAILED INFRASTRUCTURE MAP
Lot Number: 27
Plan Number: RP89506
Printed On: = 20/10/2015
Sequence No: 1208624271

Emergency Situations
Call Unitywater:
1300 086 489

This information on this plan is valid
for 30 days from "Printed On" date.

Legend

3 Extent of Unitywater Area ——— Sewer Service
Water —> Sewer sGravity Main

[Water Pump Station Sewer Pressure Main
Water Service

 

Sewer StoragePipe

Water Valve === Sewer Pips (Abandoned)
Water Hydrant Recycled Water

‘Tapping Device G5] Recycled Water Pump Station’

Water Main
Trunk Main

Recycled Water Hydrant

Reticulation Main

°
4 Recycled Water Valve
=

Recycled Water Fitting

i—— Water Service Recycled Water Main

fe ater Pipe (Abandoned) Recycled Water Service

Sewer Recycled Water
Sewer Pump Station O"2" Pipe (Abandoned)

Sewer Valve

Sewer Connection Point

 

 

Sewer Manhole

 

Map Tile: 2
Scale: 1:500
(If printed at 100%
on A3 size paper)

Unitywater

Geospatial Information Systems
Ground Floor, 33 King St
Caboolture QLD 4510
Inquiries: 1300 0 Unity (1300 086 489)
Email: [email protected]

Disclaimer
‘These Maps are supplied under the following conditions:-

Mapping details are supplied from information contained in Unitywater's
records which may have been furnished to Unitywater by other persons.
Unitywater gives no warranty or guarantee of any kind, expressed,
implied, or statutory, to the correctness or accuracy of the map details
or the degree of compliance with any standards in this matter. Persons
making decisions with financial or legal implications must not rely upon
the map details shown on this plan for the purpose of determining
whether any particular facts or circumstances exist and Unitywater
(and its officers and agents) expressly disclaim responsibility for any
loss or damage suffered as a result of placing reliance upon this information.

4010415
SM2670586

O104SP 180%
2
=
3 SGM2538495
la
1040595
2104/5

SM2670585
@iozsP 19082

BSP151418

asP1g0a23

ovoonsP 190822

 

Page 37

DETAILED INFRASTRUCTURE MAP = ge2808a61 oBLP 101766
Lot Number: 27 - : = :

Plan Number: RP89506 :

Printed On: 20/10/2015

Sequence No: 1208624271

Emergency Situations 2 ~ 1 5 43130 12/30
Cail Unitywater: c - aisD
1300 086 489
g00c0sUP8920
This information on this plan is valid
for 30 days from "Printed On" date.

Legend

 

990008P 152217

[7] extent of Unitywater Area
Water
[5] Water Pump Station

 

M} Water Service

> Water Valve

@ Water Hydrant

B Tapping Device
Water Main

Sewer Service
—> Sewer sGravity Main
—— Sewer Pressure Main
—— Sewer StoragePipe
acucae Sewer Pipe (Abandoned)

Recycled Water
@] Recycled Water Pump Station

 

 

 

 

@ Recycled Water Hydrant

—— Trunk Main »« = Recycled Water Valve

eetcuiston Mai) Recycled Water Fitting

o_o Recycled Water Main

"= Water Pipe (Abandoned) Recycled Water Service

ewer Recycled Water
Sewer Pump Station Pipe (Abandoned)

>4 Sewer Valve
@ = Sewer Connection Point
e

Sewer Manhole

 

 

 

Map Tile: 3
Scale: —1:500
(If printed at 100%
on A3 size paper)

Unitywater

Geospatial Information Systems
Ground Floor, 33 King St
Caboolture QLD 4510
Inquiries: 1300 0 Unity (1300 086 489)
Email: [email protected]

Disclaimer
These Maps are supplied under the following conditions:-

Mapping details are supplied from information contained in Unitywater's
records which may have been furnished to Unitywater by other persons.
Unitywater gives no warranty or guarantee of any kind, expressed,

implied, or statutory, to the correctness or accuracy of the map details

or the degree of compliance with any standards in this matter. Persons
making decisions with financial or legal implications must not rely upon
the map details shown on this plan for the purpose of determining
whether any particular facts or circumstances exist and Unitywater

(and its officers and agents) expressly disclaim responsibility for any
loss or damage suffered as a result of placing reliance upon this information.

100SP 147914

“882806757,

39/37 - 49
37137 - 49 36/37 - 48

osP152217

37-49
asp 147514

s00/s7 - 49

WPM2014746

WPM2038295 WPM2030754

HIBISCUS AVENUE WPM2030755  wey2016902

SGM2536924

SM266860

27RP89506

SM2668803

5126 1/26
41266126
oo000BUF782

0000 GBUP 10:
5241124
7 @ 4124

®

10/20 11/20
12/209/20

OBUPS827
20

ovo0oBUPEa37

26
OBUPSO68

3}
3)
gi
a]
&
BY
=|
3
2

12RPES506
23

$$2806742

$92806743
1ORPES506

19

 

Page 38

DETAILED INFRASTRUCTURE MAP

Lot Number: 27

Plan Number: RP89506
Printed On: = 20/10/2015
Sequence No: 1208624271

Emergency Situations
Call Unitywater:
1300 086 489

This information on this plan is valid
for 30 days from "Printed On" date.

Legend

I ] Extent of Unitywater Area Sewer Service
Water — +> Sewer sGravity Main

 

Water Pump Station Sewer Pressure Main

 

Water Service Sewer StoragePipe
Water Valve comme Sewer Pipe (Abandoned)

Water Hydrant Recycled Water
%] Recycled Water Pump Station

 

 

 

Tapping Device

 

WPie
WPM2028801 55:7

%
WPM2014795 3

WPM2028893

27RPRO506

'SM257060%

‘SGM2532500

Water Main
—— Trunk Main

Reticulation Main

——— Water Service

@ Recycled Water Hydrant

>< Recycled Water Valve

H_ Recycled Water Fitting
Recycled Water Main

[= Water Pipe (Abandoned) Recycled Water Service

Sewer Recycled Water
Sewer Pump Station oe ine (Abandoned)

»< Sewer Valve

@ Sewer Connection Point

 

@ Sewer Manhole

 

Map Tile: 4
Scale: 1:500
(If printed at 100%

on A3 size paper) ©

Unitywater

Geospatial Infarmatian Systems
Ground Floor, 33 King St
Caboolture QLD 4510
Inquiries: 1300 0 Unity (1300 086 489)
Email: [email protected]

Disclaimer
These Maps are supplied under the following conditions:~

Mapping details are supplied from information contained in Unitywater’s
records which may have been furnished to Unitywater by other persons.
Unitywater gives no warranty or guarantee of any kind, expressed,
implied, or statutory, to the correctness or accuracy of the map details
or the degree of compliance with any standards in this matter. Persons
making decisions with financial or legal implications must not rely upon
the map details shown on this plan for the purpose of determining
whether any particular facts or circumstances exist and Unitywater
(and its officers and agents) expressly disclaim responsibility for any
loss or damage suffered as a result of placing reliance upon this information.

sm2670600

14RPB95CS

$52809596.

24
45RPBSSO6

2]
|
3
Si
Si
Ey}
=
5
a

88260989
‘SM2670599

16RPSS50
22

Ss2sogses 107SP 151408

17RPBSSO6

1148? 188650

e
o
%
on
SS,
Ss
2
ea

SGM2538916
SM2670576

SSm2535017

'sS2809593 sw

108SP 151408

 

Page 39

Unitywater

Date:20/10/2015

Water Pressure Mains....

Page 1 of 3

DIPS Asset Report

Time:3:09 PM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Asset Number SubType Material Pipe Diameter Pipe Length

2014555 Reticulation Main |AC 100 140.8

2014556 Reticulation Main _|AC 100 34

2014675 Reticulation Main _|PVC-U 150 9.4

2014676 Reticulation Main _|PVC-U 150 5

2014795 Reticulation Main _|MS 168 21.8

2014796 Reticulation Main _|PVC-U 150 0.5

2014832 Reticulation Main _|PVC-U 100 10

2028891 Reticulation Main _|PVC-U 150 0.4

2028892 Reticulation Main _ |PVC-U 150 228.8

2028893 Reticulation Main _ |PVC-U 150 0.6

2028894 Reticulation Main _ |PVC-U 150 5.8

2039296 Reticulation Main _|AC 250 726.2

2039847 Reticulation Main _|AC 100 143

2039987 Reticulation Main _|AC 100 227.7

No Recycled Water Pressure Mains found...

No Sewer Pressure Mains found...

Sewer Gravity Mains....

Asset SubType Material Nominal Pipe Length |USIL DSIL

Number Diameter

2534593 Reticulation AC 150 18.4 58.13 57.89

ain

2536924 Reticulation |VC 150 7.1 52.24 52.3
Main

2536925 Reticulation |AC 150 41.8 57.85 52.55
Main

2536926 Reticulation |VC 150 20.8 53.2 52.53
Main

2536928 Reticulation |VC 150 20.3 No Info 52.08
Main

2537358 Reticulation |VC 150 48.2 52.07 51.28
Main

2537384 Reticulation |VC 150 22 45.81 43.4
Main

2537385 Reticulation |VC 150 14 43.37 40.27
Main

2537386 Reticulation |VC 150 11.6 40.14 40.04
Main

2537395 Reticulation |VC 150 10.3 45.28 44.56
Main

This document may not, in whole or part, be copied, photocopied, reproduced or Page 10f3

translated without prior consent from the CEO, Unitywater.

Printed copies are uncontrolled.

 

 

Page 40

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

© Page 2 of 3
Unitywater DIPS Asset Report
Date:20/10/2015 Time:3:09 PM
2537396 Reticulation |VC 150 21.6 44.56 38.84
Main
2538500 Reticulation |PVC-U 150 43 28.3 28.23
Main
2538501 Reticulation {PVC-U 150 17.7 22.45 22.34
Main
2538502 Reticulation |PVC-U 150 31.7 22.33 22.11
Main
2538515 Reticulation |PVC-U 150 16.2 25.02 22.48
Main
2538516 Reticulation |PVC-U 150 21.1 25.74 25.04
Main
2538517 Reticulation PVC-U 150 39.1 26.87 25.76
ain
2538518 Reticulation |DI 150 23.9 28.18 26.89
Main
2538915 Reticulation |PVC-U 150 2.9 27.3 27.26
Main
2538918 Reticulation |PVC-U 150 37.6 47.37 36.03
Main
2538919 Reticulation |PVC-U 150 40.8 56.46 47.4
Main
2538920 Reticulation |PVC-U 150 20.9 35.99 28.32
Main
2538921 Reticulation |PVC-U 150 59.1 48.87 47.4
Main
Sewer Man Holes...
Asset Number SubType SL IL Roof Level
2668790 Manhole No Info 45.81 No Info
2668791 Manhole 40.85 40.14 40.85
2668794 Manhole 46.25 45.28 46.25
2668801 Manhole 54.32 52.24 54.32
2668802 Manhole 53.8 53.2 53.8
2668803 Manhole 59.51 57.85 59.51
2668819 Manhole 53.2 52.07 53.2
2669248 Manhole No Info 44.56 No Info
2669302 Manhole No Info 43.37 No Info
2670578 Manhole 90.23 28.3 90.23
2670580 Manhole 28.4 26.87 28.4
2670581 Manhole 27.27 25.74 27.27
2670582 Manhole 26.59 25.02 26.59
2670583 Manhole 23.23 22.45 23.23
2670584 Manhole 23.09 22.33 23.09
2670599 Manhole 58.07 56.46 58.07
This document may not, in whole or part, be copied, photocopied, reproduced or Page 2 of 3

translated without prior consent from the CEO, Unitywater.
Printed copies are uncontrolled.

 

Page 41

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

© Page 3 of 3
Unitywater DIPS Asset Report
Date:20/10/2015 Time:3:09 PM
2670600 Manhole 49 47.37 49
2670601 Manhole 36.97 35.99 36.97
Sewer Services...
Asset Sub Type |Connection |OB Surface Invert level |HBC 10 Distance
Number Type Distance level Length
2806740 _|Service UNK No Info 54.2 53.19 No Info 46.92
2806741 Service UNK No Info No Info No Info No Info 3.7
2806764 Service UNK No Info No Info 45.3 No Info 14
2806765 Service UNK No Info 54.25 53.15 No Info 6.6
2806766 Service UNK No Info No Info No Info No Info No Info
2806767 Service UNK No Info No Info No Info No Info 17.8
2808461 Service UNK No Info No Info No Info No Info No Info
2809594 _|Service UNK No Info 61.25 60.16 No Info 14.38
2809595 __—|Service UNK No Info 58.83 57.59 No Info 1.08
2809596 _|Service UNK No Info 54.53 53.82 No Info 22.17
2809597 __—|Service UNK No Info 49.62 48.44 No Info 0.91
2809618 Service UNK No Info 28.8 28 No Info 3.52
2809669 Service UNK No Info No Info No Info No Info 1
No Sewer Connection Points found...
This document may not, in whole or part, be copied, photocopied, reproduced or Page 3 of 3

translated without prior consent from the CEO, Unitywater.
Printed copies are uncontrolled.

 

Page 42

Appendix

Stormwater
Attenuation
Spreadsheets

 

Page 43

DETENTION TANK DESIGN — TH1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rainfall intensities (mm/hour) Title Page
ARI years) 1 2 10 50-100
5 minute 130 165 «= 224281320
tommurestorm  00«127,—=«173,=« aT 280 f yoar AR RQROEEED
30 minute storm 602 765 105 138 182 nydrograph
60 minute storm 406 519 724 961 106 2 year ak
120 minute storm 28 «334 481 851 726 10 year ARIhydrograph
50 year ARthydrograph
‘Catchment information 100 year ARI hydrograph
ATG prosengnent = 309.25 m* pu,
Nedimmganeann = 195 me ["ecinderiytuh, eanedgnescom i) aaa
ATe2 peameetgeen / = 13425 im? | Medium 2211 petmeabiny al
fipemexoren = [o00[*) (henceCy= 87 }
f passeacomen ces) = [100 [~) (henceCy= 09 }
f pamsmerpret nceanes = [o6ol~) ¢henceCy= 062 §
OCs = 40 min —— —— Maximum water depth in tank is 1973mm
T.O.C. posaeveiogmert = 6 min |
| |
Detention Tank information |
Gravity = 9.8 mis* |
Aa oe = 2450 ) |
Cs = 062 |
|
|
Tank Outfet Information 4 — — Notes/Help
Orifice Number 1 2 3 4 5 6
Orifice diameter (mm) 50
Orifice invert level (mm) (=== |
Peak combined outflow from catchment (m*/s)
ARI (Years) 1 2 10 50 100
QPre QPose Qere QPoest Qpre Qrosr Orr QPost QPre Qrose
§ minute storm 0.00 4.08 0.00 §.28 0.00 7.92 0.00 11.16 6.00 12.49
10 minute storm 4.75 4.94 6.41 6.39 10.27 9.55 15.92 13.57 18.29 15.12
30 minute storm 6.60 §.59 TAT 7.28 12.22 11.02 17.01 14.64 19.55 16.33
60 minute storm 487 5.01 6.61 6.61 10.85 10.27 15.58 14.05 17.93 15.69
120 minute storm 3.65 3.92 4.98 §.22 8.44 8.42 11.57 14.31 43.47 12.74
Maximum tank depth (mm)
ARI (Years) 1 2 10 50 100
§ minute storm 183.6 272.4 507.7 822.0 929.7
10 minute storm 260.2 395.0 7545 | 12446 | 1412.0
30 minute storm 323.4 500.4 991.5 | 1562.1 | 1787.9
60 minute storm 283.3 455.2 962.8 | 1664.6 | 1913.0
120 minute storm 199.1 325.0 756.0 | 1242.8 | 1475.9

 

 

 

 

 

 

 

 

Page 44

DETENTION TANK DESIGN — TH2

 

Medium density bush, ot good grass cover. of
Medium soil perme aby [y)

[0.00 [=]
| 109 (=)
lz)

 

 

 

 

Page 45

DETENTION TANK DESIGN — TH3

Rainfall stensities (mm/hour) Title Page

 

 

ARI (years) 1 2 10 50 100
5 minute storm 130 165 224 291 320
1Ominnestom 100 127 173° «227-250 ‘Tysar ARI hydrograph
30 minute storm 602 765 105 138 152 2 ARID
6Ominute storm 40.6 «519-724 «98-1108 sine, ARI RROD!
120 minute storm 26 334 484 65.1 726 10 year ARIhydrograph
50 year ARthydrograph
Catchment information 100 year ARI hydrograph
Area = 299.25 wf =
— 2 | Medium density bush.o good grass cover, or HH *!
Al€2 sompaceaee poranez, = 165m = -
hea = 194.25 m? [Medium solpermeabiny [=] Analysis Results
Soanamer = [ooo[y) (henceCy= 07 J
t E = [ico [¥) (henceCy= 09 )
fh pomoemusnet :poranes, = jo6o|~) (nenceCy= 062 ) cif
T.0.C. peemmcpewe = 10 min i Maximum water depth in tank & 1754mm
TOC paeapane = 6 min |
} |
|
Detention Tank information
|
Gravity = 98 ms* | |
Adan = 245 mt |
Cy = 062 |
Tank Outiet Information — = Notes/Help
Orifice Number t 2 3 4 5 6

Orifice diameter (mm) 50 [ 1
Orifice invert level (mm)

 

Peak combined outflow from catchment (m7/s)

ARi (Years) 1 2 10 50 100

OPre QPost Qrre Qpost Qrre Qeosr Qpre Qpost QPre Qros
§ minute storm 0.00 4.01 0.00 5.20 0.00 7.82 0.00: 11.03 0.00 12.36
10 minute storm 4.59 4.83 6.20 6.26 9.94 9.39 15.40 13.36 17.70 14.91
30 minute storm $42 5.47 7.32 7.13 11.82 10.83 16.46 14.42 18.91 16.09
60 minute storm 4 4.89 6.39 6.46 10.49 10.06 15.07 13.80 17.35 16.42

120 minute storm ted 3.81 4.82 5.08 8.17 8.21 11.20 11.04. 13.03 12.45

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Maximum tank depth (mm)

 

 

5 minute storm 170.0 251.9 469.6 161.3 861.5
10 minute storm 239.7 364.0 696.7 | 1151.9 | 1307.5
30 minute storm 296.9 459.5 912.7 | 1438.2 | 1647.0
60 minute storm 258.7 415.4 897.9 1615.7 | 1753.7
120 minute storm 181.8 295.9 688.4 | 1131.8 | 1346.5

 

 

 

 

 

 

 

 

 

 

 

 

Page 46

DETENTION TANK DESIGN — TH4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rainfall Intensities (mayhour) Tittle Page
ARS (years) 1 2 10 50 100
fomusomm = 10) 1273.2? 4 year ARI hyarograph
comunccorm 408 1d 72481108 2yner Arent
120 minute storm 26 «4334 «481 «851 728 10 year ARIhydrograph
50 year ARihydrograph
Catchment information 100 year ARI hydrograph
aaa See eee i ty buth, or good grass cover, ar)
Mies SO Aras Re
‘ecacuee = [oool) ¢henceCy= 07 )
1, paonmoren eres = [ico |~) ¢henceCy= 09
4, pommenonere promaret, = [oso|+) (henceCy= 062 ) Duh
T.O.C. peecmenonert = 10 min — = Maximum water depth in tank is 1754mm_
T.O.C. pesmatomee = 6 min
Detention Tank information |
Gravity = 9.8 mis? |
NOdan = 245m? |
Ge = 062 i |
Tank Outlet information | —— 1 Nores/Help
. Orifice Number 1 2 3 4 5
haters Se
Peak combined outflow from catchment (m*/s)
AR! (Years) 2 10 50 100
Qre | Qross | Qpre | Qrox | Qrre | Qpose | Qrre | Grose | Qre | Qros
5 minute storm 0.00 401 0.00 5.20 0.00 7.82 0.00 11.03 0.00 12.36
10 minute storm 459 4.83 6.20 6.26 9.94 9.39 1640 | 13.36 17.70 14.91
30 minute storm §42 547 1.32 113 11.82 10.83 16.46 14.42 18.91 16.09
60 minute storm 47 489 6.39 6.46 10.49 10.06 | 15.07 43.80 17.35 15.42
120 minute storm 3.53 3.81 4.82 5.08 8.17 8.21 11.20 11.04 13.03 12.45
Maximum tank depth (mm)
ARI (Years) 1 2 10 50 100
5 minute storm 170.0 | 251.9 | 4696 761.3 861.5
10 minute storm 2397 | 364.0 696.7 | 1151.9 | 1307.5
30 minute storm 296.9 | 459.5 9127 | 1438.2 | 1647.0
60 minute storm 2587 | 415.4 897.9 | 1515.7 | 1753.7
120 minute storm 181.8 | 296.9 688.4 | 1131.8 | 1345.5

 

 

 

 

 

 

 

 

Page 47

DETENTION TANK DESIGN — TH5

 

4 year ARI hydrograph

2 year ARI hydrograph |
10 year ARIhydrograph

50 year ARIhydrograph
100 year ART hydrograph |

Medium density bush, ot good grass cover, or H. |
Medium soil permeabaey {x

 

 

 

 

Page 48

DETENTION TANK DESIGN — TH6

1 year ARthydrograph
2yearARthydrograph |
|

ush, 01 good grass cover.ot HY |
= Analysis Results

 

Page 49

DETENTION TANK DESIGN — TH7

Medium density bush, of good grass caver. oF

 

Page 50

DETENTION TANK DESIGN — TH8

 

Medium density bush, or good grass cover. oH |

Medium sollpeumeabsty =

| 0.00 |x)
| 100 |=}
lw)

 

 

 

 

Page 51

DETENTION TANK DESIGN — TH9

 

Medium density bush, or good giass cover, orl |
Medium soilpermeabaay ly)

 

 

 

 

Page 52

DETENTION TANK DESIGN — TH10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rainfall imensities (mmvhour)
ARI (years) 1 2 10 50 100
5 minute storm 130 «168 «Cis 291 320
10 minute storm 400-127-173 Fs 28
30 minute stom 602 765 105 138 152
60 minute storm 406 519 724 961 106
120 minute storm 26 334 481 65.1 726
Catchment Information
Are; = 309.25 m*
a eee ‘en a 475 m_ | Medium density bush oc good grass cover. H™
ea = 134.25 mn? | Mecum sod permeabary [) Analysis Results
es = [oool+) ¢menceCy= 07 J
i pocemiopret (curines = |icoly) (meneCy= 09 }
i pumonengret arcetares) = foeol™) theneCe_= 082 j
T.0.C. preceeinpmect = 40 min TI Maximum water depth in tank is 1973mm
T.O.C. pesometoprant = 6 min |
Detention Tank information
Gravity = 9.8 ms* |
ATE8 ore = 24507 |
Cy = 062 | |
|
Tank Outlet information = Notes/Help
Orifice Number 1 2 3 4 5
Orifice diameter so [ 1
orice invert evel tm) a
Peak combined outflow from catchment {(m*/s)
ARI (Years) 1 2 10 50 100
OFre QPos Ore Qros Qrr QPost Qrre QPpost QPre Qrosx
§ minute storm 0.00 4.08 0.00 5.28 0.00 7.92 0.00 11.16 9.00 12.49
10 minute storm 475 4.94 641 6.39 10.27 9.55 15.92 13.57 18.29 18.12
30 minute storm 5.60 559 TS 7.28 12.22 11.02 17.01 14.64 49.56 16.33
60 minute storm 4.87 §.04 6.61 6.61 10.85 10.27 15.58 14.05 17.93 15.69
120 minute storm 3.65 3.92 4.98 §.22 8.44 8.42 11.57 11.31 13.47 412.73
Maximum tank (mm)
AR! (Years) 1 2 10 50 100
§ minute storm 183.6 272.4 507.7 822.0 9297
10 minute storm 260.2 395.0 7545 | 1244.6 | 1412.0
30 minute storm 323.4 500.4 $81.5 1562.1 | 1787.9
60 minute storm 283.3 455.2 982.8 1654.6 | 1913.0
120 minute storm 199.4 325.0 756:0 1242.8 | 1475.9

 

 

 

 

 

 

 

 

 

Page 53

DETENTION TANK DESIGN — TH11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rainfall imensities (mm/nour) Title Page
ARI (years) 1 2 7 80 100
Sminuescom 130165224281 320
10minue storm = 1001271732250
30minutestom = 602-765) 105 138152
6Ommurestorm 406 S19 724 96.1 106
120 mite storm 2% 334 481 651 726
Catchment information
= 294.25 mt =
ers i 5 160. mt_ | Medien denstybush-o good ats cover Hs)
neal 5 jen? | Mecium scil perme abixy {=} ‘Aneiyals Resutts
4 preamp = |ooo +| (menceCw= OF 3
f pare foxy = [100 (=) (henceCy= 09 )
fi pomcmsaicraar pneu = Josoly) ¢menceCe= 082 ) Csiteas Contigursticn
TOC) peso = 10 min aaa -— Maximum water depth in tank is 1675mm
ey = 6 min |
Detention Tank information |
Gravity = se ms*
Ae2 wn = 245 mF |
cy = 062
Tank Outlet information Naeger Fae te | ‘Neseaiilet
Orifice Number 1 2 3 4 5 6
‘Orifice diameter (mm) 5a
Orifice invert level (mm)
Peak combined outflow from catchment (m*/s)
ARI (Years) t 2 10 50 100
Qrre Qpose QOPre QPost Qrre QPost Opre Qrese Qrre QPost
§ minute storm 0.00 3.98 0.00 5.16 0.00 7.76 0.00 10.97 6.00 12.30
10 minute storm 452 497 6.10 §.20 977 9.30 15.15 13.26 17.40 14.80
30 minute storm §.33 541 720 7.06 11.62 10.73 16.18 14.30 18.60 15.96
60 minute storm 4.63 4.83 6.29 6.39 10.32 9.96 14.82 13.67 17.06 15.28
120 minute storm 347 3.75 474 5.01 8.03 8.11 11.01 10.91 12.81 12.30
Maximum tank depth (mm)
ARI (Years) 1 2 10 50 100
§ minute storm 163.4 241.9 450.8 7313 827.7
10 minute storm 2297 348.7 668.1 1105.9 | 1255.9
30 minute storm 283.8 439.4 873.9 | 1377.2 | 1577.5
60 minute storm 246.8 396.4 856.4 1447.3 | 1675.4
120 minute storm 134 281.7 655.4 1077.5 | 1281.6

 

 

 

 

 

 

 

 

Page 54

DETENTION TANK DESIGN — TH12

 

1 year ARI hydrograph
2 year ARI hydrograph
10 year ARIhydrograph
50 year ARIhydrograph

100 year ARIhydrograph |

Tu 25] AnalysisResulis |
| 0.00 |»)

= [x00 |] Y

ir]

 

 

 

 

Page 55

DETENTION TANK DESIGN — TH13

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rainfall intensities (mm/hour) Title Page
ARt (years) ' 2 170 «50 = 100
Sminste storm 120,—S 165224291320
{@minctestorm = 100,127, «173,-=S «207250, f year ARI hyemagreph
J0mmutestom 602 765 105 138 152 2 year ARIhydrograph
60 minute storm = 406 519724 «981108
120 minute storm 2 «304481851726 10 year ARIhydrograph
50 year ARIhydrograph
Catchment information 100 year ARt hydrograph
Ae: = 227m
A See ace = 460 es | Medium density bush, o: goodgrass cover, or *) eae
ATCA pesematonet promis = 67 m2 | Medium soilpermeabsty {=} ___AnayysisResuns |
{easement =[Joco[s) ¢nenceCe= 07 )
{ peumeanpant james = |100 [=| (henceCy= 09 )
Ny poasmmeosret wma = fosol») (henceCy= 062 ) Critive costijaretes
T.O.C. sencmetsonact = 10 min ta = —} Maximum water depth in tank is 1675mm
T.O.C, serene = 6 min |
Detention Tank information |
Gravity = 9B mvs? |
Area wre = 245m? |
Cs = 062 | |
Tank Outlet information PaaS Eee reall Notes/Help
Oritice Number 1 2 3 4 5
Orifice diameter (nm) 50
‘Orifice invert level (mm)
Peak combined outflow from catchment (m7/s)
ARI (Years) 1 2 10 50 100
Qrre QPost QPre QPosr QPre Qrosz Fre QPast Ore QPost
5 minute storm 0.00 2.89 0.00 3.68 0.00 §.33 0.00 1.23 0.00 7.97
10 minute storm 3.49 3.56 4.70 457 754 6.68 11.68. 9.21 13.43 10.14
30 minute storm 4.11 3.99 §.55 §.13 8.97 7.62 12.48 9.97 14.35 10.99
60 minute storm 3.57 3.61 4.85 42 196 721 11.43 272 13.16 10.73
120 minute storm 2.68 2.90 3.66 3.85 6.20 6.14 4.49 8.14 9.88 9.07
Maximum tank depth (mm)
AR! (Years) 1 2 10 50 100
5 minute storm 163.4 241.9 450.8 031.3 827.7
10 minute storm 229.7 348.7 668.1 1105.9 1255.9
30 minute storm 233.8 439.4 873.9 1377.2 1577.5
60 minute storm 246.8 396.1 856.4 1447.3 1675.4
120 minute storm 173.4 281.7, 655.4 1077.5 1281.6

 

 

 

 

 

 

 

Page 56

DETENTION TANK DESIGN — TH14

 

Title Page |

T year ARI hydrograph
2 year ARI hydrograph
10 year ARIhydrograph
50 yearARihydrograph =|

100 year ARIhydrograph |
159 m?_ | Medium density bush. of good grass cover.oi Hl *
‘Medium 201 perme abiay

5

s|_| 0.00 |=)
| 100 [=] Q
Ly]

Notes/Help j

 

 

 

 

Page 57

DETENTION TANK DESIGN — TH15

 

t year ARI hydrograph

2 year ARI hydrograph

10 year ARI hydrograph

50 year ARihydrograph
"400 year ARI bydrograph

Medium density bush, o1 good grass cover, oH)

——— S snares |

 

 

 

 

Page 58

DETENTION TANK DESIGN — TH16

 

1 year ARI hydrograph
2 year ARI hydrograph
10 year ARthydrograph
50 year ARInydrograph

100 year ARIhydrograph |
Medium density bush, ot good giass cover. or H|¥
Medium soil perme abaty

 

 

 

 

Page 59

DETENTION TANK DESIGN — RESIDENTIAL LOT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rainfall wtensities (mm/hour) Tate Page
ARI (years) 1 2 70 8650 100
Sminntestorm =» «130,185 224281320
{Ommutestorm 100 127,-«S 173,280 1 year ARI RyGOgreph
30 minute storm 60.2 76.5 105 133, 182
COminutestorm = 40.6 «51.9724 «88.1106 zen ARES
120 minute storm 28 «4334 481 651 726 10 year ARIhydrograph
50 year ARthydrograph
Catchment information 100 year ARS hydrograph
ATCA pronevpaent = 200m ca
a a, = 200 m?_ | Mediumdensity bush. or good grass cover, of Hs] .
N02 puamecpeen pecatones z gm? | Medium sal pemeabity (=) |
et = [oooly) (neneCy= O07 )
a = [100 [*) (neneCy= 69 }
f peepee (etch = Jo6o[y) ¢henceCw= 082 ) “!
me = 10min — Maximum water depth in tank is 1927mm
T.O.C. puma = 6 min |
Detention Tank information |
Gravity = 9.8 mis* }
Alea os = 245m
Ca = 062 |
|
Tank Outlet information Ss Notes/Heip
Orifice Number 1 2 3 4 5 6
Orifice diameter (mm) 55
Orifice invert level (mm)
Peak combined outitow from catchment (m*/s)
ARI (Years) 1 2 10 50 100
Qrre Qposr Ore Qrost Qrre Qros Pre Oost Qrre QPosr
§ minute storm 0.00 2.61 0.00 327 0.00. 4.61 0.00 5.96 0.00 6.36
10 minute storm 3.07 3.16 4.14 3.99 6.64 5.66 10.29 137 11.83 Tat
36 minute storm 3.62 3.54 4.89 449 7.590 64T 11.00 8.19 12.64 8.78
60 minute storm 3.15 3.24 4.27 421 7.01 6.34 10.07 8.33 11.60 8.99
120 minute storm 2.36 2.64 3.22 3.48 5.46 5.49 748 711 8.71 778
Maximum tank (mm)
ARI (Years) 1 2 10 50 100
§ minute storm 187.4 279.7 §275 863.0 978.9
10 minute storm 261.6 401.3 780.7 4304.4 1484.8
30 minute storm 321.4 502.2 1043.3 | 1604.3 | 1840.5
60 minute storm 275.0 444.9 971.8 1658.9 | 1926.6
120 minute storm 191.0 312.5 735.4 4215.9 | 1449.8

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
18.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 4 - Engineering Report.pdf · 18.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.